System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators

Abstract
Systems, methods and apparatus for power management in an electric power grid are disclosed. A power flow to a plurality of power consuming devices in the electric power grid is enabled and disabled by a plurality of controllable devices under the control of one or more client devices. An apparatus receives a power control command and select at least one client device to which to issue a power reduction message. The power reduction message comprises an amount of electric power to be reduced to at least one of the plurality of power consuming devices for a predetermined time. A database stores information relating to power consumed by the plurality of power consuming devices based on measurement and verification.
Description
BACKGROUND OF THE INVENTION
1. Field of the Invention

The present invention relates generally to the field of electrical power load control systems and more particularly to a method and system for actively controlling power load management for individual customers and optionally tracking power savings for both the individual customer as well as the overall electric utility or electric power grid operator(s).


2. Description of Related Art

The increased awareness of the impact of carbon emissions from the use of fossil fueled electric generation combined with the increased cost of producing peak power during high load conditions has increased the need for alternative solutions utilizing load control as a mechanism to defer, or in some cases eliminate, the need for the deployment of additional generation capacity by electric utilities. Existing electric utilities are pressed for methods to defer or eliminate the need for construction of fossil-based electricity generation. Today, a patchwork of systems exist to implement demand response load management programs, whereby various radio subsystems in various frequency bands utilize “one-way” transmit only methods of communication. Under these programs, RF controlled relay switches are typically attached to a customer's air conditioner, water heater, or pool pump. A blanket command is sent out to a specific geographic area whereby all receiving units within the range of the transmitting station (e.g., typically a paging network) are turned off during peak hours at the election of the power utility or electric power grid operator(s). After a period of time when the peak load has passed, a second blanket command is sent to turn on those devices that have been turned off.


While tele-metering has been used for the express purpose of reporting energy usage, no techniques exist for calculating power consumption, carbon gas emissions, sulfur dioxide (SO.sub.2) gas emissions, and/or nitrogen dioxide (NO.sub.2) emissions, and reporting the state of a particular device under the control of a two-way positive control load management device. In particular, one way wireless communications devices have been utilized to de-activate electrical appliances, such as heating, ventilation, and air-conditioning (HVAC) units, water heaters, pool pumps, and lighting, from an existing electrical supplier or distribution partner's network. These devices have typically been used in combination with wireless paging receivers that receive “on” or “off” commands from a paging transmitter. Additionally, the one-way devices are typically connected to a serving electrical supplier's control center via landline trunks, or in some cases, microwave transmission to the paging transmitter. The customer subscribing to the load management program receives a discount for allowing the serving electrical supplier (utility) to connect to their electrical appliances and deactivate those appliances during high energy usage periods.


While one-way devices are generally industry standard and relatively inexpensive to implement, the lack of a return path from the receiver, combined with the lack of information on the actual devices connected to the receiver, make the system highly inefficient for measuring the actual load shed to the serving utility. While the differential current draw is measurable on the serving electric utility's transmission lines, the actual load shed is approximate and the location of the load deferral is approximated at the control center of the serving utility.


One exemplary tele-metering system is disclosed in U.S. Pat. No. 6,891,838 B1. This patent describes details surrounding a mesh communication of residential devices and the reporting and control of those devices, via WANs, to a computer. The stated design goal in this patent is to facilitate the “monitoring and control of residential automation systems.” This patent does not explain how a serving utility or customer could actively control the devices to facilitate the reduction of electricity. In contrast, this patent discloses techniques that could be utilized for reporting information that is being displayed by the serving utility's power meter (as do many other prior applications in the field of tele-metering).


An additional exemplary tele-metering system is disclosed in U.S. Patent Application Publication No. 2005/0240315 A1. The primary purpose of this published application is not to control utility loads, but rather “to provide an improved interactive system for remotely monitoring and establishing the status of a customer utility load.” A stated goal of this publication is to reduce the amount of time utility field personnel have to spend in the field servicing meters by utilizing wireless technology.


