Predicting responses of resources to demand response signals and having comfortable demand responses

Information

  • Patent Grant
  • 9989937
  • Patent Number
    9,989,937
  • Date Filed
    Thursday, July 11, 2013
    11 years ago
  • Date Issued
    Tuesday, June 5, 2018
    6 years ago
Abstract
An approach where a utility/ISO may dispatch demand response (DR) resources in real time without notification of a DR event. DR dispatches may involve sending specific load level commands to power generators that can respond to such commands in a predictable fashion. DR resources do not necessarily have the same level of control or predictability in their load responses. Accuracy of predicting a DR resource's response to a DR signal may be improved by restricting the DR signal to predefined finite values and, for each predefined finite value, have the DR resource continuously report back what its load response will be if one of those signal values is sent as a DR signal. A DR performed against a home may result in discomfort. But there may be a sufficient recovery rate for regaining the setpoint of a thermostat to attain comfort of the home within a reasonable period of time.
Description
BACKGROUND

The present disclosure pertains to utility resources and particularly to assessment and distribution of the resources. More particularly, the disclosure pertains to beneficial management of resources and their loads.


SUMMARY

The disclosure reveals an approach where a utility/ISO may dispatch demand response (DR) resources in real time without prior notification of a DR event. Fast DR dispatches may involve sending specific load level commands to power generators that have little problem responding to such commands in a fairly predictable fashion. DR resources do not necessarily have the same level of control or predictability in their load responses. Accuracy of predicting a DR resource's response to a DR signal may be improved by restricting the DR signal to predefined finite values and, for each predefined finite value, have the DR resource continuously report back what its load response will be if one of those signal values were to be sent as a DR signal. A DR performed against a home may result in discomfort. But there may be a sufficient recovery rate to regain a setpoint of a home thermostat so as to attain comfort of the home within a reasonable period of time.





BRIEF DESCRIPTION OF THE DRAWING


FIG. 1 is a diagram of a layout having a utility/independent system operator (ISO) and demand response resources;



FIG. 2 is a diagram of a table showing a basis of the scoring function for selecting demand response resources;



FIG. 3 is a diagram of a graph indicating activity of an operator interface showing a current state of resources and a set of options for various levels for dispatches;



FIG. 4 is a diagram of an implementation of demand response and resource signals in a demand response arrangement of a utility/ISO and a resource;



FIG. 5 is a diagram of a demand response arrangement having remote control relative to a utility and a resource incorporating incentives for a resource to not opt out or to opt in a demand response program;



FIG. 6 is a diagram of a utility/ISO that may utilize a demand response management system for providing utility defined signals to a demand response resource;



FIG. 7 is a diagram of a utility/ISO that may utilize a demand response management system for providing customer defined signals to a demand response resource; and



FIG. 8 is a diagram of a utility/ISO that may utilize the demand response management system for translating utility defined signals to customer defined signals for the demand response resource.





DESCRIPTION

The present system and approach may incorporate one or more processors, computers, controllers, user interfaces, wireless and/or wire connections, and/or the like, in an implementation described and/or shown herein.


This description may provide one or more illustrative and specific examples or ways of implementing the present system and approach. There may be numerous other examples or ways of implementing the system and approach.


Automated demand response (ADR) programs may be used in a number of different customer market segments ranging from large commercial and industrial to small commercial and residential. A diagram of FIG. 1 shows a layout 10 of a utility/ISO 11 and DR resources 12. Utility/ISO 11 may enroll customers into demand response (DR) programs and model them as so called DR resources 12 that they can call upon when it is necessary for utility 11 to initiate a DR event 13. Calling upon a DR resource 12 typically means that the utility/ISO 11 “dispatches” the DR resources by sending them DR signals 14 which affect their load consumption in some predictable fashion. A pre-cursor to initiating a DR event 14 is the establishment of a set of objectives that need to be accomplished during the DR event. Such objectives may include the following items: 1) A specific amount of load response over some period of time (load responses may entail both reduced and increased levels of consumption); 2) Loads associated with a specific grid and/or geographic locations; 3) A specific type of loads; and 4) Loads with minimum response times and latencies.


When a utility 11 initiates a DR event 13, the utility may typically select some subset of the available DR resources 12 from the collection of all possible DR resources that meets the objectives as outlined above. Each DR resource 12 may have both capabilities and associated costs with using that resource during an event so the problem to be solved is how best to minimize the overall cost of a collection of DR resources while still using their capabilities to satisfy the overall objectives of the DR event 13. Furthermore, in the case of so called “Fast DR”, which may require dispatches to happen in real time, it may be necessary that the DR resource 12 selection process be automated and not require human operator involvement.


The present system may solve the requirement for optimizing and automating the process of DR resource 12 selection for DR events 13 by utilizing a scoring function that can be easily applied against each individual resource to create a ranking of each resource. The scoring function may take into account both the capabilities and the costs associated with using the resource. In other words, the DR resource may have a set of attributes that are used as factors in the scoring function. In some cases, the DR resource attributes may be invariant to specific DR events (e.g., geographic location), but in other cases the attribute may have different relevance or values depending upon the specific DR event. For example, if it is a requirement that the DR event happens between 2 pm and 4 pm, but a specific DR resource is not available during those hours, then it should receive a score that ranks it in such a manner that it is not chosen.


Furthermore, the scoring function may have a form that supports operations by the utility operator. Such operations may incorporate: 1) An ability to select which resource attributes may be relevant in the selection process; 2) An ability to select how the resource attributes may be applied in the scoring function; and 3) An ability to increase or decrease the relevance of a resource attribute in the overall score of a DR resource.


The form of the scoring function described below may support virtually all these features. FIG. 2 is a diagram of a table 16 showing a basis of the scoring function.


The selection process may then be easily automated by simply selecting enough of the highest ranked resources that satisfy the load objectives of the DR events 13.


One step may be to model the DR resources 12 by characterizing them with a set of attributes that specify their load consumption capabilities and their costs. A DR resource's capabilities may be characterized with the following attributes (among others).


1) Forecasted load profiles under normal conditions. These may be the predicted levels of load consumption under normal conditions (i.e., not during DR events) as a function of time. Such forecasts may sometimes be referred to as baselines. It may also be dependent upon not only time but may incorporate other factors such as weather or building operational state in view of occupancy.


2) Forecasted load profile capabilities during DR events 13. The profile capabilities may be the predicted levels of load consumption during DR events as a function of time. It could be as simple as a single value or as complex as a multi-dimensional load profile. A load profile's dimensions might include things such as time and dispatch levels.


3) Real time load profiles. The load profiles may be determined in real time based upon real-time feedback from a resource. The profiles may include such things at the current load consumption (i.e., metering) and the current state of the load controller.


The current state of the load controller may provide additional insights into what may be possible if a DR signal 14 is sent to resource 12. For example, if resource 12 is a light and the light is already off then the utility will not be able to get that resource to reduce its consumption by sending it a signal 14.


4) Availability schedules may give the dates and times that the resources are available. A DR resource 12 may also have a cost associated with using that resource. Within the context of this approach, the term cost may be used in a general sense and represent many different dimensions including the following items (among others).


5) Utility fixed financial cost associated with using the resource may be the amount of fixed money that must be spent by the utility 11 for a resource 12 to participate in an event 13.


6) Utility performance based financial costs may be the costs associated with how much money utility 11 must spend to use resource 12 based upon its performance during an event 13. The costs may be based upon such factors as time of day and amount of load response with respect to some baseline. The costs may also be based upon some bid that was submitted by the resource owner.


7) Resource owner financial cost may be another item.


8) Resource owner inconvenience cost may be a qualitative cost that reflects the impact on the resource owner during event 13. The cost may reflect things such as discomfort or necessary changes in the resources owner's operations.


9) Mileage left on resource 12. Often the amount of time or frequency that a resource can be called upon may be constrained either by the user or by the utility program. For example, a resource may be limited to twelve DR events 13 in the course of a year. Thus, a resource that has been called for eight events may have less remaining mileage than one that has only been called for four events.


