Number | Date | Country | Kind |
---|---|---|---|
2001-52779 | Feb 2001 | JP |
This application is a continuation of Ser. No. 09/952,024, filed Sep. 14, 2001.
Number | Name | Date | Kind |
---|---|---|---|
5621654 | Cohen et al. | Apr 1997 | A |
5761083 | Brown, Jr. et al. | Jun 1998 | A |
6122603 | Budike, Jr. | Sep 2000 | A |
20020072868 | Bartone et al. | Jun 2002 | |
20020087220 | Tveit et al. | Jul 2002 |
Entry |
---|
Bloom, Representing the Production Cost Curve of Power System Using the Method of Moments, 1991, IEEE, pp. 84-90.* |
Shumuta, Cost-Effectiveness Model For Renewal Planning of Electric Power Facilities, Jan. 2000, ASCE, pp. 1-6.* |
Hara et al., Valuation About Remaining Service Life of GBM Hydraulic Power Plant Units Technical and Economical Aspect, Jul. 1994, IEEE, pp. 804-806. |
Number | Date | Country | |
---|---|---|---|
Parent | 09/952024 | Sep 2001 | US |
Child | 10/218488 | US |