Another prior art system is disclosed in U.S. Pat. No. 6,633,823 B2, which describes, in detail, the use of proprietary hardware to remotely turn off or turn on devices within a building or residence. While initially this prior art generally describes a system that would assist utilities in managing power load control, the prior art does not contain the unique attributes necessary to construct or implement a complete system. In particular, this patent is deficient in the areas of security, load accuracy of a controlled device, and methods disclosing how a customer utilizing applicable hardware might set parameters, such as temperature set points, customer preference information, and customer overrides, within an intelligent algorithm that reduces the probability of customer dissatisfaction and service cancellation or churn.


Attempts have been made to bridge the gap between one-way, un-verified power load control management systems and positive control verified power load control management systems. However, until recently, technologies such as smart breakers and command relay devices were not considered for use in residential and commercial environments primarily due to high cost entry points, lack of customer demand, and the cost of power generation relative to the cost of implementing load control.


One such gap-bridging attempt is described in U.S. Patent Application Publication No. US 2005/0065742 A1. This publication discloses a system and method for remote power management using IEEE 802 based wireless communication links. The system disclosed in this publication includes an on-premise processor (OPP), a host processor, and an end device. The host processor issues power management commands to the OPP, which in turn relays the commands to the end devices under its management. While the disclosed OPP does provide some intelligence in the power management system, it does not determine which end devices under its control to turn-off during a power reduction event, instead relying on the host device to make such decision. For example, during a power reduction event, the end device must request permission from the OPP to turn on. The request is forwarded to the host device for a decision on the request in view of the parameters of the on-going power reduction event. The system also contemplates periodic reading of utility meters by the OPP and storage of the read data in the OPP for later communication to the host device. The OPP may also include intelligence to indicate to the host processor that the OPP will not be able to comply with a power reduction command due to the inability of a load under the OPP's control to be deactivated. However, neither the host processor nor the OPP determine which loads to remove in order to satisfy a power reduction command from an electric utility, particularly when the command is issued by one of several utilities under the management of a power management system. Further, neither the host processor nor the OPP tracks or accumulates power saved and/or carbon credits earned on a per customer or per utility basis for future use by the utility and/or customer. Still further, the system of this publication lacks a reward incentive program to customers based on their participation in the power management system. Still further, the system described in this publication does not provide for secure communications between the host processor and the OPP, and/or between the OPP and the end device. As a result, the described system lacks many features that may be necessary for a commercially viable implementation.


Therefore, a need exists for a system and method for active power load management for individual customers that is optionally capable of tracking power savings for the individual customer as well as the electric utility to thereby overcome the shortcomings of the prior art.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a block diagram of an IP-based active power load management system in accordance with an exemplary embodiment of the present invention.



FIG. 2 is a block diagram illustrating an exemplary active load director (ALD) server as shown in the system of FIG. 1.



FIG. 3 is a block diagram illustrating an exemplary active load client and smart breaker module as shown in the system of FIG. 1.



FIG. 4 is an operational flow diagram illustrating a method for automatically scheduling service calls in an active power load management system in accordance with one exemplary embodiment of the present invention.



FIG. 5 is an operational flow diagram illustrating a method for activating new subscribers in an active power load management system in accordance with another exemplary embodiment of the present invention.



FIG. 6 is an operational flow diagram illustrating a method for managing events occurring in an active power load management system in accordance with yet another exemplary embodiment of the present invention.



FIG. 7 is an operational flow diagram illustrating a method for actively reducing consumed power and tracking power savings on an individual customer basis in an active power load management system in accordance with another exemplary embodiment of the present invention.



FIG. 8 is an operational flow diagram illustrating a method for tracking cumulative power savings of an electric utility in an active power load management system during a power savings event in accordance with yet another exemplary embodiment of the present invention.