Other attributes may be used in addition to or in lieu of the one or more above-noted ones. Each of the above attributes may be used as a factor having a value in a scoring function to determine an overall score of a resource within a context of specific DR events and their objectives.


The scoring function may take the following form as at least partially illustrated in table 16. F1, F2, . . . , Fn may be represent the scoring factors. Each Fn, i.e., scoring factor, may correspond to a different attribute of the DR resource and have a value from zero (0) to one (1) that represents how well that a selected individual attribute satisfies the overall objectives of a DR event 13. In general, a value of “one” means that a resource 12 has the highest possible relevance or value with respect to an attribute, and likewise a value of zero means that a resource 12 has the lowest possible value or relevance with respect to the attribute. For example, if F1 represents financial cost then a value of zero would mean that DR resource 12 may have the highest possible financial cost (e.g., the most expensive of all resources) and a value of one would mean that it is the cheapest of all resources.


Table 16 of FIG. 3 shows factors, values and attributes for determining a score for a DR resource. The attributes may be selected from the nine listed above. Factors F1 through F9 may be associated with attributes, respectively. Values, which range from 0 to 1, may be represented by the letters A, B, C, D, E, F, G, H and I, respectively. A score for the DR resource 12 may be determining by adding up the values for each of the listed attributes. Other attributes may be added. Some attributes may be deleted. The scoring function may be customized with respect to needs of the demand response situation at hand. The score may be normalized for comparison with the individual values of the attributes.


The different factors can be applied in the sco (standard choice offer or stranded cost obligation) approach.


In the case of a so-called “Fast DR”, the utility may dispatch the DR resources 12 in real time without any prior notification of a DR event 13. Fast DR dispatches may involve sending specific load level commands (e.g., 15 MW) to generators that have no problem responding to such commands in a fairly predictable fashion. Demand response resources 12 unfortunately do not necessarily have the same level of control or predictability in their load responses. It can be difficult to know precisely what a load response from the DR resource will be at any instance because the load response may be dependent upon the following items: 1) The DR signal 14 that is being sent; 2) The current state of the loads being controlled by the DR resource 12; 3) The DR strategies being implemented by the DR resource 12; and 4) Extraneous factors such as weather.


The utility/ISO 11 may perform some sort of regression analysis on past performance of the DR resource 12 to predict what may happen in the future (e.g., baselines). This approach may have major flaws in that there is often a lack of history to properly predict what the behavior will be and the predictions furthermore do not take into consideration the current state of the DR resource 12. In short, the predictions are not necessarily very accurate.


The present approach may improve the accuracy of predicting a DR resource's response to a DR signal 14 by applying the following principles: 1) Restrict the DR signal 14 to a set of predefined finite values (e.g., NORMAL, MODERATE, HIGH, and so forth); and 2) For each of the predefined finite values, have the DR resource 12 continuously report back what its load response will be if one of those signal values were to be sent as a DR signal.


The present approach may have the following benefits. 1) Since the DR signal 14 can be of a set of finite values, the DR resource 12 does not necessarily have to support a continuum of values and may more closely match the way in which DR strategies are typically developed. 2) The set of finite values may make it easier for the DR resource 12 to determine what its DR response will be at any given time. 3) Since the DR resource 12 is reporting its response in the same terms as the signal itself, there is no need for the utility/ISO 11 to model the resources' DR strategies or loads.


The utility/ISO may use a demand response management system (DRMS) for managing its DR programs. The DRMS may be responsible for presenting the utility/ISO 11 operator with a user interface to manage the DR program and for interacting with the DR resource automation systems to both send DR signals 14 to and receive feedback from DR resource 12. In the case of a fast DR, the operator may have an interface as shown in FIG. 3 that may show the current state of the resources and present the operator with a set of options for what levels they may dispatch the resources to. In the case of FIG. 3, there is only a single DR resource 12 being shown that may respond to DR signals 14 and the finite signal levels are low, moderate, and high.


DR resource 12 may be in constant communications with the DRMS and continuously report what its load response in MW will be if it were to receive any of the predefined signals. On the graph of the operator interface may be depicted the actual load response 26 versus time for DR resource 12 both past and potentially in the future. For times in the future, the different potential load responses may be shown as flat lines 21, 22, 23, 24 and 25 that are based upon feedback received from DR resource 12. In this way, the operator may know precisely what the DR resource's potential load response will be in real time based upon the most accurate source of information, which may be DR resource 12 itself.


Although FIG. 3 only shows a single DR resource, the concept may be extensible to an aggregation of multiple resources. The potential DR resource responses may be aggregated together in the following ways. 1) The response values for each of the signal types may simply be added together and the operator still may have only a small finite number of possible dispatch levels. 2) The various response levels or values may be combined together in such a way that the operator has in essence a more refined number of levels that can be dispatched. With way 1, the number of levels that the operator can use may correspond directly to a number of levels supported by the resources. For example, if all of the resource support was just a MEDIUM or HIGH level, then the operator may only have available to her/him a setting of MEDIUM or HIGH. If the operator chooses MEDIUM, then the same medium signal may be sent to all of the resources and the expected response can be as simple as the MEDIUM level of each resource added together. In way 2, the operator can set the desired amount of shed to send and each resource may be sent a different signal to achieve that level. Resource 1 might get a MEDIUM signal and resource 2 might get a HIGH signal. The point of way 2 is that the combinatorics of all different levels of all the different resources may lend to a much larger number and more refined number of settings that the operator can specify.


When using way 2), with enough DR resources in the aggregate group, the operator may have what would appear to be a continuous number of different dispatch levels that could be chosen including from those that would only dispatch some subset of the available resources. These combinations of resources may be selected in some automated fashion so that the operator would only need to select the level that is desired for dispatch and that the DRMS may select the optimum subset of DR resources 12 to fulfill that objective.


The approach for the DRMS to send DR signals and receive feedback from the resources may use established specifications such as an open ADR.


A comfortable demand response may be noted. DR performed against a home may result in discomfort for a homeowner. Part of a goal may be a recovery rate sufficient to regain a setpoint of a thermostat in the home so as to attain comfort of the home within a reasonable period of time.


Each home may recover to the setpoint differently because of its size, tightness of the construction, size of HVAC equipment, and much more.


A ramp rate score for a home or business may be created. This score may be used to determine the level of demand response that can be performed. For instance, a house #1 may be old and leaky. When a DR event is performed, the temperature of this house may change +5 degrees during the DR event. After the event, the time to reach setpoint may be 2 hours.


In another instance, a house #2 may be a new home and built tightly. When a DR is performed, the temperature of this house may change by +5 degrees during the DR event. After the event, the time to reach setpoint may be 1 hour.


DR events may be set as being customized for the home by understanding the setpoint recovery rate. By performing a test DR event and measuring the recovery to a setpoint, an algorithm may be created and a rating can be placed on a home. The rating may be used to apply a new methodology of DR by the utility. A utility operator may determine that there needs to be a certain amount, e.g., 1 KW, of shed. The operator may select a temperature for an off-set; however, the operator may also set the recovery time for the home.


A utility operator may select plus five (+5) degrees and a recovery to setpoint of one hour (knowing that the homeowners will want a normal planned temperature when they return home). When applying the DR event, homes may be grouped by both temperature and recovery rate.


Home 1 may only have a setback of 2.5 degrees because the recovery takes longer in this home. Home 2 may actually have a setback of 6 degrees because the recovery takes a shorter time in this home.


The homeowners in both instances may be sent a message via text, email or phone or phone app. The message may state the time of the DR event, temperature off-set, and temperature anticipated recovery time.


Utilities may interact with their customers during DR events and send them information (DR signals) during a DR event. A particular type of message may be sent to a customer in a DR event that may incentivize them to participate in a DR event.


