Information
-
Patent Grant
-
4698772
-
Patent Number
4,698,772
-
Date Filed
Tuesday, September 21, 198242 years ago
-
Date Issued
Tuesday, October 6, 198737 years ago
-
Inventors
-
Original Assignees
-
Examiners
Agents
-
CPC
-
US Classifications
Field of Search
US
- 364 200 MS FILE
- 364 900 MS FILE
- 355 14 R
-
International Classifications
-
Abstract
The present invention is a chain of interchangeable control boards controlling the operation of a sequence of sorters. A first control board responds to a sort command. If a first sorter under the control of the first control board is unable to complete the sort operation, a second control board receives a related command. If the second sorter under control of the second control board is unable to complete the sort operation, a third control board receives another related command. Finally, one of the sorters in the chain completes the sort operation and a notification of the completion is carried back up the chain of control boards.
Description
BACKGROUND OF THE INVENTION
The invention relates to a multiprocessor control, and in particular, to the control of similar hardware devices using common software and interchangeable control boards.
For further information relating to this application, reference is made to the following companion U.S. patent applications filed concurrently herewith to the common assignee U.S. Ser. No. 420,965, Remote Process Crash Recovery; U.S. Ser. No. 420,988, Process Scheduler in an Electronic Control; U.S. Ser. No. 420,991, Distributed Processing Environment Fault Isolation; U.S. Ser. No. 420,993 (now U.S. Pat. 4,475,156) Virtual Machine Control; U.S. Ser. No. 420,994, Task Control Manager; U.S. Ser. No. 420,995 (now U.S. Pat. No. 4,521,847), Control System Job Recovery After a Malfunction; U.S. Ser. No. 420,999, Separate Resetting of Processors in a Multiprocessor Control; U.S. Ser. No. 421,006 (now U.S. Pat. No. 4,550,382), Filtered Inputs; U.S. Ser. No. 421,007, Multiprocessor Control Synchronization and Instruction Downloading; U.S. Ser. No. 421,008, Multiprocessor Memory Map; U.S. Ser. No. 421,009, Changing Portions of Control in a ROM Based System; U.S. Ser. No. 421,010 (now U.S. Pat. No. 4,543,584), Race Control Suspension; U.S. Ser. No. 421,011 (now U.S. Pat. No. 4,514,846), Control Fault Detection for Machine Recovery and Diagnostics Prior to Malfunction; U.S. Ser. No. 421,016, Single Point Microprocessor Reset; and U.S. Ser. No. 421,615, Control Crash Diagnostics.
Often times in controlling machines, it is necessary to control similar or identical devices such as identical sorters in a sorter system. Generally, in the prior art, it is necessary to use separate and distinct control boards for each of the devices. Depending upon the number of devices such as sorters used, it is necessary to interact the control of each of the discrete sorters with the overall machine control. It is also necessary to maintain and supply separate control boards for each of the discrete sorters.
It would be desirable, therefore, to provide an interchangeable control board that can be used with any of a plurality of discrete devices and that is easily accommodated with the overall machine control when any number of mechanical elements such as sorters are included in the system.
SUMMARY OF THE INVENTION
It is, therefore, an object of the present invention to provide a new and improved control in a multiprocessor system. It is a further object of the present invention to provide an interchangeable control board for use in a control system with any number of a similar hardware devices.
Briefly, the present invention is a chain of interchangeable control boards controlling the operation of a sequence of sorters. A first control board responds to a sort command. If a first sorter under the control of the first control board is unable to complete the sort operation, it completes a first portion of the sort operation, and conveys control to a second control board. The second control board receives a related command to complete the remaining sort operation. If the second sorter under control of the second control board is unable to complete the sort operation, it completes a second portion of the sort operation and conveys control to. A third control board receives. The third control board receives another related command. Finally, one of the sorters in the chain completes the sort operation and a notification of the completion is carried back up the chain of control boards.
BRIEF DESCRIPTION OF THE INVENTION
For a better understanding of the present invention reference may be had to the accompanying drawings wherein the same reference numerals have been applied to like parts and wherein:
FIG. 1 is an elevational view of a reproduction machine typical of the type of machine or process that can be controlled in accordance with the present invention;
FIG. 2 is a block diagram of a first level of control architecture for controlling the machine of FIG. 1;
FIG. 3 illustrates a second level of control architecture, in particular a virtual machine in accordance with the present invention, for controlling the machine of FIG. 1;
FIG. 4 is an illustration of the relationship of the first level and second level of controls of the controls shown in FIG. 1;
FIGS. 5a and 5b illustrate a RAM map in accordance with the present invention;
FIG. 6 illustrates one aspect of the operation of the Task Manager according to the present invention;
FIG. 7 illustrates one aspect of the Scheduler Manager control in accordance with the present invention, and
FIG. 8 illustrates the sorter control in accordance with another feature of the present invention.
DESCRIPTION OF THE PREFERRED EMBODIMENT
With reference to FIG. 1, there is shown an electrophotographic printing or reproduction machine employing a belt 10 having a photoconductive surface. Belt 10 moves in the direction of arrow 12 to advance successive portions of the photoconductive surface through various processing stations, starting with a charging station including a corona generating device 14. The corona generating device charges the photoconductive surface to a relatively high substantially uniform potential.