DETAILED DESCRIPTION OF EXEMPLARY EMBODIMENTS

Before describing in detail exemplary embodiments that are in accordance with the present invention, it should be observed that the embodiments reside primarily in combinations of apparatus components and processing steps related to actively managing power loading on an individual subscriber basis and optionally tracking power savings incurred by both individual subscribers and an electric utility, or any electric power grid operator(s). Accordingly, the apparatus and method components have been represented where appropriate by conventional symbols in the drawings, showing only those specific details that are pertinent to understanding the embodiments of the present invention so as not to obscure the disclosure with details that will be readily apparent to those of ordinary skill in the art having the benefit of the description herein.


In this document, relational terms, such as “first” and “second,” “top” and “bottom,” and the like, may be used solely to distinguish one entity or element from another entity or element without necessarily requiring or implying any physical or logical relationship or order between such entities or elements. The terms “comprises,” “comprising,” or any other variation thereof are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements, but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. The term “plurality of” as used in connection with any object or action means two or more of such object or action. A claim element proceeded by the article “a” or “an” does not, without more constraints, preclude the existence of additional identical elements in the process, method, article, or apparatus that includes the element. Additionally, the term “ZigBee” refers to any wireless communication protocol adopted by the Institute of Electronics & Electrical Engineers (IEEE) according to standard 802.15.4 or any successor standard(s), the term “Wi-Fi” refers to any communication protocol adopted by the IEEE under standard 802.11 or any successor standard(s), the term “WiMax” refers to any communication protocol adopted by the IEEE under standard 802.16 or any successor standard(s), and the term “Bluetooth” refers to any short-range communication protocol implementing IEEE standard 802.15.1 or any successor standard(s). Additionally or alternatively to WiMax, other communications protocols may be used, including but not limited to a “1 G” wireless protocol such as analog wireless transmission, first generation standards based (IEEE, ITU or other recognized world communications standard), a “2-G” standards based protocol such as “EDGE or CDMA 2000 also known as 1×RTT”, a 3G based standard such as “High Speed Packet Access (HSPA) or Evolution for Data Only (EVDO), any accepted 4G standard such as “IEEE, ITU standards that include WiMax, Long Term Evolution “LTE” and its derivative standards, any Ethernet solution wireless or wired, or any proprietary wireless or power line carrier standards that communicate to a client device or any controllable device that sends and receives an IP based message.


It will be appreciated that embodiments of the invention described herein may be comprised of one or more conventional processors and unique stored program instructions that control the one or more processors to implement, in conjunction with certain non-processor circuits, some, most, or all of the functions for managing power load distribution and tracking individual subscriber power consumption and savings in one or more power load management systems as described herein. The non-processor circuits may include, but are not limited to, radio receivers, radio transmitters, antennas, modems, signal drivers, clock circuits, power source circuits, relays, meters, smart breakers, current sensors, and user input devices. As such, these functions may be interpreted as steps of a method to distribute information and control signals between devices in a power load management system. Alternatively, some or all functions could be implemented by a state machine that has no stored program instructions, or in one or more application specific integrated circuits (ASICs), in which each function or some combinations of functions are implemented as custom logic. Of course, a combination of the two approaches could be used. Thus, methods and means for these functions have been described herein. Further, it is expected that one of ordinary skill in the art, notwithstanding possibly significant effort and many design choices motivated by, for example, available time, current technology, and economic considerations, when guided by the concepts and principles disclosed herein, will be readily capable of generating such software instructions, programs and integrated circuits (ICs), and appropriately arranging and functionally integrating such non-processor circuits, without undue experimentation.


Recently, the IEEE has released improved WiMax wireless standards that have facilitated the consideration of new technologies to improve the response and control of power load control devices employing smart breaker technologies. Embodiments of the present invention expand upon and enhance prior technologies by, among other things, employing WiMax or IP-based load control in a system with the ability to monitor, in real time, the amount of power deferred (or carbon, SO.sub.2, or NO.sub.2 eliminated). These improvements allow new options for electric utilities to defer or invest in new power generation that is friendlier to the environment.