An effective resource is especially critical when communities are confronted with a scarcity of a resource in question. It may be noted that “resource” is a term which may have several senses or meanings. “Resource” may refer to energy, commodity, product, load, and so on. In another sense or meaning, “resource” such as a demand response (DR) resource may refer to a customer, user, participant, facility, and so on. In the first mentioned sense, it may refer to electricity, water, gas and natural resources such as oil. A definition of “resource” may be extended to include such things such as water quality and air quality. In this regard, adequate water quality and air quality appear necessary to support a self-sustaining environment.


Resource management, in several senses, may be necessary so that systems can optimize the use of a limited resource. Currently, there are various systems for managing resources in various environments such as buildings, apartments, industrial facilities, and computing systems.


One mechanism that might be used to encourage customers to reduce demand and thereby reduce the peak demand for electricity may be referred to as demand response (DR). Demand response may refer to management of the demand by customers in response to supply conditions. For example, electricity customers may reduce their consumption at critical times and/or costs in response to market prices. These customers may be regarded as DR resources.


DR programs may require that a utility and/or independent system operator (ISO) deliver DR signals to customers or participants via a communications channel. The programs may relate to a distribution of resources such as, but not limited to, electricity, water and natural gas.


DR signals may incorporate business level information, such as prices, reliability and shed levels. At some point, from the utility/ISO to loads in a facility, the business level information sent by the utility/ISO should be processed and used to execute a DR strategy and program for the facility.


DR programs may take many forms. They may differ from normal rates and tariffs in that the DR programs are designed to allow the utility/ISO take specific actions to influence the load profiles of facilities that participate in the DR programs at peak consumption times or periods on a grid. The peak consumption periods may cause critical grid reliability issues which should be addressed, but they may also trigger economic factors where the price of electricity or other power commodity reaches a critical level which may be ameliorated by reducing the overall consumption on the grid during those periods. The critical periods, in which the utility/ISO needs to influence a load profile of a facility, may be referred to as DR events.


A manner in which a utility/ISO may influence a load profile of a facility is to send out a DR signal which is specific to the DR event. DR signals may contain information related to businesses, controlling loads, pricing, and so on. There may be an automated DR where the DR signals that are sent out by the utility/ISO are responded to in an automated fashion. Loads within a facility may ultimately be affected by DR events via DR signals to which the facility acts upon or responds. The term “facility” may refer to virtually any location in which there are loads influenced by DR events. A place where there are such loads may be regarded as a “DR resource”. The term “utility” may be used in a general sense to refer to a utility, independent system operator, service provider, and the like.


To provide a context for a mobile communication approach, the present disclosure reveals an implementation of DR signals which may be noted in a demand response arrangement 20 on a diagram of FIG. 4. System 20 and associated software may be obtained and operated with one or more computers/controllers (controllers) 11, 12 and respective connections. The arrangement may be a system that is used by utilities/ISO's to manage the operation of DR programs. A focus of the arrangement may be on the operational aspects of managing the selection, signaling and monitoring of the DR resources that are participating in DR programs. The arrangement may be specifically designed to manage operations of automated DR programs.


There may be various types of interactions that might occur between the utility/ISO and a DR resource as part of a DR program. FIG. 4 is a diagram of an example interaction between a utility/ISO 11 and a DR resource (customer) 12. There may be DR signals 14 going from utility/ISO 11 to DR resource 43. There may be DR resource signals 30 incorporating information, such as load measurements, going from DR resource 12 to utility/ISO 11.


Terms such as customer, client, user, participant, DR resource, and like terms, may be used, interchangeably or distinct from one another, depending on a context of a pertinent portion of a description or a claim.


A description of DR signals 14 may be noted. At a high level, there may often be some sort of grid condition, be it economic or grid reliability in nature, which triggers a so-called DR event that requires some sort of interaction between the utility/ISO 11 and its customer 12. This interaction may eventually trigger some sort of load control taking place at a customer's facility. The interaction between the utility/ISO 11 and the customer 12 may be mediated by DR signals 14 and DR resource signals 30, i.e., information such as measurements. Signals 14 and 30 may represent communications between utility/ISO 11, and the DR resource or customer 12. Information contained within DR signals 14 may dictate where much of the decision-making takes place relative to, for example, in how the initial grid condition, which triggered the DR event, results in the eventual load control.


A computer or controller may incorporate one or more inputs, a processor, a user interface incorporating a keyboard, a display and a touch screen, a memory, external connections such as an internet, one or more outputs, and so forth. The computer or controller may be utilized with virtually all items in and pertinent to FIGS. 1-8.


Automated demand response (ADR) programs may be used in a number of different customer market segments ranging from large commercial and industrial to small commercial and residential areas. The number of small commercial facilities may typically outnumber the larger commercial and industrial facilities by an order of magnitude. In addition, the large commercial and industrial facilities may typically have a dedicated staff and a larger budget for installing the equipment necessary to participate in ADR programs.


There may be a use of mobile devices to receive notifications and manage energy based upon location. Utilities may increasingly communicate with their customers to enable them to better manage their energy usage. Communications of these utilities may range from sending their customers energy prices to notifying them of upcoming DR events. In addition to sending their customers information, the utilities may also allow their customers to communicate with them to perform such functions as opting out of DR events or submitting bids as part of a DR program. The increased communications with utilities may create new opportunities for customers to save money by more actively controlling their energy consumption. The approach by which a customer controls its energy consumption may increasingly be done by some sort of automation in the form of a so-called energy management system (EMS). Any system that is capable of controlling customer loads which consume energy may be considered as an EMS. An EMS may be as sophisticated as an industrial control system or as simple as a thermostat. An EMS may be at a facility of a customer.


One approach by which customers and utilities currently communicate may be via the internet and some sort of computer system which requires the customer to be at some fixed location. Here, interactions may be via email or perhaps via some web-based application. Likewise, the way that the customer typically interacts with its EMS may be either directly at the facility with the EMS, or via some computer-based terminal or user interface. None of these interactions may be possible if the user is not at a location that will support the respective interaction.


What is needed is an approach for the customer to interact with the utility or an EMS at a facility in a more convenient fashion that is flexible and can go anywhere that the customer goes. In addition, since the customer is mobile, what is needed may be a way for the customer to receive communications from the utility and to interact with a facility EMS in a fashion that is relevant to its location. A location of the mobile device may affect scenarios or a relevance of knowing something from an item at another location. Examples of where a customer's location is via the mobile device may be relevant in various scenarios relating to utilities and facilities.


A customer with a mobile device may be moving between different facilities in which each facility has its own energy tariff or agreement with potentially different utilities. Examples may include different rates for different regions. A utility may decide to include different facilities in a DR event. A utility may have different agreements, obligations or options with two or more facilities resulting in messages and data from the utility information system being different for various energy management systems of the two or more facilities, respectively. The differences of these items may be noticed by the customer at different locations of the mobile device.


It may be noted that, relative to a facility, sub-systems that the customer may need to interact with may depend upon where the sub-systems are located.


Certain devices, such as cell phones which are becoming more powerful, may become an effective approach for two-way communications and be a prime candidate to allow mobile customers to both communicate with utilities and to interact with their EMS's at various locations.


Mobile devices, such as smart phones, do not necessarily just send and receive messages, but they may provide a way to run fairly sophisticated applications that can be used for remote monitoring and control of energy.


The present approach may use a location of a device as an element to put the communications with the utility and the interactions with a customer's EMS into a context that is most relevant to where the customer is currently located.



FIG. 5 is a diagram of a use case. The diagram may pertain to energy related interactions. The diagram shows a facility manager (FM) 31 that may be responsible for managing the operations of a facility 12 as it relates to energy consumption. The facility manager 31 may be a person responsible for spending virtually all of his or her time managing a large facility operation, or manager 31 could simply be a small business owner that does nothing more than adjusts its thermostat and lights. FM 31 may be at various locations during the course of the day either on or off site of a facility. FM 31 may carry a mobile device (MD) 33. MD 33 may have the following characteristics. It may be a computing device that is easy to transport around, such as a cell phone, pad, smart phone, tablet or laptop. MD 33 may have a way to communicate wirelessly using technologies such as cellular media or WiFi.


