Technical Field
The present disclosure is related to systems for recovering mature fine tailings (MFT) from oil sands tailings ponds, as well as methods of designing, making, and using such systems.
Description of the Related Art
Oil sands tailings ponds are containments used to store wastes and byproducts of bitumen extraction from oil sands. They can be used to store residual bitumen, fine silts, sand, suspended solids, etc., often suspended in water in the tailings ponds. Managing such tailings ponds and the materials stored therein is a complex and important environmental challenge.
Some systems have been developed to transfer tailings from tailings ponds, such as for further processing, but these prior systems suffer from various drawbacks. There is room for improvement in the management of oil sands tailings ponds and the processing of tailings stored therein.
In some embodiments, a method comprises selecting a desired density of mature fine tailings to be removed from an oil sands tailings pond, positioning a hollow conduit within the oil sands tailings pond such that a bottom end of the hollow conduit is open to the mature fine tailings of the desired density and such that a top end of the hollow conduit is open above a free water surface of the pond, and removing the mature fine tailings of the desired density from within the hollow conduit.
In some cases, the method can include adjusting a length of the hollow conduit. In some cases, the method can include coupling deflector plates to an outer surface of the hollow conduit. In some cases, the method can include coupling a buoyancy element to the hollow conduit. In some cases, selecting a desired density comprises selecting a desired density greater than 1.35 t/m3. In some cases, the hollow conduit is a hollow cylindrical conduit. In some cases, removing the mature fine tailings of the desired density from within the hollow conduit comprises pumping the mature fine tailings of the desired density from within the hollow conduit. In some cases, removing the mature fine tailings of the desired density from within the hollow conduit comprises siphoning the mature fine tailings of the desired density from within the hollow conduit.
In some embodiments, a method includes selecting a desired density of mature fine tailings to be removed from an oil sands tailings pond, selecting a desired recovery rate of the mature fine tailings of the desired density, selecting a fill level height of the mature fine tailings of the desired density to be maintained within a hollow conduit, determining a plastic viscosity of the mature fine tailings of the desired density, determining a shear strength at rest of the mature fine tailings of the desired density, determining a diameter of the hollow conduit so as to satisfy the condition that when the hollow conduit is positioned within the oil sands tailings pond such that a bottom end of the hollow conduit is open to the mature fine tailings of the desired density and such that a top end of the hollow conduit is open above a free water surface of the pond, and when the mature fine tailings of the desired density are being removed from within the hollow conduit: a net hydraulic head pressure acting upon the mature fine tailings of the desired density at an outer side of the bottom end of the hollow conduit balances a sum of a net hydraulic head pressure acting over the selected fill level height upon the mature fine tailings of the desired density at an inner side of the bottom end of the hollow conduit, a dynamic pressure of the mature fine tailings of the desired density, and an operating shear resistance of the mature fine tailings of the desired density, and fabricating the hollow conduit having the determined diameter.
In some cases, the method can include positioning the hollow conduit within the oil sands tailings pond such that the bottom end of the hollow conduit is open to the mature fine tailings of the desired density and such that the top end of the hollow conduit is open above a free water surface of the pond. In some cases, the method can include removing the mature fine tailings of the desired density from within the hollow conduit. In some cases, the method can include adjusting a length of the hollow conduit. In some cases, the method can include coupling deflector plates to an outer surface of the hollow conduit. In some cases, the method can include coupling a buoyancy element to the hollow conduit.
In some cases, selecting a desired density comprises selecting a desired density greater than 1.35 t/m3. In some cases, the hollow conduit is a hollow cylindrical conduit. In some cases, removing the mature fine tailings of the desired density from within the hollow conduit comprises pumping the mature fine tailings of the desired density from within the hollow conduit. In some cases, removing the mature fine tailings of the desired density from within the hollow conduit comprises siphoning the mature fine tailings of the desired density from within the hollow conduit.