IP-based power management is advantageous over existing systems for many reasons. For example, positive control allows a system controller to receive a response from an end device installed at a customer location, which indicates that the actual target device has turned “off” or “on.” Additionally, each equipment identifier is unique and each IP address is either dynamically assigned when the device is activated (e.g., through use of the dynamic host configuration protocol (DHCP)) or statically assigned by the serving IP network, thereby providing enhanced security to protect against an act of random terrorism or sabotage inadvertently shutting down power services. Existing power management systems, including those utilizing radio subsystems, do not address security problems adequately and thus are more likely susceptible to hostile or malicious acts.


IP-based systems are also bandwidth or network efficient. For example, IP devices are controlled via the 7-layer Open Systems Interconnection (OSI) model whereby the payload of each packet can contain a message or “change in state” and does not require synchronous communication. This method of transmission allows for very minimum overhead and low data rates on a broadband network. Additionally, IP devices can report many states, including “no power.” For example, the active load client 300 may be implemented with a battery backup mechanism to provide backup or auxiliary power to the active load client 300 when AC power is lost. In this case, when battery backup is invoked, the active load client 300 can report a “no power” condition. Alternatively, a “no power” condition may be assumed if an active load client 300 fails to timely respond to a message (e.g., a poll or other message) from the ALD server 100, particularly where multiple active load clients 300 in a geographic area fail to timely respond to the ALD server messaging. Because the geographic location of each customer premises and active load client 300 may be known at the time of installation or thereafter (e.g., using GPS coordinates), such network outages may be located on a per meter basis.


One of the most beneficial advantages of an IP-based power management system, as provided in one embodiment of the present invention, is accurate reporting of the actual amount of power saved by each customer on an individual basis. Embodiments of the present invention monitor and calculate precisely how many kilowatts (or carbon credits) are being generated or saved per customer instead of merely providing an estimate. Furthermore, embodiments of the present invention provide means for tracking the actual amount of deferred load and pollutants according to generation mix, serving utility or electric power grid operator(s) and geographic area.


Embodiments of the present invention include an exemplary system for supporting a serving utility or power distributor (e.g., such as a municipality, electric cooperative, or any other wholesale or retail producer of electric power), or electric power grid operator(s), methods for providing continuous, real time active power control in the system, and a method for determining how much actual load may be controlled at any given time for the purposes of conservation, alternative power generation and the creation of carbon (and other gaseous emissions) credits, wherein the power is controlled at a plurality of power consuming devices that are operated by at least one customer of the at least one electric power utility, grid operator, micro-grid operator, or other market participant as defined by the governing agency that oversees grid operations (i.e. NERC, FERC, Independent System Operator etc.).


Additional embodiments of the present invention provide a system that implements the exemplary methods through the unique use of load information, location of customers consuming electricity, changes in state of controlled devices, current sensing, customer set points/preferences and artificial intelligence (e.g., as implemented through software) to optimize the presentation of load available to the serving utility or electric power grid operator(s) for control.


Generally, the embodiments disclosed in the present invention are directed towards the real time (active) control of residential and commercial electrical devices that generally are 240V or less. However, specific features and functions may also be applicable to larger commercial installations that are greater than 240V. The description herein is intended to provide a practical implementation of real time load management for either voluntary or involuntary participants over large geographies and ideally for many serving electrical power producers, wholesalers or distributors. The exemplary methods and systems disclosed in the present invention may be implemented by an individual utility provider, or a third party monitoring service that tracks and manages power loading for one or more utilities. This application describes the necessary methods and generally describes software subsystems for both a host function (e.g., an active load director (ALD) server) and a companion active load client (ALC).


One embodiment of the present invention controls power distribution for a variety of electric utility companies by actively monitoring the amount of power needed by each utility and supplying the required power by redirecting power from participating customers. In this embodiment, customers agree to allow the power management system to disable certain power-consuming devices during peak loading times of the day. Smart breakers, which have the ability to be switched on or off remotely, are installed for specific devices in an electric service control panel accessed by a known IP address. Alternatively, IP-addressable smart appliances may be used. The power management system determines the amount of steady-state power each device consumes when turned on and logs the information in a database for each subscriber. For example, a current sensor on each smart appliance or within each smart breaker may measure the amount of current consumed by each monitored device. An active load client then multiplies the amount of current consumed by the operating voltage of the device to obtain the power consumption, and transmits the power consumption to the ALD server. When the serving utility needs more power than it is currently able to supply, the power load management system automatically adjusts the power distribution by turning off specific loads on an individual subscriber basis. Because the amount of power consumed by each specific load is known, the system can determine precisely which loads to turn off and tracks the power savings generated by each customer as a result of this short-term outage.