MD 33 may have some sort of user interface that can display data or messages communicated via the wireless communications and receive inputs from the FM 31 that can be transmitted on a wireless communications channel.


MD 33 may have a way to run applications to support the user interface either natively or using some sort of web-based browser technology. MD 33 may have a way to determine the location of the device, either by the device itself or by the system with which the device is communicating.


Facility manager 31 may have a mobile device 33 for communication with an energy management system or sub-system (EMS) 34 of a facility 12 and with a utility information system or sub-system (UIS) 36 of utility 11. Mobile device 33 may be used by facility manager 31 to send commands and data 44 to energy management system 34 and to receive messages and data 45 from energy management system 34. Also, mobile device 33 may be used by facility manager 31 to send commands and data 43 to utility information system 36 and to receive incentives to not opt out or to opt in module 42 from utility information system 36. A conveyance medium for the sending commands and data and receiving messages and data, and incentives to not opt out or to opt in, may be a wireless communications channel.


As shown in FIG. 5, a utility 11 may have an information system 36 that is responsible for interacting with the customer with regards to energy consumption matters. UIS 36 may be selected from a wide range of systems and might include a DR management system (DRMS) or some system that is responsible for sending out dynamic rate information.


When the FM 31 is using MD 33 to interact with utility 11, the information that is displayed to FM 31 may be relevant to where FM 31 is located. Such information may include things such as location specific prices, incentives, requests for bids, DR signals and/or messages.


FM 31 may send commands and data 43 back to utility 11, such as bids or perhaps notifications to opt out or opt in of responses, with or without incentives, to DR events. In addition, FM 31 may interact with different utilities based upon his or her location, especially if FM 31 is managing facilities that are in different regions of the country.


In order for the interactions to be location specific, the information and data from UIS 36 displayed to FM 31 as well as the commands and data, with incentives to not opt out or to opt in, sent from FM 31 should be dependent upon the location of MD 33. This may be accomplished in the following ways. The location of MD 33 may be determined by UIS 36, and UIS 36 may just send information that is relevant to that location. UIS 36 may send out information for virtually all of the possible locations of MD 33, and MD 33 may just present the information that is specific to where it is located at that time.


The approach by which the location of MD 33 is determined may incorporate all of the well known methodologies in use today for such purpose. For example, the approach may incorporate a global positioning system (GPS) within MD 33, cellular tower locations, WiFi access point locations, WiFi signal strengths, Bluetooth access point locations, and other remote location communication mechanisms.


Furthermore, it may be possible for UIS 36 to determine the location of MD 33 based upon one of the above methodologies or it may rely on MD 33 to determine its own location and transmit the location to UIS 36.


FM 31 may interact with EMS 34 of facility 12, and use wireless communications to do so. The messages and data 45 transmitted from EMS 34 to FM 31 may be relevant to the particular loads that FM 31 is controlling, and may allow FM 31 to monitor and control EMS 34 in a fashion that best optimizes use by EMS 34 the information received from UIS 36. Examples may incorporate changing thermostat setpoints based on changing prices from UIS 36.


One may note that FIG. 5 does not necessarily preclude or require a scenario where UIS 36 also communicates with EMS 34 directly as may be the case with certain automated DR programs. In fact, a role of FM 31 in such cases may be to make minor adjustments to the EMS 34 automation that is already programmed into a system.


An approach for influencing demand response event performance through a variable incentive signal may be noted. Automated demand response programs may achieve electrical demand reduction by signaling participating electricity consumers (human and mechanical) to curtail energy usage for a certain period of time, commonly referred to as an “event”. Equipment at participating sites may be signaled to change their operating state and use less energy than it would under normal circumstances during the event period. Customers may often be free to “opt-out” and withdraw their participation from DR events, on a per-event basis. When a participant opts out, the total quantity of energy savings of the event may be reduced. If too many participants opt out, then an ability of the demand response program to produce needed results may be severely limited.


A core of the approach is that participating customers may be sent a message offering an incentive to tolerate an ongoing DR event. As an example, at the beginning of a residential demand response event, communication-enabled room thermostats at participating sites may display a notice that a DR event is in-progress and offer a one dollar reward contingent upon the customer leaving the thermostat undisturbed until after a specific time in the future. The customer may be free to opt out anyway, but the customer will not get any reward if the customer does so. As the event progresses, the DR operator may monitor its performance. If the rate of participant opt-outs is greater than desired, room thermostats in the still-participating sites may modify their display to increase the offer to one dollar and fifty cents, two dollars, or ten dollars provided that the human operator continues to cooperate. Through this mechanism, the DR operator may dynamically modulate the rate of opt-outs and therefore the overall productivity of the event. In an urgent event, there is not necessarily any limit to the size of the incentive that can be offered to reduce opt-out performance leakage.


The productivity of a DR event may be addressed by modifying (i.e., adding to or removing from) the pool of participating sites in that event. If too many participants opt out, additional ones may be brought into the event, although they also may very well opt out. The present approach may be different in that instead of modulating the number of participants that are included in the event, it may modulate an incentive signal to keep already-included participants from opting out.


A pattern number one may incorporate an opt-out. First, the demand response operator may schedule a DR event involving a population of participating sites. Second, an electronic signal may be sent to equipment at each participant site, instructing the equipment to enter a state of reduced energy use (e.g., an air conditioning thermostat set to a higher temperature).


Third, a message may be displayed where each affected customer can see the message, informing the customer that a load reduction condition is in effect and informs the customer of the incentive offer to leave the condition undisturbed.


Fourth, some percentage of affected customers may decide that the incentive is not necessarily compelling enough, and choose to opt out of the event. Fifth, the demand response program provider may monitor the rate of opt-out and decide that the rate is too high. Sixth, a message may be displayed where each affected customer can see its changes, informing the customer that the incentive for leaving the equipment undisturbed is now higher.


Seventh, the percentage of affected customers, who reject the incentive and opt out, may decline. Eighth, an overall energy reduction performance of the event may meet the intended goal. Ninth, the end of the event period may be reached. An electronic signal may be sent to all participating equipment releasing the equipment to return to normal operation. Tenth, customers who accepted the offer and remained in the event until its completion should receive their reward.


A pattern number two may incorporate an opt-in. First, the demand response operator may schedule a DR event involving a population of participating sites. Second, a message may be displayed where each affected customer can see it, informing the customer that a load reduction condition in effect and informing the customer of the incentive offer if the customer chooses to participate.


Third, some percentage of invited customers may find the incentive compelling and choose to participate in the event. Fourth, as participants accept the incentive, an electronic signal may be sent to their equipment instructing the equipment to enter a reduced-energy state. Fifth, the demand response program provider may monitor the rate of participation and decide that it is too low.


Sixth, the message may be displayed where each affected customer can see its changes, informing the customer that the incentive for joining the DR event has been increased. Seventh, the percentage of affected customers who accept the incentive and opt in may increase. Eighth, overall energy reduction performance of the event may meet the intended goal.


Ninth, the end of the event period may be reached. An electronic signal may be sent to all participating equipment releasing the equipment to return to normal operation. Tenth, customers who accepted the offer, joined the event, and participated until its completion should receive their reward.


It may be noted that participants who choose to opt out forfeit their incentive. The incentive may only be collected by a participant in choosing to participate until the end of the event period.


A utility/ISO may enroll customers into demand response (DR) programs and model them as so-called DR resources that the utility can call upon when it is necessary for the utility to initiate a DR event. Calling upon a DR resource may typically mean that the utility/ISO sends the DR resource DR signals which affect the DR resource's load consumption in some fashion.


Depending upon the motivating factors for doing DR, a utility/ISO may attempt to affect a DR resource's load profile in a number of different ways such as: 1) Sending price signals to incentivize the DR resource's load consumption behavior; 2) Sending specific dispatch instructions that dictate the amount of load the DR resource should be consuming; and 3) Sending direct load control instructions that put the DR resource's load control in a specific state, i.e., turn a load on or off.