The charged portion of the photoconductive surface is then advanced through an imaging station. At the imaging station, a document handling unit 15 positions an original document 16 facedown over exposure system 17. The exposure system 17 includes lamp 20 illuminating the document 16 positioned on transparent platen 18. The light rays reflected from document 16 are transmitted through lens 22. Lens 22 focuses the light image of original document 16 onto the charged portion of the photoconductive surface of belt 10 to selectively dissipate the charge. This records an electrostatic latent image on the photoconductive surface corresponding to the informational areas contained within the original document.
Platen 18 is mounted movably and arranged to move in the direction of arrows 24 to adjust the magnification of the original document being reproduced. Lens 22 moves in synchronism therewith so as to focus the light image of original document 16 onto the charged portion of the photoconductive surface of belt 10.
Document handling unit 15 sequentially feeds documents from a holding tray, in seriatim, to platen 18. The document handling unit recirculates documents back to the stack supported on the tray. Thereafter, belt 10 advances the electrostatic latent image recorded on the photoconductive surface to a development station.
At the development station a pair of magnetic brush developer rollers 26 and 28 advance a developer material into contact with the electrostatic latent image. The latent image attracts toner particles from the carrier granules of the developer material to form a toner powder image on the photoconductive surface of belt 10.
After the electrostatic latent image recorded on the photoconductive surface of belt 10 is developed, belt 10 advances the toner powder image to the transfer station. At the transfer station a copy sheet is moved into contact with the toner powder image. The transfer station includes a corona generating device 30 which sprays ions onto the backside of the copy sheet. This attracts the toner powder image from the photoconductive surface of belt 10 to the sheet.
The copy sheets are fed from a selected one of trays 34 or 36 to the transfer station. After transfer, conveyor 32 advances the sheet to a fusing station. The fusing station includes a fuser assembly for permanently affixing the transferred powder image to the copy sheet. Preferably, fuser assembly 40 includes a heated fuser roller 42 and backup roller 44 with the sheet passing between fuser roller 42 and backup roller 44 with the powder image contacting fuser roller 42.
After fusing, conveyor 46 transports the sheets to gate 48 which functions as an inverter selector. Depending upon the position of gate 48, the copy sheets will either be deflected into a sheet inverter 50 or bypass sheet inverter 50 and be fed directly onto a second gate 52. Decision gate 52 deflects the sheet directly into an output tray 54 or deflects the sheet into a transport path which carries them on without inversion to a third gate 56. Gate 56 either passes the sheets directly on without inversion into the output path of the copier, or deflects the sheets into a duplex inverter roll transport 58. Inverting transport 58 inverts and stacks the sheets to be duplexed in a duplex tray 60. Duplex tray 60 provides intermediate or buffer storage for those sheets which have been printed on one side for printing on the opposite side.
In order to complete duplex copying, the previously simplexed sheets in tray 60 are fed seriatim by bottom feeder 62 back to the transfer station for transfer of the toner powder image to the opposed side of the sheet. Conveyors 64 and 66 advance the sheet along a path which produces a sheet inversion. The duplex sheets are then fed through the same path as the previously simplexed sheets to be stacked in tray 54 for subsequent removal by the printing machine operator.
Invariably after the copy sheet is separated from the photoconductive surface of belt 10, some residual particles remain adhering to belt 10. These residual particles are removed from the photoconductive surface thereof at a cleaning station. The cleaning station includes a rotatably mounted brush 68 in contact with the photoconductive surface of belt 10.
A controller 38 and control panel 86 are also illustrated in FIG. 1. The controller 38, as represented by dotted lines, is electrically connected to various components of the printing machine.
With reference to FIG. 2, there is shown a first level of control architecture of controller 38 illustrated in FIG. 1. In accordance with the present invention, in particular, there is shown a Central Processing Master (CPM) control board 70 for communicating information to and from all the other control boards, in particular the Paper Handling Remote (PHR) control board 72 controlling the operation of the paper handling subsystems such as paper feed, registration and output transports.
Other control boards are the Xerographic Remote (XER) control board 74 for monitoring and controlling xerographic subsystems, in particular the analog signals; the Marking and Imaging Remote (MIR) control board 76 for controlling the operation of the optics and other xerographic subsystems, in particular the digital signals. A Display Control Remote (DCR) control board 78 is also connected to the CPM control board 70 providing operation and diagnostic information on both an alphanumeric and liquid crystal display. Interconnecting the control boards is a shared communication line 80, preferably a shielded coaxial cable or twisted pair similar to that used in a Xerox Ethernet.RTM. Communication System. For a more detailed explanation of an Ethernet.RTM. Communication System, reference is made to pending applications D/78108, U.S. Ser. No. 205,809; D/78108Q2, U.S. Ser. No. 205,822 and D/78108Q3, U.S. Ser. No. 205,821, all filed Nov. 10, 1980 and incorporated herein by reference.
With reference to FIG. 2, there is shown a sorter 1 control board 240 connected to CPM board 70 via the shared line 80. Also interconnected to sorter 1 as illustrated as being connected in a serial chain are sorter 2 control board 242; sorter 3 control board 244 and sorter 4 control board 246.