Furthermore, based upon the reduction in consumed power, the systems and methods of the present invention provide for generating at the control center a power supply value (PSV) corresponding to the reduction in consumed power by the power consuming device(s). Importantly, the PSV is an actual value that includes measurement and verification of the reduction in consumed power; such measurement and verification methods may be determined by the appropriate governing body or authority for the electric power grid(s). Power Supply Value (PSV) is calculated at the meter or submeter or at building control system or at any device or controller that measures power within the standard as supplied by the regulatory body(ies) that govern the regulation of the grid. PSV variations may depend on operating tolerances, operating standard for accuracy of the measurement. The PSV enables transformation of curtailment or reduction in power at the device level by any system that sends or receives an IP message to be related to or equated to supply as presented to the governing entity that accepts these values and award supply equivalence, for example of a power generating entity or an entity allowed to control power consuming devices as permitted by the governing body of the electric power grid, e.g., FERC, NERC, etc.


PSV may be provided in units of electrical power flow, monetary equivalent, and combinations thereof. Thus, the PSV provides an actual value that is confirmed by measurement and/or verification, thereby providing for a curtailment value as a requirement for providing supply to the power grid, wherein the supply to the power electric power grid is provided for grid stability, voltage stability, reliability, and combinations thereof, and is further provided as responsive to an energy management system or equivalent for providing grid stability, reliability, frequency as determined by governing authority for the electric power grid and/or grid operator(s).


The present invention can be more readily understood with reference to FIGS. 1-8, in which like reference numerals designate like items. FIG. 1 depicts an exemplary IP-based active power load management system 10 in accordance with one embodiment of the present invention. The exemplary power management system 10 monitors and manages power distribution via an active load director (ALD) server 100 connected between one or more utility control centers (UCCs) 200 (one shown) and one or more active load clients (ALCs) 300 (one shown). The ALD server 100 may communicate with the utility control center 200 and each active load client 300 either directly or through a network 80 using the Internet Protocol (IP) or any other connection-based protocols. For example, the ALD server 100 may communicate using RF systems operating via one or more base stations 90 (one shown) using one or more wireless communication protocols, such as Global System for Mobile communications (GSM), Enhanced Data GSM Environment (EDGE), High Speed Packet Access (HSDPA), Time Division Multiple Access (TDMA), or Code Division Multiple Access data standards, including CDMA 2000, CDMA Revision A, and CDMA Revision B. Alternatively, or additionally, the ALD server 100 may communicate via a digital subscriber line (DSL) capable connection, cable television based IP capable connection, or any combination thereof. In the exemplary embodiment shown in FIG. 1, the ALD server 100 communicates with one or more active load clients 300 using a combination of traditional IP-based communication (e.g., over a trunked line) to a base station 90 and a wireless channel implementing the WiMax protocol for the “last mile” from the base station 90 to the active load client 300.


Each active load client 300 is accessible through a specified address (e.g., IP address) and controls and monitors the state of individual smart breaker modules or intelligent appliances 60 installed in the business or residence 20 to which the active load client 300 is associated (e.g., connected or supporting). Each active load client 300 is associated with a single residential or commercial customer. In one embodiment, the active load client 300 communicates with a residential load center 400 that contains smart breaker modules, which are able to switch from an “ON” (active) state to an “OFF” (inactive), and vice versa, responsive to signaling from the active load client 300. Smart breaker modules may include, for example, smart breaker panels manufactured by Schneider Electric SA under the trademark “Square D” or Eaton Corporation under the trademark “Cutler-Hammer” for installation during new construction. For retro-fitting existing buildings, smart breakers having means for individual identification and control may be used. Typically, each smart breaker controls a single appliance (e.g., a washer/dryer 30, a hot water heater 40, an HVAC unit 50, or a pool pump 70).