Specific DR programs may typically have a desired mode of interaction specified as part of a program design and the mode may be codified in tariffs that the owner of the DR resource must conform to if the owner enrolls in a DR program. Furthermore, the DR signal that is used in a specific DR program may reflect the desired mode of interaction and thus contain the appropriate information.


For example, a dynamic pricing program (i.e., mode one above) that is designed to cause the customer to shift its load consumption from high peak times to other times of day may send a price in the DR signal. In another example, the DR program may be designed to send dispatch instructions (i.e., mode two) as part of a so called ancillary service to explicitly affect the DR resource's load profile. In this case, the DR signal may contain an explicit load level such as 100 kW.


As noted in the above examples, different DR programs may send DR signals with fundamentally different types of information in the signals. An issue is that this approach may put an undue burden on the systems that must interpret the signals and take the appropriate action, especially if the systems are participating in different DR programs that may have different signals associated with them. Moving a customer from one DR program that uses dynamic pricing signals into a DR program that uses dispatches may require customers to re-program their automation systems to deal with the different DR signals even if their basic load control strategies do not change.


The present system and approach may allow a DR resource 12 owner to specify the DR signals that are sent from the utility/ISO 11 as opposed to the utility/ISO dictating what the signals are. DR resource 12 owners may be allowed to create custom signals that are most appropriate for their systems and operations. This approach may thus help alleviate a need for automated load control systems used by a DR resource needing to interpret different DR signals for different DR programs.


Benefits of the present approach may be the following items: 1) Allow the DR resource to receive and consume a DR signal that is most conducive to the way it operates, thus reducing costs to deploy; 2) Reduce the cost of programming the DR resource's load response by allowing the customers to focus their efforts on programming the load control strategies instead of interpreting and consuming a potentially wide range of different types of DR signals; 3) Allow the DR resources to implement systems with a relatively fixed set of load control strategies that can be used without a change in different DR programs, thus reducing complexity and cost; and 4) Allow the utility/ISO to send different types of signals to different DR resources to facilitate their participation in the DR programs.



FIG. 6 is a diagram of a DR scenario in which there is a utility/ISO 11 that may utilize a demand response management system (DRMS) 52 for managing its DR programs to send DR signals 14 to one or more DR resources 12 that are participating in the DR program. DR signal 14 may be defined by utility/ISO 11 on a per program basis.


DR resource 12 may have some sort of DR interface 55 sub-system that consumes DR signals 14 from utility/ISO 11 and in turn forwards messages or commands to a variety of loads 56 within the facility. Loads 56 within the facility may have some sort of controller that can receive messages and control the load consumption. The controller may incorporate a processor and/or computer along with a memory and a user interface. DR interface 55 and loads 56 may be logical entities. DR signal 14 from utility/ISO 11 may be consumed at the load controller itself, thus signifying that the DR interface 55 functionality is embedded within the load controller. The number of loads 56 within the facility can range anywhere from one to many.


The present approach does not depend upon the exact nature of the messages that are sent from the DR interface 55 to loads 56. A point of relevancy is that DR signal 14 may be consumed in such a fashion by DR resource 12 that the information in it can be translated into the appropriate load control actions by DR resource 12. Thus, an emphasis of the present disclosure may be to support the scenario shown in FIG. 7 such that a DR signal 57 that is sent by utility/ISO 11 may have a form and content that is specified by the owner of the DR resource 12 such that it can be consumed and translated into the appropriate load control actions in the most effective fashion as determined by the DR resource 12 owners that must deploy and program the systems that are responsible for doing the load 56 control.



FIG. 8 is a diagram showing a DRMS 52 with subsystems that allow customers to specify their own DR signals 57. DRMS 52 may perform virtually all its normal operations and generate a utility defined DR signal 14 as shown by a “normal signal generator” sub-system 58. Signal 14 may be passed through a sub-system referred to as the “customer defined signal translation” sub-system 59. Within sub-system 59 may be a set of user defined rules that are specific to a DR program that will take a DR signal 19 that is specific to that program and translate it into some form of a DR signal 57 as specified by the customer.


As indicated in FIG. 8, there may be DR resource operator 61 that may provides information via, for instance, a user interface 63 and a connection 62, relative a DR signal configuration, that supports the following functions. First, there may be an ability to specify the form and possible values for a customer or user defined signal 57. A signal that is defined by the customer may be designed to make it as easy to consume by DR resource 12 and may be based upon the capabilities of the load 56 control systems within the DR resource 12 facility. These custom DR signals 57 may or may not be dependent upon specific DR programs. Second, there may be a set of DR program specific rules that translate the possible values of the utility specified DR signals 14 into the customer defined set of DR signals 57.


As way of example, one may assume that there is a facility that contains a range of loads such as HVAC, lighting, freezer units, electric vehicles, and so on, and the entire facility may be offered to the utility/ISO 11 as a single DR resource 12. In order to simplify the creation of DR load control strategies, the facility manager may create a set of five different load consumption levels for the entire facility and program the control of the individual loads as they relate to each of the five different levels. For example, perhaps at level one, half the thermostats may be set back one degree and certain lights may be turned off. DR resource operator 61 may then interface to DRMS 52 to create a customer specific DR signal that may contain five levels, one for each of the levels that have been programmed into the control system. Thus, when DR resource 12 receives a DR signal 57 with one of the levels, the proper DR control strategies are already programmed into the system and easy to perform. Operator 61 may need only to specify within DRMS 52 a set of rules. The amount of load consumption levels may be set at virtually any number.


To recap, a system, for predicting a DR load response for a resource to a DR signal, may incorporate a utility/ISO and a demand resource. The utility may send a DR signal to a demand resource. The DR signal may be conveyed at a predefined finite value. The DR resource may report back a description of a load response that is predictable according to the DR signal at the predefined finite value.


The DR resource may continuously report back to the utility/ISO as to what a load response is to be according to a DR signal having a predefined finite value. The resource continuously reporting back to the utility/ISO may provide predictability of a load response relative to a predefined finite value of the DR signal.


The system may further incorporate a user interface of the utility/ISO that provides DR signals to and receives feedback from the DR resource. A selection of a predefined finite level of DR signal may be dispatched to the DR resource. The DR resource may respond with a load response relative to the predefined finite level of the DR signal. The predefined finite level of the DR signal may incorporate two or more levels of dispatch.


The DR resource may be in constant communication with a DR management system. The DR response may continuously report what a load response in units of power will be if the DR response receives a DR signal having a predefined finite value.


A display may show an actual load response versus time for the DR resource receiving a DR signal in the past. The display may show a projection for a future.


For the future, the projection by the utility/ISO may incorporate various load responses based on feedback received from the DR resource. Additional DR resources may be aggregated for showing actual load response versus time for the DR resources in the past and with a projection of load responses for the future.


Values of the responses of the DR resources for each signal type may be added together resulting in N levels of dispatches. There may be X number of resources. Each resource may operate at N levels of dispatches resulting in a number of settings on an order of X to a power of N.


A system, for predicting load responses from resources relative to demand response signals, may incorporate a utility, and a demand response (DR) resource having a communication connection with the utility. A DR signal may be sent via the communication connection from the utility to the DR resource. A current state of loads of the DR resource may be determined by the DR signal.


Predictability of a load response of a DR resource to a DR signal may be dependent upon when the DR signal is restricted to one of a set of predefined finite values and for each of the predefined finite values sent as a DR signal, the DR resource may continuously report back what its load response will be.


A demand response and comfort system may incorporate a utility/ISO and a demand response (DR) resource. The utility/ISO may send DR signals to the DR resource having a first degree of comfort. The DR signals may cause a reduction of the first degree of comfort to a second degree of comfort, or vice versa, during a DR event initiated by the utility/ISO.


The DR resource may have a recovery rate to a former degree of comfort. The recovery rate may incorporate the first degree of comfort minus the second degree of comfort divided by an amount to time to reduce a difference of the first degree of comfort and the second degree of comfort to zero.


