Automated material handling systems are used in semiconductor fabrication facility to carry out automated functions more efficiently, consistently, and safely than can be done via manual means. Lots are transferred by the automated material handling systems to different process stages, and thus the lots are able to be automatically processed by different tools. Thus, AMHS have been widely used in the semiconductor fabrication.
Aspects of the present disclosure are best understood from the following detailed description when read with the accompanying figures. It is noted that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.
The following disclosure provides many different embodiments, or examples, for implementing different features of the provided subject matter. Specific examples of components and arrangements are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. For example, the formation of a first feature over or on a second feature in the description that follows may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features may be formed between the first and second features, such that the first and second features may not be in direct contact. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
The terms used in this specification generally have their ordinary meanings in the art and in the specific context where each term is used. The use of examples in this specification, including examples of any terms discussed herein, is illustrative only, and in no way limits the scope and meaning of the disclosure or of any exemplified term. Likewise, the present disclosure is not limited to various embodiments given in this specification.
Although the terms “first,” “second,” etc., may be used herein to describe various elements, these elements should not be limited by these terms. These terms are used to distinguish one element from another. For example, a first element could be termed a second element, and, similarly, a second element could be termed a first element, without departing from the scope of the embodiments. As used herein, the term “and/or” includes any and all combinations of one or more of the associated listed items.
As used herein, the terms “comprising,” “including,” “having,” “containing,” “involving,” and the like are to be open-ended, i.e., to mean including but not limited to.
Reference throughout the specification to “one embodiment” or “an embodiment” means that a particular feature, structure, implementation, or characteristic described in connection with the embodiment is included in at least one embodiment of the present disclosure. Thus, uses of the phrases “in one embodiment” or “in an embodiment” in various places throughout the specification are not necessarily all referring to the same embodiment. Furthermore, the particular features, structures, implementation, or characteristics may be combined in any suitable manner in one or more embodiments.
As illustratively shown in
In some embodiments, the process flow 124 includes a series of process stages, in which each of the process stages includes a number of tools for processing the lots. In some embodiments, the lots are wafer lots, and the process stages include a chemical vapor deposition (CVD) process, an etching process, a photoresist coating process, a heating process, an ion implantation process, etc. In further embodiments, the wafer lots are super hot run (SHR). When wafer lots are the SHR, the wafer lots are considered to be an urgent order for wafer fabrication. In other words, the SHR is required to be processed as efficiently as possible. As a result, tools at the process stages are preserved for processing the SHR.
In some embodiments, the processing unit 140 includes a forecast engine 142 and an execution engine 144. The forecast engine 142 is configured to dispatch the SHR for N process stages of the process stages according to arrival durations and process durations, in which N is a positive integer. The arrival durations are time intervals of the SHR arrived at the N process stages, and the process durations are time intervals of the SHR predetermined to be processed at the N process stages.
In other words, for an N-th process stage of the N process stages, an N-th process duration is an average time interval for the lots predetermined to be processed at the N-th process stages, and an N-th arrival duration is a time interval of the SHR arrived at 1st process stage and the process durations of the (N−1) process stages. In some embodiments, as shown in
The execution engine 144 is configured to a specific tool of the tools at each of the N process stages for the SHR, according to the arrival durations and remain operation durations of the tools. With such configuration, the specific tools at the N process stages are preserved to process the SHR, and the SHR is thus processed with great efficiency.
In some embodiments, the storage unit 120 is a memory device, e.g., a SRAM, DRAM, or a hard disk, which is able to be accessed by the tools and the processing unit 140 in real time. The arrangement of the system 100 is given for illustrative purposes only. Various arrangements of the system 100 are within the contemplated scoped of the present disclosure.
For illustration, the operations of the system 100 in
In the following descriptions, for simplicity, the moving time for the lots moved between the tools in different stages are considered to be zero. However, in some other embodiments, the arrival durations are calculated more precisely by considering actual time for the lots moving between the tools, e.g., moving from the tool 1 at the first process stage to each of the tools 2-4 at the second process stage.
In operation S201, the forecast engine 142 determines whether the arrival duration TR2 is less than the process duration TP2. As the arrival duration TR2 is 20 minutes and the process duration TP2 is 40 minutes, the forecast engines 142 thus determines that the arrival duration TR2 is less than the process duration TP2, and operation S202 is then performed.
In operation S202, the forecast engine 142 determines whether the arrival duration TR3 is less than the process duration TP3. As described above, for simplicity, the N-th arrival duration is considered to be the time of the SHR arrived at the N-th process stage. In other words, when the SHR is at the first process stage, the arrival duration TR3 for the SHR arrived at the third process stage is estimated to be the sum of the arrival duration TR2 and the process duration TP2. Thus, the arrival duration TR3 is calculated as: 20+40=60 minutes, by the forecast engine 142. Since the arrival duration TR3 (60 minutes) is less than the process duration TP3 (80 minutes), operation S203 is performed.