Additionally, the active load client 300 may control individual smart appliances directly (e.g., without communicating with the residential load center 300) via one or more of a variety of known communication protocols (e.g., IP, Broadband over PowerLine (BPL) in its various forms, including through specifications promulgated or being developed by the HOMEPLUG Powerline Alliance and the IEEE, Ethernet, Bluetooth, ZigBee, Wi-Fi, WiMax, etc.). Typically, a smart appliance 60 includes a power control module (not shown) having communication abilities. The power control module is installed in-line with the power supply to the appliance, between the actual appliance and the power source (e.g., the power control module is plugged into a power outlet at the home or business and the power cord for the appliance is plugged into the power control module). Thus, when the power control module receives a command to turn off the appliance 60, it disconnects the actual power supplying the appliance 60. Alternatively, a smart appliance 60 may include a power control module integrated directly into the appliance, which may receive commands and control the operation of the appliance directly (e.g., a smart thermostat may perform such functions as raising or lowering the set temperature, switching an HVAC unit on or off, or switching a fan on or off).


Referring now to FIG. 2, the ALD server 100 may serve as the primary interface to customers, as well as to service personnel. In the exemplary embodiment depicted in FIG. 2, the ALD server 100 includes a utility control center (UCC) security interface 102, a UCC command processor 104, a master event manager 106, an ALC manager 108, an ALC security interface 110, an ALC interface 112, a web browser interface 114, a customer sign-up application 116, customer personal settings 138, a customer reports application 118, a power savings application 120, an ALC diagnostic manager 122, an ALD database 124, a service dispatch manager 126, a trouble ticket generator 128, a call center manager 130, a carbon savings application 132, a utility P & C database 134, a read meter application 136, and a security device manager 140.


Using the web browser interface 114, in one embodiment, customers interact with the ALD server 100 and subscribe to some or all of the services offered by the power load management system 10 via a customer sign-up application 116. In accordance with the customer sign-up application 116, the customer specifies customer personal settings 138 that contain information relating to the customer and the customer's residence or business, and defines the extent of service to which the customer wishes to subscribe. Additional details of the customer sign-up application 116 are discussed below. Customers may also use the web browser interface 114 to access and modify information pertaining to their existing accounts.


The ALD server 100 also includes a UCC security interface 102 which provides security and encryption between the ALD server 100 and a utility company's control center 200 to ensure that no third party is able to provide unauthorized directions to the ALD server 100. A UCC command processor 104 receives and sends messages between the ALD server 100 and the utility control center 200. Similarly, an ALC security interface 110 provides security and encryption between the ALD server 100 and each active load client 300 on the system 10, ensuring that no third parties can send directions to, or receive information from, the active load client 300. The security techniques employed by the ALC security interface 110 and the UCC security interface 102 may include conventional symmetric key or asymmetric key algorithms, such as Wireless Encryption Protocol (WEP), Wi-Fi Protected Access (WPA and WPA2), Advanced Encryption Standard (AES), Pretty Good Privacy (PGP), or proprietary encryption techniques.


In one embodiment, the commands that can be received by the UCC command processor 104 from the electric utility's control center 200 include a “Cut” command, a “How Much” command, an “End Event” command, and a “Read Meters” command. The “Cut” command instructs the ALD server 100 to reduce a specified amount of power for a specified amount of time. The specified amount of power may be an instantaneous amount of power or an average amount of power consumed per unit of time. The “Cut” command may also optionally indicate general geographic areas or specific locations for power load reduction. The “How Much” command requests information for the amount of power (e.g., in megawatts) that can be reduced by the requesting utility control center 200. The “End Event” command stops the present ALD server 100 transaction. The “Read Meters” command instructs the ALD server 100 to read the meters for all customers serviced by the requesting utility.