The first degree of comfort may be a temperature as indicated by a thermostat setting at the DR resource. The second degree of comfort may be a temperature at the DR resource.


The recovery rate of a resource may be used by the utility/ISO in shedding a certain amount of energy.


The utility may select the second degree of comfort and the amount of time to reduce the difference of the first degree of comfort and the second degree of comfort to zero after termination of the DR event.


In the present specification, some of the matter may be of a hypothetical or prophetic nature although stated in another manner or tense.


Although the present system and/or approach has been described with respect to at least one illustrative example, many variations and modifications will become apparent to those skilled in the art upon reading the specification. It is therefore the intention that the appended claims be interpreted as broadly as possible in view of the related art to include all such variations and modifications.

Claims
  • 1. A system, for predicting a demand response (DR) load response for a resource to a DR signal, comprising: a utility/independent system operator (ISO); anda DR resource; andwherein: the utility sends a DR signal to the DR resource;the DR signal has a predefined finite value of a set of predefined finite values; andthe DR resource reports back to the utility/ISO a description of a predicted load response of the DR resource to the DR signal, where the predicted load response includes a predicted load response for each of the predefined finite values;wherein a display shows an actual load response versus time for the DR resource receiving a DR signal in the past; and the display shows a projection for a future;wherein for the future, the projection by the utility/ISO comprises various load responses based on feedback received from the DR resource; andwherein additional DR resources are aggregated for showing actual load response versus time for the DR resources in the past and with a projection of load responses for the future.
  • 2. The system of claim 1, wherein: the DR resource continuously reports back to the utility/ISO as to what a load response is to be according to a DR signal having a predefined finite value; andthe DR resource continuously reporting back to the utility/ISO provides predictability of a load response relative to a predefined finite value of the DR signal.
  • 3. The system of claim 2, wherein the predefined finite level of the DR signal comprises two or more levels of dispatch.
  • 4. The system of claim 1, further comprising: a user interface of the utility/ISO that provides DR signals to and receives feedback from the DR resource; andwherein a selection of a predefined finite level of a DR signal is dispatched to the DR resource.
  • 5. The system of claim 4, wherein the DR resource responds with a load response relative to the predefined finite level of the DR signal.
  • 6. The system of claim 1, wherein: the DR resource is in constant communication with a DR management system; andthe DR resource continuously reports what a load response in units of power will be if the DR resource receives a DR signal having a predefined finite value.
  • 7. The system of claim 1, wherein: values of the responses of the DR resources for each signal type are added together resulting in N levels of dispatches.
  • 8. The system of claim 7, wherein: there are X number of resources; and each resource can operate at N levels of dispatches resulting in a number of settings on an order of X to a power of N.
  • 9. A demand response and comfort system comprising: a utility/independent system operator (ISO); anda demand response (DR) resource having a first degree of comfort; andwherein: the utility/ISO sends DR signals to the DR resource; andthe DR signals cause a reduction of the first degree of comfort to a second degree of comfort, or vice versa, during a DR event initiated by the utility/ISO;the DR resource has a recovery rate for returning to the first degree of comfort from the second degree of comfort and the DR signal is based, at least in part, on the recovery rate;wherein the recovery rate comprises the first degree of comfort minus the second degree of comfort divided by an amount to time to reduce a difference of the first degree of comfort and the second degree of comfort to zero; andwherein the utility selects the second degree of comfort and the amount of time to reduce the difference of the first degree of comfort and the second degree of comfort to zero after termination of the DR event.
  • 10. The system of claim 9, wherein: the first degree of comfort is a temperature as indicated by a thermostat setting at the DR resource; andthe second degree of comfort is a temperature at the DR resource.
  • 11. The system of claim 9, wherein the recovery rate of a resource is used by the utility/ISO in shedding a certain amount of energy.
US Referenced Citations (230)
Number Name Date Kind
4110827 Shavit Aug 1978 A
4130874 Pai Dec 1978 A
4153936 Scmitz et al. May 1979 A
4419667 Gurr et al. Dec 1983 A
4549274 Lerner Oct 1985 A
4850010 Stanbury et al. Jul 1989 A
4937760 Beitel et al. Jun 1990 A
5341142 Reis et al. Aug 1994 A
5500561 Wilhelm Mar 1996 A
5566084 Cmar Oct 1996 A
5572438 Ehlers et al. Nov 1996 A
5598349 Elliason et al. Jan 1997 A
5719854 Choudhury et al. Feb 1998 A
5822553 Gifford et al. Oct 1998 A
5892758 Argyroudis Apr 1999 A
6026375 Hall et al. Feb 2000 A
6195367 Jakobik et al. Feb 2001 B1
6209018 Ben-shachar et al. Mar 2001 B1
6252950 Duty et al. Jun 2001 B1
6259723 Miyashita Jul 2001 B1
6278717 Arsenault et al. Aug 2001 B1
6289384 Whipple et al. Sep 2001 B1
6366926 Pohlmann et al. Apr 2002 B1
6446136 Pohlmann et al. Sep 2002 B1
6519509 Nierlich et al. Feb 2003 B1
6529723 Bentley Mar 2003 B1
6535817 Krishnamurti et al. Mar 2003 B1
6566926 Patterson May 2003 B1
6574581 Bohrer et al. Jun 2003 B1
6758161 Nohynek Jul 2004 B2
6832134 Havlena Dec 2004 B2
6832249 Ciscon et al. Dec 2004 B2
6857022 Scanlan Feb 2005 B1
6865685 Hammond et al. Mar 2005 B2
6985087 Soliman Jan 2006 B2
7010700 Foss et al. Mar 2006 B1
7016784 Allen et al. Mar 2006 B2
7039532 Hunter May 2006 B2
7069309 Dodrill et al. Jun 2006 B1
7183910 Alvarez et al. Feb 2007 B2
7260616 Cook Aug 2007 B1
7333880 Brewster et al. Feb 2008 B2
7337237 Salahshoor et al. Feb 2008 B2
7346467 Bohrer et al. Mar 2008 B2
7392115 Schindler Jun 2008 B2
7401086 Chorafakis et al. Jul 2008 B2
7472301 Ginggen et al. Dec 2008 B2
7528503 Rognli et al. May 2009 B2
7565227 Richard et al. Jul 2009 B2
7590746 Slater et al. Sep 2009 B2