In some embodiments, a system includes an oil sands tailings pond including mature fine tailings, and a hollow conduit positioned within the pond such that a bottom end of the hollow conduit is open to the mature fine tailings, such that a top end of the hollow conduit is open above a free water surface of the pond, and such that the mature fine tailings fill the hollow conduit to a predetermined fill level height, the hollow conduit having a diameter such that when the mature fine tailings are being removed from within the hollow conduit, a net hydraulic head pressure acting upon the mature fine tailings at an outer side of the bottom end of the hollow conduit balances a sum of a net hydraulic head pressure acting over the predetermined fill level height upon the mature fine tailings at an inner side of the bottom end of the hollow conduit, a dynamic pressure of the mature fine tailings, and an operating shear resistance of the mature fine tailings.
Mature fine tailings (MFT) are a byproduct of the bitumen extraction process of oil sands mining operations. The main components of MFT are water and oil sands fines, although numerous other ingredients are also found in MFT in smaller quantities. These other ingredients can either be originally found in the oil sands deposits, or can be introduced into MFT through the bitumen extraction process. The fines referred to herein can be solid particles smaller than nominally 44 microns, which do not settle to the bottom of the tailings ponds but stay in suspension for prolonged periods of time, thus creating MFT. Oil sands tailings, which are produced through the oil sands bitumen extraction process, are delivered to the tailings ponds via hydro transport installations.
A typical configuration of an oil sands tailings pond is shown in
MET can be a non-Newtonian, Bingham fluid. Its main rheological properties can be characterized by its density, its shear strength and its plastic viscosity. The least dense MFT can be found closer to the water cap, and the MFT's density, shear strength, and plastic viscosity can increase with depth. The MFT shear strength and plastic viscosity can each be a function of a percentage of fines in the MFT.
MFT present a complex and important environmental challenge, and often it is desirable to remove MET from the oil sands tailings ponds in which they are stored. For example, MFT may be removed from a tailings pond to meet environmental regulations aimed at reducing the volume of MFT accumulated through the bitumen extraction process, to reclaim the tailings ponds, to manage storage of tailings within the facilities, and/or to process the MFT to recover valuable materials therefrom.
Some systems have been developed to transfer MFT out of tailings ponds, such as stationary submersible pumping systems and dredging systems. Both of these types of systems utilize pumping device(s) placed at predetermined depths inside an MFT deposit. The MFT can then be recovered by pumping, and can be transported by hydro-transport installations to shore-based facilities for further processing.
Stationary submersible pumping systems can have various drawbacks. For example, MFT of density higher than 1.35 t/m3 is not practically pumpable utilizing unaided stationary submersible pumping systems because the flow properties of MFT at the pumping depth prevent MFT from entering the pump at a sufficient rate to avoid pump overheating and cavitation. Further, the performance of submersible pumps can be greatly compromised by pump suction plugging due to accumulation of various debris around the pump suction. This debris is commonly found in MFT deposits. Pump plugging is a primary concern with utilizing this technology, regardless of the MFT density.
Further still, as shown in
Likewise, dredging systems can have various drawbacks. For example, they can also suffer from the effects of debris plugging and coning described above. In addition, dredging systems are often not practical for use in year-round operations, as the dredging systems are typically frequently relocated throughout the tailings pond, so that MFT is gathered from a large area of the oil sands tailings pond. This dredge system relocation makes it impractical to maintain MFT recovery operations year-round because the majority of many pond surfaces are covered with ice during winter months.
The MFT transfer system 5 can also include a buoyancy device 6 coupled to a top end of the hollow conduit 11 such that the MFT transfer system 5 can be placed and float at the surface of an oil sands tailings pond. The buoyancy device 6 can be made of steel, aluminum, or other materials suitable for cold weather applications. When the MFT transfer system 5 is so placed in a tailings pond, a portion of the system 5 can be buoyed above the free water surface, and a portion of the system 5 can remain below the free water surface. An immersion height h of the system 5 can be defined as the distance from the free water surface to a bottom of the hollow conduit 11 when it is positioned in the tailings pond as shown in
As noted above, the MFT density can increase with depth in the tailings pond. Thus, the height h can be selected so that the conduit 11 penetrates the MFT deposits to or below a depth at which MFT having a desired or required density is located. The dimensions D and h of the system 5 can be selected, based on rheological properties of the MFT, such that the system 5 can transfer MFT of desired density out of the tailings pond at a desired rate. For example, the selection of the dimension D can be based on the operating shear strength (T1) and the dynamic pressure (q) of the MFT being removed from the pond.