The UCC command processor 104 may send a response to a “How Much” command or an “Event Ended” status confirmation to a utility control center 200. A response to a “How Much” command returns an amount of power that can be cut. An “Event Ended” acknowledgement message confirms that the present ALD server transaction has ended.


The master event manager 106 maintains the overall status of the power load activities controlled by the power management system 10. The master event manager 106 maintains a separate state for each utility that is controlled and tracks the current power usage within each utility. The master event manager 106 also tracks the management condition of each utility (e.g., whether or not each utility is currently being managed). The master event manager 106 receives instructions in the form of transaction requests from the UCC command processor 104 and routes instructions to components necessary to complete the requested transaction, such as the ALC manager 108 and the power savings application 120.


The ALC manager 108 routes instructions between the ALD server 100 and each active load client 300 within the system 10 through an ALC interface 112. For instance, the ALC manager 108 tracks the state of every active load client 300 serviced by specified utilities by communicating with the active load client 300 through an individual IP address. The ALC interface 112 translates instructions (e.g., transactions) received from the ALC manager 108 into the proper message structure understood by the targeted active load client 300 and then sends the message to the active load client 300. Likewise, when the ALC interface 112 receives messages from an active load client 300, it translates the message into a form understood by the ALC manager 108 and routes the translated message to the ALC manager 108.


The ALC manager 108 receives from each active load client 300 that it services, either periodically or responsive to polling messages sent by the ALC manager 108, messages containing the present power consumption and the status (e.g., “ON” or “OFF”) of each device controlled by the active load client 300. Alternatively, if individual device metering is not available, then the total power consumption and load management status for the entire active load client 300 may be reported. The information contained in each status message is stored in the ALD database 124 in a record associated with the specified active load client 300. The ALD database 124 contains all the information necessary to manage every customer account and power distribution. In one embodiment, the ALD database 124 contains customer contact information, such as names, addresses, phone numbers, email addresses, and associated utility companies for all customers having active load clients 300 installed at their residences or businesses, as well as a description of specific operating instructions for each managed device (e.g., IP-addressable smart breaker or appliance), device status, and device diagnostic history.


There are several types of messages that the ALC manager 108 may receive from an active load client 300 and process accordingly. One such message is a security alert message. A security alert message originates from an optional security or safety monitoring system installed in the residence or business and coupled to the active load client 300 (e.g., wirelessly or via a wired connection). When a security alert message is received, the ALC manager 108 accesses the ALD database 124 to obtain routing information for determining where to send the alert, and then sends the alert as directed. For example, the ALD manager 108 may be programmed to send the alert or another message (e.g., an electronic mail message or a pre-recorded voice message) to a security monitoring service company and/or the owner of the residence or business.


Another message communicated between an active load client 300 and the ALC manager 108 is a report trigger message. A report trigger message alerts the ALD server 100 that a predetermined amount of power has been consumed by a specific device monitored by an active load client 300. When a report trigger message is received from an active load client 300, the ALC manager 108 logs the information contained in the message in the ALD database 124 for the customer associated with the information-supplying active load client 300. The power consumption information is then used by the ALC manager 108 to determine the active load client(s) 300 to which to send a power reduction or “Cut” message during a power reduction event.


Yet another message exchanged between an active load client 300 and the ALC manager 108 is a status response message. A status response message reports the type and status of each device controlled by the active load client 300 to the ALD server 100. When a status response message is received from an active load client 300, the ALC manager 108 logs the information contained in the message in the ALD database 124.


In one embodiment, upon receiving instructions (e.g., a “Cut” instruction) from the master event manager 106 to reduce power consumption for a specified utility, the ALC manager 108 determines which active load clients 300 and/or individually controlled devices to switch to the “OFF” state based upon present power consumption data stored in the ALD database 124. The ALC manager 108 then sends a message to each selected active load client 300 containing instructions to turn off all or some of the devices under the active load client's control.