7650289 Cooper et al. Jan 2010 B2
7676657 Lindholm et al. Mar 2010 B2
7702424 Cannon et al. Apr 2010 B2
7715951 Forbes, Jr. et al. May 2010 B2
7742953 King et al. Jun 2010 B2
7775191 Hou Aug 2010 B2
7778738 Taft Aug 2010 B2
7797009 Kiiskila et al. Sep 2010 B2
7806845 Arm et al. Oct 2010 B2
7844481 Hilbush et al. Nov 2010 B2
7845576 Siddaramanna et al. Dec 2010 B2
7865252 Clayton Jan 2011 B2
7873441 Synesiou et al. Jan 2011 B2
7885718 Yano et al. Feb 2011 B2
7886166 Shnekendorf et al. Feb 2011 B2
7925384 Huizenga Apr 2011 B2
7941528 Hicks, III et al. May 2011 B2
7954726 Siddaramanna et al. Jun 2011 B2
7958229 Conway Jun 2011 B2
8000913 Kreiss Aug 2011 B2
8023410 O'Neill Sep 2011 B2
8073558 Koch Dec 2011 B2
8091794 Siddaramanna et al. Jan 2012 B2
8140279 Subbloie Mar 2012 B2
8140658 Gelvin et al. Mar 2012 B1
8143811 Shloush et al. Mar 2012 B2
8163276 Hedrick et al. Apr 2012 B2
8170774 Forte et al. May 2012 B2
8183995 Wang et al. May 2012 B2
8199773 Aubin et al. Jun 2012 B2
8232745 Chemel et al. Jul 2012 B2
8234017 Ahn Jul 2012 B2
8234876 Parsonnet et al. Aug 2012 B2
8260468 Ippolito et al. Sep 2012 B2
8260469 Gregory et al. Sep 2012 B2
8260650 Miller Sep 2012 B2
8280656 Kreiss Oct 2012 B2
8291243 Castelli et al. Oct 2012 B2
8295989 Rettger et al. Oct 2012 B2
8305380 Gotwalt et al. Nov 2012 B2
8312299 Tremel et al. Nov 2012 B2
8321302 Bauer et al. Nov 2012 B2
8321950 Oran Nov 2012 B2
8327024 Pattison et al. Dec 2012 B2
8330762 Grossman Dec 2012 B2
8352094 Johnson et al. Jan 2013 B2
8373547 Benya et al. Feb 2013 B2
8386086 Roux et al. Feb 2013 B2
8406937 Verfuerth et al. Mar 2013 B2
8412654 Montalvo Apr 2013 B2
8417391 Rombouts et al. Apr 2013 B1
8443355 Wiese et al. May 2013 B2
8538593 Sun Sep 2013 B2
8565903 Koch Oct 2013 B2
8572230 Koch Oct 2013 B2
8595094 Forbes, Jr. Nov 2013 B1
8606418 Myers et al. Dec 2013 B1
8621097 Venkatakrishnan et al. Dec 2013 B2
8626354 Walter et al. Jan 2014 B2
8630744 Walter et al. Jan 2014 B2
8639214 Fujisaki Jan 2014 B1
8667132 Koch Mar 2014 B2
8671167 Koch Mar 2014 B2
8671191 Koch Mar 2014 B2
8676273 Fujisaki Mar 2014 B1
8676953 Koch Mar 2014 B2
8700187 Forbes, Jr. Apr 2014 B2
8782190 Koch Jul 2014 B2
8868925 Wyatt et al. Oct 2014 B2
8879488 Pavlovski et al. Nov 2014 B2
8880226 Raman et al. Nov 2014 B2
8880235 Greene Nov 2014 B2
9088179 Shaffer et al. Jul 2015 B2
9124535 Koch Sep 2015 B2
9137050 Koch Sep 2015 B2
9153001 Walter et al. Oct 2015 B2
9183522 Koch Nov 2015 B2
9461470 Cox Oct 2016 B2
9530169 Strelec et al. Dec 2016 B2
9680308 Bruschi et al. Jun 2017 B2
9805325 Ippolito et al. Oct 2017 B2
20030016237 Hickey Jan 2003 A1
20030033230 Mccall Feb 2003 A1
20030069752 LeDain et al. Apr 2003 A1
20030233064 Arm et al. Dec 2003 A1
20030233201 Horst et al. Dec 2003 A1
20040034484 Solomita, Jr. et al. Feb 2004 A1
20040137897 Teixeira Jul 2004 A1
20040203649 Cashiola Oct 2004 A1
20050027636 Gilbert et al. Feb 2005 A1
20050152694 Chown Jul 2005 A1
20050172304 Tavares et al. Aug 2005 A1
20050194456 Tessier et al. Sep 2005 A1
20050229220 Fisher et al. Oct 2005 A1
20050262026 Watkins Nov 2005 A1
20070005195 Pasquale et al. Jan 2007 A1
20070055999 Radom et al. Mar 2007 A1
20070124109 Timko et al. May 2007 A1
20070222295 Wareham et al. Sep 2007 A1
20080011864 Tessier et al. Jan 2008 A1
20080046715 Balazs et al. Feb 2008 A1
20080114638 Colliau et al. May 2008 A1
20080167931 Gerstemeier et al. Jul 2008 A1
20080177678 Di Martini et al. Jul 2008 A1
20080195255 Lutze et al. Aug 2008 A1
20080262848 Shienbrood et al. Oct 2008 A1
20090027932 Haines et al. Jan 2009 A1
20090046625 Diener et al. Feb 2009 A1
20090092062 Koch Apr 2009 A1
20090187499 Mulder et al. Jul 2009 A1
20090198384 Ahn Aug 2009 A1
20090204977 Tavares et al. Aug 2009 A1
20090249090 Schmitz et al. Oct 2009 A1
20090271255 Utter et al. Oct 2009 A1
20090281674 Taft Nov 2009 A1
20090295594 Yoon Dec 2009 A1
20090297488 Fraser et al. Dec 2009 A1
20090313083 Dillon et al. Dec 2009 A1
20090319090 Dillon et al. Dec 2009 A1
20090319310 Little Dec 2009 A1
20100057480 Arfin et al. Mar 2010 A1
20100076615 Daniel et al. Mar 2010 A1
20100076835 Silverman Mar 2010 A1
20100106342 Ko et al. Apr 2010 A1
20100106543 Marti Apr 2010 A1
20100114340 Huizenga et al. May 2010 A1
20100138363 Batterberry et al. Jun 2010 A1
20100168924 Tessier et al. Jul 2010 A1
20100179704 Ozog Jul 2010 A1
20100241285 Johnson et al. Sep 2010 A1
20100274377 Kaufman et al. Oct 2010 A1
20100283606 Tsypin et al. Nov 2010 A1
20100324962 Nesler et al. Dec 2010 A1
20110016200 Koch Jan 2011 A1
20110040550 Graber et al. Feb 2011 A1
20110040666 Crabtree et al. Feb 2011 A1
20110046805 Bedros et al. Feb 2011 A1
20110093493 Nair et al. Apr 2011 A1
20110113068 Ouyang May 2011 A1
20110125542 Koch May 2011 A1
20110172836 Boss et al. Jul 2011 A1
20110172838 Pai et al. Jul 2011 A1
20110196539 Nair et al. Aug 2011 A1
20110196546 Muller et al. Aug 2011 A1
20110199209 Siddaramanna et al. Aug 2011 A1
20110212700 Petite Sep 2011 A1
20110231320 Irving Sep 2011 A1
20110258049 Ramer et al. Oct 2011 A1
20110270454 Kreiss Nov 2011 A1
20110301774 Koch Dec 2011 A1
20120066397 Koch et al. Mar 2012 A1
20120066686 Koch Mar 2012 A1
20120084696 Marti Apr 2012 A1
20120093141 Imes et al. Apr 2012 A1
20120101653 Tran Apr 2012 A1
20120109399 Tran May 2012 A1
20120136496 Black May 2012 A1
20120136915 Koch et al. May 2012 A1
20120173030 Taft Jul 2012 A1
20120197456 Walter et al. Aug 2012 A1
20120197457 Walter et al. Aug 2012 A1
20120197458 Walter et al. Aug 2012 A1
20120245968 Beaulieu et al. Sep 2012 A1
20120271473 Koch Oct 2012 A1
20120277920 Koch Nov 2012 A1
20130035992 Silverman Feb 2013 A1
20130047010 Massey et al. Feb 2013 A1
20130079931 Wanchoo et al. Mar 2013 A1
20130123996 Matos May 2013 A1
20130144451 Kumar et al. Jun 2013 A1
20130173243 Kayton et al. Jul 2013 A1
20130254151 Mohagheghi et al. Sep 2013 A1
20140081704 Strelec et al. Mar 2014 A1
20140149973 Walter et al. May 2014 A1
20140277769 Matsuoka et al. Sep 2014 A1
20140277795 Matsuoka et al. Sep 2014 A1
20140278687 McConky et al. Sep 2014 A1
20150134280 Narayan et al. May 2015 A1
20150170171 McCurnin et al. Jun 2015 A1
20150213564 Ishida Jul 2015 A1
Foreign Referenced Citations (15)
Number Date Country
2456227 May 2012 EP
2012118982 Jun 2012 JP
WO 2005033964 Apr 2005 WO
WO 2008027455 Mar 2008 WO
WO 2008027457 Mar 2008 WO
WO 2009006133 Jan 2009 WO
WO 2009020606 Feb 2009 WO
WO 2009023230 Feb 2009 WO
WO 2009027617 Mar 2009 WO
WO 2009085610 Jul 2009 WO
2011008775 Jan 2011 WO
WO 2011065007 Jun 2011 WO
WO 2013025565 Feb 2013 WO
WO 2013055551 Apr 2013 WO
2014036408 Mar 2014 WO
Non-Patent Literature Citations (51)
Entry
Lau et al. “Strategy and Modeling for Building DR Optimization”, 2011 IEEE, pp. 381-386.