In operation S203, the forecast engine 142 further determines whether the arrival duration TR4 is less than the process duration TP4. Similarly, based on similar condition, the arrival duration TR4 is calculated by summing the arrival duration TR3 and the process duration TR3. The arrival duration TR4 is calculated as: 60+80=140 minutes, by the forecast engine 142. Since the arrival duration TR4 (140 minutes) is less than the process duration TP4 (240 minutes), the forecast engine 142 determines that the SHR is presently pre-dispatched to the second process stage, the third process stage and the fourth process stage, and operation S204 is then performed.
In operation S204, the execution engine 144 determines whether one of remain operation durations TO2-TO4 of the tools 2-4 at the second process stage is less than the arrival duration TR2. The remain operation duration is a time interval for the tool to process a present lot previously arrived at the tool. If there is one of remain operation durations of the tools 2-4 is less than the arrival duration TR2, operation S205 is performed. If not, operation S210 is performed.
For illustration, as shown in
In operation S205, the execution engine 144 assigns one of the tools 2-3 at the second process stage by comparing remain operation durations TO2-TO3 of tools 2-3 with the arrival duration TR2, respectively.
For illustration, the execution engine 144 compares a lost duration of the tool 2 with a lost duration of the tool 3. The lost durations are the time for the tools 2-3 being not operated. In other words, the lost duration of the tool 2 is an idle time of the tool 2, and the lost duration of the tool 3 is the idle time of the tool 3. As mentioned above, when the SHR arrives at the second process stage, the tools 2-3 are on standby. Thus, the lost duration of the tool 2 is calculated by the execution engine 144 from the time difference between the arrival duration TR2 and the remain operation duration TO2. Similarly, the lost duration of the tool 3 is also calculated by the execution engine 144 from the time difference between the arrival duration TR2 and the remain operation duration TO3. Since the lost duration of the tool 3, i.e., 20-15=5 minutes, is less than the lost duration of the tool 2, i.e., 20-5=15 minutes, the execution engine 144 assigns the tool 3 for the SHR. Thus, the tool 2 with a higher lost duration is able to immediately process other lots. With such configuration, the production capacity of wafer fabrication is maintained, and the process efficiency for SHR is improved.
In some embodiments, when the execution engine 144 finds that there is only one of the remain operation duration TO2-TO4 at the second process stage is less than the arrival duration TR2 in operation S204, the execution engine 144 assigns the corresponding one of the tools 2-4 for the SHR without performing operation S205.
In operation S206, the execution engine 144 determines whether one of remain operation durations TO5-TO7 of the tools 5-7 at the third process stage is less than the arrival duration TR3. If there is one of remain operation durations TO5-TO7 is less than the arrival duration TR3, operation S207 is performed. If not, operation S210 is performed.
For illustration, as the remain operation duration TO7 (70 minutes) of the tool 7 is greater than the arrival duration TR3 (60 minutes), the tool 7 is not be dispatched for the SHR by the execution engine 144. On other hand, as both of the remain operation duration TO5 (40 minutes) of the tool 5 and the remain operation duration TO6 (40 minutes) of the tool 6 is greater than the arrival duration TR3 (60 minutes), the tools 5-6 are able to be assigned for the SHR.
In operation S207, the execution engine 144 assigns one of the tools 5-6 at the third process stage by comparing remain operation durations TO5-TO6 of the tools 5-6 with the arrival duration TR3, respectively.
For illustration, the execution engine 144 compares a lost duration of the tool 5 with a lost duration of the tool 6. The lost duration of the tool 5 is calculated by the execution engine 144 from the time difference between the arrival duration TR3 and the remain operation duration TO5. Similarly, the lost duration of the tool 6 is also calculated by the execution engine 144 from the time difference between the arrival duration TR3 and the remain operation duration TO6. Since the lost duration of the tool 5, i.e., 60-40=20 minutes, is less than the lost duration of the tool 6, i.e., 60-10=50 minutes, the execution engine 144 assigns the tool 5 for the SHR.
In operation S208, the execution engine 144 determines whether one of remain operation durations TO8-TO10 of the tools 8-10 at the fourth process stage is less than the arrival duration TR4. If there is one of remain operation durations TO8-TO10 is less than the arrival duration TR4, operation S209 is performed. If not, operation S210 is performed.
For illustration, as shown in
In operation S209, the execution engine 144 assigns one of the tools 9-10 at the third process stage by comparing remain operation durations TO9-TO10 of the tools 9-10 with the arrival duration TR4, respectively.
Similarly, the execution engine 144 compares a lost duration of the tool 9 with a lost duration of the tool 10. The lost duration of the tool 9 is calculated by the execution engine 144 from the time difference between the arrival duration TR4 and the remain operation duration TO9. The lost duration of the tool 10 is calculated by the execution engine 144 from the time difference between the arrival duration TR4 and the remain operation duration TO10. Since the lost duration of the tool 10, i.e., 140-120=20 minutes, is less than the lost duration of the tool 9, i.e., 140-100=40 minutes, the execution engine 144 assigns the tool 10 for the SHR.