Other control boards can be interconnected to the shared communication line 80 as required. For example, a not shown Recircularting Document Handling Remote (RDHR) control board 82 can be provided to control the operation of a recirculating document handler. There can also be provided a not shown Semi-Automatic Document Handler Remote (SADHR) control board to control the operation of a semi-automatic document handler, one or more not shown Sorter Output Remote (SOR) control boards to control the operation of one or more sorters, and a not shown finisher output remote (FOR) control board to control the operation of a stacker and stitcher.
Each of the controller boards preferably includes an Intel 8085 microprocessor with suitable RAM and ROM memories. Also interconnected to the CPM control board is a Master Memory Board (MMB) 84 with suitable ROMs to control normal machine operation and a control panel board 86 for entering job selections and diagnostic programs. Also contained in the CPM board 70 is suitable nonvolatile memory. All of the control boards other than the CPM control board are generally referred to as remote control boards.
In a preferred embodiment, the control panel board 86 is directly connected to the CPM control board 70 over a 70 line wire and the memory board 84 is connected to the CPM control board 70 over a 36 line wire. Preferably, the Master Memory Board 84 contains 56K byte memory and the CPM control board 70 includes 2K ROM, 6K RAM, and a 512 byte nonvolatile memory. The PHR control board 72 includes 1K RAM and 4K ROM and handles 29 inputs and 28 outputs. The XER control board 74 handles up to 24 analog inputs and provides 12 analog output signals and 8 digital output signals and includes 4K ROM and 1K RAM. The MIR board 76 handles 13 inputs and 17 outputs and has 4K ROM and 1K RAM.
As illustrated, the PHR, XER and MIR boards receive various switch and sensor information from the printing machine and provide various drive and activation signals, such as to clutches and lamps in the operation of the printing machine. It should be understood that the control of various types of machines and processes are contemplated within the scope of this invention.
In accordance with the present invention, with reference to FIG. 3, there is shown a second level of control architecture, an Operating System (O.S.). The Operating System is shown by the dotted line blocks indicated by the numerals 96a, 96b and 96c. The Operating System is shown in communication with the macros and assembly language instructions of a pair of microprocessors 98a and 98b. The Operating System could communicate with any number of microprocessors, for example, the microprocessors of each of the control boards 70, 72, 74, 76 and 78 shown in FIG. 2. The Operating System overlays the control architecture of FIG. 2 and, in general, acts as a manager of the various resources such as the CPM and remote board microprocessors and the ROM and RAM memories of each of the control boards. In accordance with the present invention, the Operating System converts the raw microprocessor hardware into a virtual machine in controlling the printing machine shown in FIG. 1. By virtual machine is meant that portion of the control illustrated by numerals 96a, 96b and 96c that surrounds the system hardware. In effect, the Operating System presents a control more powerful then the underlying hardware itself.
With reference to FIG. 3, the Operating System is presented with a plurality of Directives 98. These directives call upon one or more decoders or Instruction Modules 100. In turn, the Instruction Modules 100 invoke one or more Primitives. In particular, the Primitives are a Scheduler Manager 102, a Task Manager 104, a Data Base Manager 106, a Timer Manager 108 and a Communication Manager 110. In turn, the Primitives communicate with the various microprocessors 98a, 98b through the macros 114, the assembly language 116 and the microcode 118 of the microprocessors 98a, 98b. The invoking of Instruction Modules and Primitives is illustrated in FIG. 3 by the solid lines connecting the Directives (98), Instruction Modules (100) and Primitives (102, 104, 106, 108, 110). It should be noted that each of the microprocessors 98a and 98b is suitably connected to suitable RAM and ROM memories as well as with other microprocessors.
Directives corresponding to macros in a physical machine (microprocessor) architecture are the top level of the operating control. The Directives shield the Operating System structure from changes in the compiler, allow for changes in the Operating System internal structure and abstract out from the compiler unnecessary Operating System details. Instruction Modules and Primitives make up the Operating System. Instruction Modules are the middle level and correspond to assembly language instructions in a physical machine. They are the smallest executable, nonpreemptive unit in the virtual machine. Preemption is similar to a physical machine interrupt capability except that a physical machine allows basically two concurrent processes or tasks (foreground or background) whereas the virtual machine allows an almost unlimited number of tasks executing in one or more physical processors.
The Primitives are the lowest level in the Operating System. They correspond to the microcode of a microprocessor. It is the function of the Primitives to implement the basic building blocks of the Operating System on a microprocessor and absorb any changes to the microprocessor. In general, Directives call upon one or more Instruction Modules which in turn invoke one or more of the Primitives to execute a task or process.
Preferably, the Instruction Modules 100 and the Primitives 102, 104, 106, 108 and 110 comprise software in silicon. However, it should be understood that it is within the scope of the present invention to implement the Instruction Modules and Primitives in hardware. They are building blocks in an overall control system. In particular, the instruction Modules and Primitives generally provide a set of real time, multitasking functions that can be used generically across different implementations of the microprocessors. In a machine or process control, the Instruction Modules and Primitives are extensions of the instruction set of the microprocessor. The microprocessor with its original set of Instruction Modules acts as a kernal, and the software and silicon or siliconware acts as a shell.