Couper, “Optimizing Demand Response to Improve Economic Dispatch and Reliability,” downloaded from http://public.dhe.ibm.com/common/ssi/ecm/en/euw03026usen/EUW03026USEN.PDF, 5 pages, prior to Dec. 11, 2013.
U.S. Appl. No. 14/526,193, filed Oct. 28, 2014.
U.S. Appl. No. 14/224,744, filed Mar. 25, 2014.
“Executive Summary,” 1 page, prior to Sep. 2007.
Federal Energy Regulatory Commission (FERC), “Assessment of Demand Response & Advanced Metering,” 92 pages, Sep. 2007.
http://www.akuacom.com/solutions/index.html, “Akuacom—Automated Demand Response,” 2 pages, printed Feb. 3, 2012.
Autogrid, “Austin Energy and AutoGrid Systems Collaborate on Standards-Based Automated Demand Response to Usher in a New Era of Retail Choice for the Demand Response Market,” 5 pages, Feb. 26, 2013.
U.S. Appl. No. 13/939,935, filed Jul. 11, 2013.
U.S. Appl. No. 13/940,066, filed Jul. 11, 2013.
U.S. Appl. No. 13/940,090, filed Jul. 11, 2013.
U.S. Appl. No. 14/056,902, filed Oct. 17, 2013.
Santacana et al., “Getting Smart, With a Clearer Vision of Intelligent Grid, Control Emerges from Chaos,” IEEE Power and Energy Magazine, pp. 41-48, Mar./Apr. 2010.
Combined Search and Examination Report Under Sections 17 and 18(3) for Corresponding UK Patent Application Serial No. GB1504192.4 dated Sep. 8, 2015.
U.S. Appl. No. 14/931,746, filed Nov. 3, 2015.
“Smart Demand Response: A Discussion Paper,” Energy Networks Association, energyuk, 44 pages, prior to Nov. 29, 2012.
Abdullah et al., “Demand-Side Energy Management Performed Using Direct Feedback via Mobile Systems: Enables Utilities to Deploy Consumer Based Demand Response Programs,” 2010 IEEE International Energy Conference and Exhibition, pp. 172-177, 2010.
European Search Report for Related Application No. EP 12169650.4, dated Nov. 22, 2012.
International Search Report for PCT ApplicationSerial No. pct/us2012/058537, International Filing Date Oct. 3, 2012.
Coughlin et al., “Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California,” Lawrence Berkeley National Laboratory, Report No. LBNL-63728, 33 pages, Jan. 2008.
Cruz, “Tutorial on GPU Computing with an Introduction to CUDA,” 37 pages, prior to Nov. 17, 2011.
Holmberg, “Facility Interface to the Smart Grid,” National Institute of Standards and Technology, 7 pages, printed 2012.
Honeywell, “Automated Demand Response—Southern California Program,” 2 pages, printed Aug. 1, 2011.
Honeywell, “The Perfect Response to Peak Events,” 4 pages, Nov. 2010.
http://en.wikipedia.org/wiki/Demand response, “Demand Response,” 10 pages, printed Feb. 3, 2012.
http://www.naesb.org/pdf3/dsmee012308213.doc, “Demand Response Measurement and Verification Literature Review,” 29 pages, created Jan. 14, 2008, modified Dec. 18, 2012.
https://buildingsolutions.honeywell.com/Cultures/en-US/Markets/Utilities/DemandResponse/, 1page, printed Feb. 3, 2012.
Hunt, “Automated Demand Response System and Advanced End-Use Services Platform,” Optimal Technologies, 31, pages, Sep. 24, 2004.
Kiliccote et al., “Findings from Seven Years of Field Performance Data for Automated Demand Response in Commercial Buildings,” Lawrence Berkeley National Laboratory, Report No. LBNL-3643E, May 2010.
Kiliccote et al., “Open Automated Demand Response Communications in Demand Response for Wholesale Ancillary Services,” Lawrence Berkeley National Laboratory, Report No. LBNL-2945E, 13 pages, Nov. 2009.
Kiliccote et al., “Open Automated Demand Response for Small Commercial Buildings,” Lawrence Berkeley National Laboratory, Report No. LBNL-2195E, 104 pages, Jul. 2009.
Koch et al., “Architecture Concepts and Technical Issues for an Open, Interoperable Automated Demand Response Infrastructure,” Berkeley National Laboratory, Report No. LBNL-63664, 7 pages, Oct. 2007.
Koch et al., “Direct Versus Facility Centric Load Control for Automated Demand Response,” Lawrence Berkeley National Laboratory, Report No. LBNL-2905E, 11 pages, Nov. 2009.
Koch et al., “Scenarios for Consuming Standardized Automated Demand Response Signals,” Lawrence Berkeley National Laboratory, Report No. LBNL-1362E, 10 pages, Nov. 2008.
Koch, “The Demand Response Automation Server (DRAS),” Building Performance, http://www.akuacom.com/assets/pdf/ASHRAE_2008_Ed_Koch.pdf, 18 pages, prior to Nov. 17, 2011.
Olson, “New Approaches in Automating and Optimizing Demand Response to Solve Peak Load Management Problems,” Building IQ brochure, 8 pages, 2011.
Piette et al., “Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results,” Berkeley National Laboratory, Report No. LBNL-62218, 67 pages, Aug. 2007.
Piette et al., “Automated Critical Peak Pricing Field Tests: Program Description and Results,” Lawrence Berkeley National Laboratory, Report No. LBNL-59351, Apr. 2006.
Piette et al., “Design and Implementation of an Open, Interoperable Automated Demand Response Infrastructure,” Berkeley National Laboratory, Report No. LBNL-63665, 6 pages, Oct. 2007.
Piette et al., “Findings From the 2004 Fully Automated Demand Response Tests in Large Facilities,” Lawrence Berkeley National Laboratory, Report No. LBNL-58178, 197 pages, Sep. 2005.
Piette et al., “Linking Continuous Energy Management and Open Automated Demand Response,” Lawrence Berkeley National Laboratory, Report No. LBNL-1361E, 9 pages, Nov. 2008.
Piette et al., “Open Automated Demand Response Communications Specification,” Version 1.0, CEC-500-2009-063, 214 pages, Apr. 2009.
Piette et al., “Participation through Automation: Fully Automated Critical Peak Pricing in Commercial Buildings,” Berkeley National Laboratory, Report No. LBNL-60614, 14 pages, Aug. 13-18, 2006.
Schisler et al., “The Role of Demand Response in Ancillary Services Markets,” IEEE, 3 pages, 2008.
Violette et al., “DRR Valuation and Market Analysis vol. II: Assessing the DRR Benefits and Costs,” Summit Blue Consulting, 112 pages, Jan. 6, 2006.
Watson et al., “Machine to Machine (M2M) Technology in Demand Responsive Commercial Buildings,” Berkeley National Laboratory, Report No. LBNL-55087, 18 pages, Aug. 2004.
Yin et al., “Auto-DR and Pre-Cooling of Buildings at Tri-City Corporate Center,” Lawrence Berkeley National Laboratory, Report No. LBNL-3348, 140 pages, Nov. 2008.
Zaidi et al., “Load Recognition for Automated Demand Response in Microgrids,” IEEE, pp. 2436-2439, 2010.
Akuacom by Honeywell, “Automated Demand Response,” 2 pages, Sep. 2012.
https://drrc.lbl.gov/openadr, “OpenADR,” Berkeley Labs Demand Response Research Center, 2 pages, printed Apr. 6, 2017.
Siemens, “Demand Response Management System (DRMS), Version 2.5,” 3 pages, Oct. 2014.
Related Publications (1)
Number Date Country
20150018985 A1 Jan 2015 US