Being a non-Newtonian fluid, MFT has shear strength at rest (T0) which depends on the MFT density, maturity of MFT deposits, properties of oil sands ore and on the bitumen extraction process. In MFT recovery operations its reference expected value is nominally 50 Pa for density of 1.35 t/m3. Operating shear strength (T1) is the shear strength of MFT during the MFT recovery operations. MFT corresponds to the non-Newtonian, Bingham Plastic Model, except in the area of low shear rates as noted below and in
Plastic viscosity (μ) determines the gradient at which shear strength of MFT increases with the increase in shear rate. Its value also depends on MFT density, maturity of MFT deposits, properties of oil sands ore and the bitumen extraction process. In MFT recovery operations its reference expected value is nominally 40 mPa·s for density of 1.35 t/m3.
Shear rate (s) is the characteristic of the MFT recovery system, and depends on the required recovery rate (Q) and the geometry of the MFT recovery system. The shear rate is a function of the velocity at which MFT enters the MFT recovery system.
Another important parameter in MFT recovery systems is its upper yield strength (Tu). It characterizes a sudden increase in the MFT shear strength at shear rates close to zero, and only in this area deviates from the Bingham Plastic Model. For a typical MFT recovery operation a reference value of the upper shear strength is 80 Pa for density of 1.35 t/m3.
During MFT recovery operations, MFT has dynamic pressure (q) which is a function of the MFT density (ρ) and its velocity (v). It can be determined as q=½*ρ*v2. The velocity (v) is, in turn, a function of the MFT required recovery rate (Q) and the geometry of the MFT recovery system. Dynamic pressure can be considered a flow-resisting force.
Thus, with this background in mind, suitable dimensions D and h can be determined. For example, a desired or required density (ρ) of MFT to be recovered can be selected. Based on the required density of MFT, a dimension h can be determined such that the bottom of the hollow conduit 11 is located at the same elevation as MFT of the required density. Further, a desired or required MFT recovery rate Q can be selected. MFT rheological properties, such as plastic viscosity (μ) and shear strength at rest (T0) can be determined, such as by sampling and testing the MFT, or by assuming they are equal to reference values such as the reference values provided above or other reference values for MFT of the required density, or by applying formulas that have been developed for the purpose of estimating MFT rheological properties. A required fill level h1 of MFT to be maintained inside the hollow conduit 11 during the MFT recovery operations can be determined. For example, the dimension h1 can be determined based on a minimum required submergence of an MFT collection device (e.g., a pump) to be placed inside the hollow conduit 11 and other requirements such as structural engineering requirements of the system 5.
With this information known, then, a minimum required value for the dimension D (e.g., Dmin) can be determined. For example, Dmin can be determined based on the principle of conservation of energy. As one specific example, Dmin can be defined as the dimension for which the net hydraulic head pressure acting upon the MFT at the outer side of the bottom rim of the hollow conduit 11 equals or balances the sum of the net hydraulic head pressure acting upon the MFT at the inner side of the bottom rim of the hollow conduit 11 over the required fill level height h1, and the flow-resisting forces of the dynamic pressure q of the MFT and the operating shear resistance of the MFT.
The above condition allows that for any given set of MFT recovery parameters (e.g., required density ρ and required recovery rate Q), a required dimension Dmin be determined such that continuous recovery of MFT is enabled while maintaining the required MFT fill level h1. The dimension Dmin is important because it directly influences the MFT inflow velocity (v) and the corresponding shear rate (s), and thus the operating shear resistance and the dynamic pressure (q). Dmin can be determined analytically and/or by utilizing known computational fluid dynamics (CFD) procedures. In practice, the dimension D can be selected to be equal to or greater than a corresponding determined Dmin. For example, D can be greater than Dmin to facilitate operations and maintenance aspects of the system 5.