The machine control can be viewed as a nesting or overlay of successively higher levels of control as shown in FIG. 4. At the lowest level, is the microprocessor or controller responding to the microcode, assembly language and macros. Overlying this physical machine is the virtual machine comprising the Primitives and Instruction Modules responding to Directives. In effect, the Primitives break down the high level Directives and Instruction modules into a level for the microprocessor to perform.
An Instruction Module 100 in the operating system is known as a slice and one Instruction Module is given 500 microseconds to execute. The Instruction Modules are the smallest executable nonpreemptive unit in the virtual machine. A listing and explanation of some of the more commonly used Instruction Modules 100 are given in Appendix A.
Preemption is similar to the microprocessor interrupt capability except that a microprocessor allows basically two concurrent processes (foreground and background). On the other hand, the virtual machine or Operating System allows an almost unlimited number of executions of concurrent processes or tasks in one or more of the microprocessors.
That is, the Operating System can begin executing several tasks in sequence by using the START instruction. Once each task is activated, it must wait its turn to have its next instruction executed. However, many tasks are active at the same time and being executed concurrently.
By a process or task is merely meant any block of code that is executed by a microprocessor. These blocks of code provide computations, housekeeping or direct control of the process or machine under control.
The Primitives are the lowest level in the Operating System. Primitives do not allow for implicit preemption and it is the function of the Primitives to implement the basic building blocks of the Operating System on a physical machine (microprocessor) and absorb any changes to the physical machine. Each of the Primitives is further broken down into sublevels known as primitive operations to carry out the operations of the particular manager. Appendix B lists various Primitive operations of the Scheduler Manager 102 and Appendix C lists various Primitive operations of the Task Manager 104.
The portion of the Operating System residing in the CPM board 70 is known as the Dynamic Operating System (DOS). As an example of memory allocation, in the CPM board 70, there is preferably 6K bytes of RAM for tables, 8K bytes of ROM for the Operating System, and 48K bytes of ROM for the application programs.
The Operating System sets up various RAM tables throughout the system. Portions of the RAM associated with each of the control boards are allocated space for various initializing and run time control information of the Operating System. Each of the Primitives is responsible for maintaining information in the RAM necessary to synchronize and coordinate the overall control of the machine or process. For example, the Scheduler Manager 102 sets up a table in RAM preferably on the CPM board 70 defining the sequence or schedule of the completing of tasks or processes. It determines the priority of execution of the various scheduled tasks. A task or process that has been suspended or is waiting is not scheduled. However, once the event occurs that the task is waiting for, the task is then scheduled for execution.
The Task Control Manager 104 is the Primitive that keeps track of the status of a particular process or task. It determines how the various tasks are to be performed. For example, a particular task may require several Instruction Modules invoking many different Primitive operations. The Task Control Manager keeps a table in RAM on appropriate control boards of the status of each of the tasks. The Data Base Manager keeps track of the variables or constants or other information that are required to complete a task. This data is stored in a portion of RAM called a stack associated with each of the tasks.
Thus, for each task to be completed, the task itself must be scheduled by the Scheduler Manager 102, the status of the particular task is kept track of by the Task Control Manager 104 and any data required to complete the task is provided by the Data Base Manager 106. The Timer Manager 108 Primitive provides the necessary timing control for each task and the Communications Manager 110 Primitive provides the communications between the various control boards, preferably over a shared line.
As an example of how the Operating System operates, it is often required in the control of the printing machine to suspend or delay an operation for a set period of time. If a delay of 200 milliseconds is required, a Directive WAITR; 200 is used. This Directive invokes the Instruction Module $WAIT in turn invoking the Primitive operations:
START TIMER
SUSPEND TASK
EXECUTE NEXT TASK which provide a 200 millisecond delay.
That is, an operation application code (control code in ROM) calls in a Directive. The directive invokes one or more Instruction Modules 100. For example, if the application code calls in a WAIT DIRECTIVE, the WAIT Instruction Module will be invoked.
In turn, the WAIT Instruction Module will invoke the Timer Manager and Scheduler Manager which in turn provide the Primitive operation to complete the task. Once the WAIT Directive has been disseminated to the proper Primitives for execution, the Instruction Module can accept another Directive.
Essential to the Operating System control is a set of processes or tasks that can be executed. The control of the printing machine is dependent upon the proper scheduling and timely execution of these tasks. The activation of lamps, clutches, motors and response to various sensors and conditions is accomplished through the completion of the predetermined tasks. A given number of tasks are active at any one time and the Operating System concurrently executes these active tasks. Many tasks are related to other tasks. The Operating System supports full process control by means of Instruction Modules that invoke a process or task and maintain a thread of control with that process or invoke a task and maintain no linkages. Therefore, various Instruction Modules or procedures are provided by the Operating System to maintain links between related tasks.
Thus, a START instruction or procedure spawns a completely independent task while a FORK procedure spawns a related task termed a Child. This Child becomes a member of the calling procedure's family, also known as the Parent. Whenever a task is invoked by another task through a CALL procedure, the CALLing task is suspended (though still active) and the CALLed task becomes an active Child of the CALLing task. More detailed description of various Instruction Modules are provided in Appendix A.
All possible tasks are predefined and listed in a Static Task Control Block (STCB). The Static Task Control Block is a portion of Random Access Memory in all Operating System control boards. The RAM portion of the Static Task Control Block in the Dynamic Operating System (on CPM board 70) is illustrated in FIG. 5a.