In operation S210, the system 100 checks there are no appropriate tools to be assigned for the SHR, and the operations of the system 100 are thus completed. The SHR will be initiatively notified by the specific tool at the next process stage, and the SHR is dispatched to the specific tool when the remain operation of the specific tool is completed.
By performing the method 200, the system 100 accurately forecasts the arrival durations TR1-TR4 of the four process stages, and thus the system 100 pre-assigns the tool 3 at the second process stage, the tool 5 at the third process stage and the tool 10 at the fourth process stage for the SHR. With such configuration, both of the production capacity and the process efficiency for SHR are improved.
In some embodiments, the system 100 is integrated with automated material handling systems (AMHS). In some embodiments, the processing unit 140 is a controller chip. In some other embodiments, the forecast engine 142 and the execution engine 144 are implemented with individual controller chips. In various embodiments, the processing unit 140 is a design tool carried on a non-transitory computer-readable medium storing the method 200. In other words, the processing unit 140 is implemented in hardware, software, firmware, and the combination thereof. For illustration, if speed and accuracy are determined to be paramount, a mainly hardware and/or firmware vehicle is selected and utilized. Alternatively, if flexibility is paramount, a mainly software implementation is selected and utilized.
The numbers of the process stages in
Compared with the
Explained in a different way, during operations S201-S203, the forecast engine 142 determines that the number of process stages to which the SHR is able to be pre-dispatched for efficient process. As the process duration TP4 is less than the arrival duration TR4, the operations of the fourth process stage is unable to be predicted when the SHR is processed at the first process stage. Thus, as shown in
Therefore, it is understood that operations S201-S207 and operation S210 of the method 200 are performed under the condition shown in
Reference is made to both of
For illustration, as illustratively shown in
As shown in
In some approaches, the tools are preserved for processing the SHR at each process stages at initial. However, the SHR is processed with a longer cycle time if wrong tools are preserved. Further, as the tools are preserved at initial, high lost durations are thus caused, resulting in a much lower production capacity. In addition, the tools are required to be re-assigned for the SHR from manual judgments by operators when the tool events are triggered. As a result, both the production capacity and the process efficiency for SHR are reduced.
Instead, with the configurations illustrated in
In some embodiments, a method is disclosed that includes the operations below. A lot is dispatched for N process stages of process stages, according to arrival durations of the lot arrived at the N process stages and process durations of the lot predetermined to be processed at the N process stages, in which N is a positive integer. A first tool of tools at each one of the N process stages are assigned for the lot, in which the first tool at a first process stage of the N process stages is configured to be assigned for the lot according to a first arrival duration of the arrival durations of the lot arrived at the first process stage and remain operation durations of the tools at the first process stage.
Also disclosed is a system that includes a storage unit and a processing unit. The storage unit is configured to store a process flow for a super hot run (SHR), in which the process flow includes process stages, and each of the process stages includes a first tool and a second tool. The processing unit is configured to dispatch the SHR for N process stages of the process stages, according to arrival durations of the SHR arrived at the N process stages and process durations of the SHR predetermined to be processed at the N process stages, and to assign the first tool at each one of the N process stages for the SHR. The first tool at a first process stage of the N process stages is configured to be assigned for the SHR, according to a first arrival duration of the arrival durations of the lot arrived at the first process stage, a first remain operation duration of the first tool at the first process stage, and a second remain operation duration of the second tool at the first process stage, in which N is a positive integer, and the first arrival duration is greater than the first remain operation duration.
Also disclosed is a non-transitory computer readable medium for performing a method that includes the operations below. A super hot run (SHR) is dispatched for N process stages of process stages, according to arrival durations of the SHR arrived at the N process stages and process durations of the SHR predetermined to be processed at the N process stages, in which N is a positive integer. A first tool of tools at each one of the N process stages are assigned for the SHR, in which the first tool at a first process stage of the N process stages is configured to be assigned for the SHR according to a first arrival duration of the arrival durations of the SHR arrived at the first process stage and remain operation durations of the tools at the first process stage.
The foregoing outlines features of several embodiments so that those skilled in the art may better understand the aspects of the present disclosure. Those skilled in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. Those skilled in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the present disclosure, and that they may make various changes, substitutions, and alterations herein without departing from the spirit and scope of the present disclosure.
Number | Name | Date | Kind |
---|---|---|---|
6134482 | Iwasaki | Oct 2000 | A |
6470231 | Yang | Oct 2002 | B1 |
7085614 | Gartland | Aug 2006 | B1 |
20050071031 | Lin | Mar 2005 | A1 |
20060079979 | Giebels | Apr 2006 | A1 |
20070050093 | Furukawa | Mar 2007 | A1 |
20080195241 | Lin | Aug 2008 | A1 |
20100278622 | Huang | Nov 2010 | A1 |
Number | Date | Country |
---|---|---|
2007123809 | May 2007 | JP |
Entry |
---|
Derwent Description of JP2007123809A, 2007, 2pg. (Year: 2007). |
Number | Date | Country | |
---|---|---|---|
20160091891 A1 | Mar 2016 | US |