If the dimension D is smaller than Dmin, the MFT fill level within the hollow conduit 11 can be reduced and the required fill level h1 may not be achieved. In theory, in some cases, e.g., for a certain critical value of the dimension D, the MFT fill level inside the hollow conduit 11 during recovery operations can decrease to zero, essentially leaving the hollow conduit 11 empty. On the other hand, if the dimension D is larger than Dmin, the MFT fill level inside the hollow conduit 11 can be increased to a value higher than h1. In theory, for a sufficiently large structure opening width or diameter D, the MFT dynamic pressure and operating shear resistance become negligible in value compared to the hydraulic head pressure, and the MFT fill level inside the hollow conduit 11 during the MFT recovery operations can approximate or be equal to a fill level inside the hollow conduit 11 corresponding to a hydrostatic balance of the fluids inside and outside of the hollow conduit 11. In general, however, the MFT fill level will always be lower than the free water surface, because the fluid inside the hollow conduit 11 has a higher density than the fluid outside the hollow conduit 11.
To use the system 5, the system 5 can be designed, built, and installed within an oil sands tailings pond. Water and low-density MFT can be removed from within the confines of the hollow conduit 11, while MFT of the required density enters the hollow conduit 11 under the action of hydraulic head pressure, as shown by arrows A in
MFT can be transferred out of the pond through the hollow conduit 11 of the system 5, such as by a mechanical device such as a pump or a siphon. As MFT of the required density is transferred out of the hollow conduit 11 in this manner at the required rate, additional MFT of the required density can re-enter the hollow conduit 11 at the bottom end of the hollow conduit 11, also at the required rate. In this way, the system 5 can be used to allow a continuous recovery operation in which MFT of the required density can be brought to the surface level inside the hollow conduit 11 solely by the action of the hydraulic head pressure of the fluid(s) surrounding the system 5.
Thus, the problems associated with MFT coning are reduced or eliminated due to the fact that water and lower density MFT is not present within the confines of the structure. Coning around the hollow conduit 11 exists in theory but is small or negligible because the velocity of the MET as it enters the hollow conduit 11 is relatively small. In some cases, a magnitude of this small or negligible coning effect can be calculated and/or mitigated, e.g., by increasing the immersion height h of the hollow conduit 11, such as by between about 0.1 and 0.3 meters. Further, the problems associated with debris found in MFT deposits are also reduced or eliminated because the debris is prevented from entering the hollow conduit 11 by its continuous all-round surrounding wall(s). Thus, the risk of plugging the MFT transfer device (e.g., pump or siphon) located inside the hollow conduit 11 is mitigated. Further still, an MET transfer system 5 can allow continuous, year-round recovery of MFT from oil sands tailings ponds. An MFT transfer system 5 can allow continuous recovery of MFT having a density greater than 1.35 t/m3.
The various embodiments described above can be combined to provide further embodiments. These and other changes can be made to the embodiments in light of the above-detailed description. In general, in the following claims, the terms used should not be construed to limit the claims to the specific embodiments disclosed in the specification and the claims, but should be construed to include all possible embodiments along with the full scope of equivalents to which such claims are entitled. Accordingly, the claims are not limited by the disclosure.
Number | Name | Date | Kind |
---|---|---|---|
4073080 | Willums et al. | Feb 1978 | A |
4399039 | Yong | Aug 1983 | A |
4437998 | Yong | Mar 1984 | A |
4449850 | Cessou et al. | May 1984 | A |
8137566 | Bozak et al. | Mar 2012 | B2 |
8597515 | Musale et al. | Dec 2013 | B2 |
9127427 | Svorcan | Sep 2015 | B1 |
20020133983 | Chesner et al. | Sep 2002 | A1 |
20120160781 | D'Hollander | Jun 2012 | A1 |
20120248042 | Baldrey et al. | Oct 2012 | A1 |
20130081298 | Bugg et al. | Apr 2013 | A1 |
20130175223 | Rennard et al. | Jul 2013 | A1 |
Number | Date | Country |
---|---|---|
2 581 607 | Sep 2008 | CA |
2 812 202 | Feb 2014 | CA |
Number | Date | Country | |
---|---|---|---|
20160228796 A1 | Aug 2016 | US |
Number | Date | Country | |
---|---|---|---|
62113906 | Feb 2015 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 14727689 | Jun 2015 | US |
Child | 14832632 | US |