With reference to FIGS. 5a and 5b, there is shown portions of the Dynamic Operating System RAM map, i.e. the allocation of RAM locations on the CPM controller board 70. In general, each of the Managers or Primitives has associated RAM space. The first two blocks or column 0 and 1 are allocated to the Communication Manager 110, and the next two columns as well as portions of columns 5-8 D, E and F are allocated to the Data Base Manager (DBM) 106, in particular, byte and word stacks, event data and suitable pointers. The remainder of columns D, E and F are allocated to the Scheduler Manager 102, in particular, the priority section and forward and backward links to other tasks.
The Task Control Manager (TCM) 104 is allocated portions of columns 5 through C as well as column 4. Column 4 is a portion of the Static Task Control Block that identifies the TCB number of RTID of the currently active instance of a task or process. The remaining portions of the RAM space allocated to the Task Control Manager comprise locations known as the Task Control Blocks or Buffers (TCBs). The Task Control Blocks are the active tasks and include a Compile Time Identification (CTID), a next instance designation, a Parent Run Time Identification (RTID), a Join RTID, an activation address, a condition variable, and an interpreter address table. The remaining allocations are allocated to the Timer Manager 108, in particular, Real Time Clock (RTC) and Machine Clock (MC) data.
In the preferred embodiment, there are a total of 255 tasks available that are identifiable in the STCB. The Task Control Manager 104 also maintains the list of the currently active tasks (TCBs). Preferably, there are a maximum of 96 tasks that can be active at one time. This list is constantly changing as new tasks are started or activated and current tasks are suspended or deleted. There is a Task Control Buffer (TCB) associated with each instance of an active task.
For a particular task, the Static Task Control Block will point to a particular Task Control Buffer. The buffer will list the identification of the task and such information as the identification of a Parent or previous task that the current task is related to and any other information linking the current task to any other task.
Since the Operating System resides in more than one control board, each of the control board operating systems maintain the status information for a task in Task Control Blocks.
In operation, when a task is invoked, a TCB is allocated and all of the necessary process information is inserted. If a task is invoked by a processor with no thread of control, the Operating System looks where the task resides. If the task resides in the processor invoking the task (i.e. resides locally), the task is allocated as TCB and the task execution is started. If the task is external, that is in a processor different from the invoking processor, the Operating System sends the invocation request over the shared line or communications channel 80 to the appropriate Operating System of the processor maintaining the task. That Operating System allocates the task a TCB and starts the task.
If the task is invoked with thread of control and the task resides locally, then the task is allocated a TCB and part of the information in the new TCB and the Parent task TCB becomes the other Task Control Buffer's IDs. If the new task is external, then the task is allocated a TCB locally and the Parent and Child tasks are tagged with each others IDs and the Operating System sends the request to the appropriate Operating System in the network. The Operating System then allocates a TCB for the Child task and a TCB for the Parent task and the appropriate tags are again made. This means that there is a pseudo TCB in each of the processors to represent the status of the Parent or Child task that resides in a different processor.
Certain task control Instruction Modules can modify that status. The current process control Instruction Module set is START for task invocation with no thread of control, FORK for task invocation with a thread of control, JOIN to allow a Parent task to synchronize with the Child, END to allow the Child task to join or synchronize to the Parent, and CANCEL to allow a Parent task to terminate the Child task.
This sytem of using pseudo TCBs to represent a Parent or Child process in another processor gives the entire Operating System the capacity of making any task executable from any of the processors and thereby transparent to the applications software that generates the request.
As by way of example, allocation of TCBs and relationship with other TCBs reference is made to FIG. 6. The left column CPM (1) illustrates the CPM board 70 identified as number 1 and the right column RDH (2) illustrates the RDH board 82 identified as number 2. It is also assumed that there is a Task A, i.e. a block of code to be executed, residing in the CPM ROM, and a Task B residing in the RDH ROM. A Compile Time ID (CTID) of 35 has been arbitrarily given Task A and a Compile Time ID of 55 has been given Task B.
With reference to column 1, in the first row of CPM (1), there is shown Task A with a CTID of 35 and no board identification meaning that the task resides on the CPM board. In the next row with a CTID of 55 is Task B. Task B has an identification of 0002 meaning that the Task B resides in ROM on the RDH board.
Now assume that Task A has been invoked or called upon and is being executed. The code for Task A in RAM is illustrated by the block labeled A under Task A. At some point in Task A there will be a call to Task B residing in the RDH ROM.
With reference to column 1 under the RAM memory section, Task A is being executed because at some point in time Task A had been called upon in the control. At the time Task A was called upon, a Task Control Buffer was established in RAM memory on the CPM board, placing Task A in the system as an active task. The Task Control Buffer provides information concerning the specific task, in particular its relationship to other tasks. Since the RAM memory Task Control Buffers are allocated arbitrarily, Task A is shown as the second allocation in the RAM TCB on the CPM board. That is, it is given a Run Time Identification (RTID) of 2, the Compile Time ID number 35 is recorded. If Task A was related to another task, at this time a number would appear under the Parent ID (P-ID). At this point, it is also not known if the Task A will be joined to any other task therefore the Join ID (J-ID) number is blank. The Task A resides in the CPM module therefore no address is given under the address block.
Now assume the Task A has proceeded to the point of calling Task B. At this point, the identification ID 55 of Task B in the Static Task Control Block will be examined, and it will be determined that Task B resides on the RHD board. Task B will be allocated a buffer in the CPM RAM with a CTID of 55 as shown. It is arbitrarily given a RTID number 1 and identified in the Task Control Buffer with certain information. Since the Parent or calling task is Task A, the number 2 will be put in the P-ID column. Since there is no task to be joined known at this time, a 0 is put in the J-ID block and the address shows the address of the location of the task.
The control then vectors to the execution of Task B in ROM in the RDH board. At this time, the RAM memory in the RDH control board is allocated a Task Control Block arbitrarily shown as run time ID number 4, and CTID 55. The Parent of Task B is Task A indicated by the number 3. Also, a block in the RDH RAM is allocated for Task A, ID 35. Additional information for task 35 is included in this Task Control Block, in particular the Join ID number 4 and the address 0001. This information identifies the Task A as being related to Task B with the return to Task A after the completion of Task B.
It should be noted that the Task Control Block in the RDH RAM memory for Task A is in essence a pseudo allocation since a block has already been allocated for Task A in the CPM RAM memory. Similarly, the allocation of a block in CPM RAM for Task B is merely a pseudo representation since Task B has already been allocated a Task Control Block in the RDH RAM.
The Scheduler Manager 102 of the Operating System partitions segments of the microprocessors time among all active tasks. The Scheduler Manager is responsible for determining which task is to receive the next chance to execute.
The Scheduler Manager 102 consists of a medium term scheduler and a short term scheduler. The medium scheduler determines which tasks are to receive execution time and determines the priority of execution. The short term scheduler is responsible for determining which task executes next.
The medium term scheduler handles the state transition of active tasks. The states of tasks are:
(1) Queued. Those tasks desiring an execution slice. Each Operating System's Instruction Module takes exactly one slice. A slice is the time the current task was given a chance to execute until it completes its first Operating System Instruction Module, approximately 500 microseconds. In order to achieve this, most of the Operating System Instruction Modules make calls to the short term scheduler upon completion of an Instruction Module. Other Instruction Modules call upon the medium term scheduler to change the attributes of tasks, (See Appendix B for more details on the Scheduler Manager Primitives)
(2) Suspended State. That is, the task is not to be considered for execution at the present time but will eventually want to execute, and
(3) Dead state. That is, the task is not known to the scheduler and therefore cannot receive an execution slice.
Each task that is scheduled has an associated priority. This determines how often a task is given the chance to execute the respect to all other tasks. Queued and suspended tasks both have priorities. Suspended tasks are associated with a priority so that the medium term scheduler can be used to queue them at the priority they are suspended at. The short term scheduler is unaffected by the dead and suspended tasks.
The Scheduler decides which of the queued tasks to execute by viewing the data structures associated with each task, that is, a priority and two links. These are found in the CPM RAM as illustrated in FIG. 5b. The two links are arranged to form a doubly linked circular list of tasks. The Scheduler generally decides that the next task to execute is the task that the current tasks forward link points to.
The Scheduler also keeps track of an internal variable called $NEXT.sub. ID. This variable is the Scheduler's best guess as to what the next task to execute after the task identified by $CURRENT.sub. ID completes its slice.
The circular list data structure is referred to as the Scheduler's queue. Placement within the queue with respect to the system task known as $LEVEL.sub. TASK determines priority. This task is placed such that all the high priority tasks execute before it executes. Before passing control to the first low task, it changes the Scheduler's idea of which task is to execute after the next one so that the Scheduler's normal routines will execute one low priority task and then return to $SYSTEM.sub. TASK, which is positioned just before the first high priority task. This is done by performing the following operations.
$CURRENT.sub. ID.fwdarw.next low task
$NEXT.sub. ID.fwdarw.$SYSTEM.sub. TASK
Then, all of the high priority tasks execute once and we return to $LEVEL.sub. TASK, which now allows the next low priority task to execute a slice before resuming execution at $SYSTEM.sub. TASK. This causes all the high priority tasks to execute once for each low execution of a slice of a low priority task. It insures that only one slice of execution by a low priority task will ever delay the response to executing any of the high priority tasks, no matter how many low priority tasks are queued.
In operation, the Scheduler maintains a list of high priority tasks to be executed and a list of low priorities to be executed. Upon execution of an Instruction Module pertaining to a particular task, approximately every 500 microseconds, the Scheduler Manager 102 will then point to the next high priority task to be executed. Each task generally comprises more than one Instruction Module. In this manner, a number of tasks are being performed concurrently. Even though no two tasks are being operated on simultaneously, because of the rapid cycling through the tasks, it appears there is simultaneous execution.
For example, with reference to FIG. 7 there is illustrated the high priority section and the low priority section of the Scheduler RAM on the CPM board. In operation, the Scheduler Manager 102 will point to the execution of the next Instruction Module in Task 212, then Task 81, Task 150 and all the tasks in the high priority section ending with Task 6. Then the Scheduler Manager 102 will point to the next task in sequence in the low priority section, e.g. Task 231. After execution of an Instruction Module for Task 231, the control will return to the high priority section with Task 212 to the last task, Task 6. The control will then jump to the low priority section, but this time to Task 12, the next task after the previously executed Task 231.
Additional states and operations have been added to the Scheduler to allow a type of interrupt processing. They are described in this section. Spooling:
When processing an interrupt-type operation, it is often desirable to schedule a task for immediate execution. In our application, this occasion arises when processing interprocessor communications. In order to react quickly and efficiently without substantially hindering the performance of the rest of the system, the spool-thread mechanism was used. This allows the user to put a task in a special form of suspension by threading it. A threaded task can be inserted into the short term scheduler quickly using the spool operation. A restriction is put on such a task; it will be given one execution slice and will then be considered to be dead until it is threaded and spooled again. This adds the states THREADED and SPOOLED to the set of possible states.
When the Scheduler spools a task, that task will be the next task to be executed after the current one finishes. This is accomplished by performing the following actions.
<spooled.sub. task>'s forward link.fwdarw.$NEXT.sub. ID
$NEXT.sub. ID.fwdarw.<spooled.sub. task>
Note that only the forward link of the spooled task is altered, and that no other member of the scheduler's queue has been altered to point to the spooled task. Thus, the spooled task executes only once and will never receive another slice. VIP Activation:
When extremely fast interrupt-like operation is required, the VIP activate mechanism is used. This mechanism allows Very Important Processes to be CALLed by interrupt routines so that the interrupt routine can alias itself as a particular task and thus enjoy some of the capabilities formerly reserved only for tasks. These tasks execute until they become suspended or dead, and then return to the interrupt code that invoked them. In order to isolate this special mechanism from the rest of the system, VIP operations are kept separate from the rest of the system and are referred to as foreground scheduler operations.
The Data Base Manager 106 controls all the data bases for the various tasks. One type of data base consists of two list structures for passing correpsondence and control. The other data base is used to implement the EVENT function of the Operating System.
The two list structures consist of a bytewide correspondence or byte stack and a wordwide control or word stack. Each list structure is a defined data area for maintaining a number of substructures associated with an active task. Each list structure consists of cells which can be thought of as information packets. A cell consists of two or three page adjacent bytes of memory with each cell divided into two fields, a link field and a data field. The first byte in the cell is the link field and contains an index, that is, an address of a cell within the list structure. If the list structure is the correspondence or byte stack, the next byte is the data field. If the list structure is the control or word stack, the next two bytes are dedicated to the data field.
The structure that couples an active task to a substructure is a pointer list. Two such lists are maintained by the Data Base Manager 106, one for each list structure. Each pointer list contains an entry for each possible active task in the system. The entry consists of a pointer to a substructure within the list structure. The Run Time Identification of a task is used to vector into the pointer list to retrieve the pointer to a task substructure. Initially the pointer list will be all zeros.
The stacks are maintained via a header pointer and the stack pointer list, pointing to the top of a stack associated with an active task. Within the stack, each cell has a link field and a data field. If the pointer to the stack is zero, there is no stack associated with this task.
When an entry is to be added to the stack, a free cell is found, the index of the previously added cell is put in the link field of the new cell, the data is moved to the data field and the index of the new cell is put in the stack pointer associated with the current task. This has the effect of adding the new cell to the top of the stack.
When an entry is to be removed from the stack, the data is removed from the cell on the top of the stack, the index and the link field of the cell is moved to the stack pointer (creating a new top of stack), and the cell is added to the list of available cells.
The function of the Communication Manager 110 is to provide for efficient control and manipulation of all communications between the microprocessors on the CPM, PHR, XER, MIR, DCR and sorter boards 70, 72, 74, 76, 78, 240, 242, 244 and 246, as shown in FIG. 2. It is responsible for all formatting preparation of information to be transmitted. It is also responsible for guaranteeing reliable and correct transmission of the information or notifying a higher level of control when this is not possible. It is the data link between the microprocessors.
The Timer Manager 108 provides a set of Primitive operations for the ordered suspension and wake up of all tasks requiring real time or machine clock delays. The timer procedures use a two-celled singly linked list to maintain information on all suspended tasks. One cell contains the tasks suspend duration while the adjoining cell contains the link to the task with a greater than or equal suspended time duration. The last task on this list points to the list header.
A task will normally request to be suspended for some duration and unless the SUSPEND is cancelled, its requested duration is run to completion.
A task could ask to be suspended for any of the following reasons:
(i) It's waiting for input, e.g. register finger, front panel command, pitch reset, paper path switches, or sensor,
(ii) A timed wait on either the Real Time Clock or the Machine Clock,
(iii) It is in a RACE waiting on a case condition to be true, where the case conditions could be any of the reasons i or ii.
In accordance with the present invention, the control elements or boards of sorters 240, 242, 244 and 246 are connected together such that each processor on each board would communicate with the next processor until the last processor did not receive a response. The last processor would, therefore, remember that it was at the end of a chain of processors. In other words, the control boards are viewed as being connected in a serial chain with one of the boards connected directly to the master control or CPM board 70, the sorter control boards or processors are viewed as just one processor.
With reference to FIG. 8, there is shown a chain of four sorters, 1, 2, 3 and 4. Each of the sorters 1, 2, 3 and 4 is controlled by control boards 240, 242, 244 and 246, respectively. Each of the control boards has identical control code. Assuming a capacity of 20 sheets per sorter, the control on a 50 sheet run must be able to place 20 sheets in sorter 1, 20 sheets in sorter 2 and 10 sheets in sorter 3. The control code in each of the control boards begins with a Start Receive Sheet command. Sorter 1 control board 240 follows the following routine:
Start Receive Sheet
If the number of received sheets is greater than 20
Start Next Receive Sheet Command.
If the capacity in sorter 1 has reached 20 then the Start Next Receive Sheet Command is executed to convey control to the control board 242. Thus, the task Receive Sheet is begun in the next control board in the chain, in particular control board 242.
When the head of chain control board 240 received an instruction from the CPM board it would determine if the message was meant for itself. If not, it would pass the request on to the next control board in the chain. The appropriate control board in the chain would service the request. This means that each control board in the chain is cognizant about himself and the control board one up the chain and one down the chain.
The operating system running on the sorter control boards and on the CPM control board make up an operating system that is composed of many control boards on a shared communications channel, where each control board has its own communications identification (ID). When a task invocation request is made, the local operating system examines the request and determines if the request is to a local task or to a task on another control board. If it is to another control board, the local operating system sends the request to that control board.
The operating system running on the sorter control boards statically allocates its Task Control Blocks, so each task in the sorter system is allocated three Task Control Blocks, one for the task running in the local sorter control board and one for each of the control boards one up and one down the chain from the local sorter control board. The additional Task Control Blocks maintain the status information of the base task running in one of the other sorter control boards.
Each of the Task Control Blocks that is allocated for each task is given a separate name so that any one of the three can be invoked. The control convention used was to add the prefix NEXT:X for the Task Control Block that is one down the chain or the prefix PREV:X for the Task Control Block one up the chain.
The same code exists in each control board for each instance of X but the local code can determine which instance it wishes to invoke. The control boards are connected together in a serial fashion by virtue of the assignment of the control board communications IDs. When a control board wishes to communicate up or down the chain, the control board adds or subtracts one from its own communications ID and uses the ID to send the invocation request.
Each of the groups of Task Control Blocks that represent a particular task are a series of buffers grouped together. If a task invocation request is made for NEXT or PREV, then the task ID is incremented or decremented by one like the communications ID to get the ID of the actual task as it exists in its own local control board. The only Task Control Block in the group that actually executes code is the middle one in the chain.
This allows communications in both directions, up or down the chain. The limitations that this scheme has for the number of sorters, or control boards that can be added to the chain is bounded by the value of the communications ID or the amount of time that it may take to echo a request from the CPM control board to the End of Chain control board and back.
While there has been illustrated and described what is at present considered to be a preferred embodiment of the present invention, it will be appreciated that numerous changes and modifications are likely to occur to those skilled in the art, and it is intended in the appended claims to cover all those changes and modifications which fall within the true spirit and scope of the present invention. ##SPC1##
Claims
- 1. A printing machine having a plurality of sorter modules, each of said sorter modules being controlled by an associated control element, said control elements being interchangeable, the method of controlling said sorter modules comprising the steps of
- (1) sending a sort instruction to a first of said control elements identifying a sort operation,
- (2) said first control element determining if its associated sorter module can complete the sort operation identified by the sort instruction,
- (3) if the first control element associated sorter module cannot complete the sort operation, said first control element associated sorter completes a portion of the sort operation and sends the sort instruction to a second control element,
- (4) said second control element determines that its associated sorter module can complete the sort operation identified by the sort instruction, and
- (5) said second control element controls operation of its associated sorter to complete the sort operation begun by the sorter module associated with the first control element.
- 2. A printing machine having a control including a master processor providing sort instructions and a plurality of control elements, and a plurality of sorter devices, selected ones of the sorter devices cooperating with one another to complete a sorting requirement, each of the sorter devices completing a portion of the requirement, each of said sorter devices being controlled by an associated control element, said control elements being interchangeable with the associated sorter devices, the method of selecting said sorter devices to complete the sorting requirement comprising the steps of
- (1) the master processor sending a sort instruction to a first one of the control elements with a sorting requirement,
- (2) said first one of the control elements controlling its associated sorter device in accordance with the instruction to complete at least a portion of the sorting requirement,
- (3) said first control element determing it can not complete the sorter requirement, and
- (4) said first control element downloading the instruction to a second control element, the second control element controlling its associated sorter device to complete the sorting requirement.
- 3. In a machine control having a master control device, said machine having a plurality of sorter elements for sorting documents, each of said sorter elements being provided with an associated identical controller, each sorter element having sorter bins with a given sorter bin capacity for storing said sorted documents, the method of operation of the sorter including the steps of
- (a) communicating from the master control device to a first one of the identical controllers a requirement to sort a specific number of documents in the sorter bins,
- (b) the first one of said identical controllers responding to the sorter requirement in accordance with the bin capacity of its associated sorter element to sort a first portion of the specific number of documents,
- (c) said first one of said identical controllers conveying said requirement less the first portion of the specific number of documents completed by the first controller to a second one of the identical controller, and
- (d) said second one of the identical controllers continuing the requirement up to the capacity of its sorter bins.
US Referenced Citations (32)