In another embodiment, a power savings application 120 may be optionally included to calculate the total amount of power saved by each utility during a power reduction event (referred to herein as a “Cut event”), as well as the amount of power saved for each customer whose active load client 300 reduced the amount of power delivered. The power savings application 120 accesses the data stored in the ALD database 124 for each customer serviced by a particular utility and stores the total cumulative power savings (e.g., in megawatts per hour) accumulated by each utility for each Cut event in which the utility participated as an entry in the utility Power and Carbon (“P&C”) database 134.


In a further embodiment, an optional carbon savings application 132 uses the information produced by the power savings application 120 to determine the amount of carbon saved by each utility and by each customer for every Cut event. Carbon savings information (e.g., type of fuel that was used to generate power for the customer set that was included in the just completed event, power saved in the prior event, governmental standard calculation rates, and/or other data, such as generation mix per serving utility and geography of the customer's location and the location of the nearest power source) is stored in the ALD database 124 for each active load client 300 (customer) and in the utility P&C database 134 for each utility. The carbon savings application 132 calculates the total equivalent carbon credits saved for each active load client 300 (customer) and utility participating in the previous Cut event, and stores the information in the ALD database 124 and the utility P&C database 134, respectively.


Additionally, the ALC manager 108 automatically provides for smooth operation of the entire power load management system 10 by optionally interacting with a service dispatch manager 126. For example, when a new customer subscribes to participate in the power load management system 10, the service dispatch manager 126 is notified of the new subscription from the customer sign-up application 116. The service dispatch manager 126 then sends an activation request to the ALC manager 108. Upon receiving the activation request from the service dispatch manager 126, the ALC manager 108 may sends a query request for information to the new active load client 300 and, upon receipt of the information, provides it to the service dispatch manager 126. Additionally, if at any time the ALC manager 108 detects that a particular active load client 300 is not functioning properly, the ALC manager 108 may send a request for service to the service dispatch manager 126 to arrange for a service call to correct the problem.


In another embodiment, the service dispatch manager 126 may also receive requests for service from a call center manager 130 that provides support to an operations center (not shown), which receives telephone calls from customers of the power load management system 10. When a customer calls the operations center to request service, the call center manager 130 logs the service call in the ALD database 124 and sends a “Service” transaction message to the service dispatch manager 126. When the service call has been completed, the call center manager 130 receives a completed notification from the service dispatch manager 126 and records the original service call as “closed” in the ALD database 124.


In yet another embodiment, the service dispatch manager 126 may also instruct an ALC diagnostic manager 122 to perform a series of diagnostic tests for any active load client 300 for which the service dispatch manager 126 has received a service request. After the ALC diagnostic manager 122 has performed the diagnostic procedure, it returns the results to the service dispatch manager 126. The service dispatch manager 126 then invokes a trouble ticket generator 128 to produce a report (e.g., trouble ticket) that includes information (some of which was retrieved by the service dispatch manager 126 from the ALD database 124) pertaining to the required service (e.g., customer name, address, any special consideration for accessing the necessary equipment, and the results of the diagnostic process). A residential customer service technician may then use the information provided in the trouble ticket to select the type of equipment and replacement parts necessary for performing a service call.


A read meter application 136 may be optionally invoked when the UCC command processor 104 receives a “Read Meters” or equivalent command from the utility control center 200. The read meter application 136 cycles through the ALD database 124 and sends a read meter message or command to each active load client 300, or those active load clients 300 specifically identified in the UCC's command, via the ALC manager 108. The information received by the ALC manager 108 from the active load client 300 is logged in the ALD database 124 for each customer. When all the active load client meter information has been received, the information is sent to the requesting utility control center 200 using a business to business (e.g., ebXML) or other desired protocol.


The optional security device management block 140 includes program instructions for handling security system messages received by the security interface 110. The security device management block 140 includes routing information for all security system messages and may further include messaging options on a per customer or service company basis. For example, one security service may require an email alert from the ALD server 100 upon the occurrence of a security event; whereas, another security service may require that the message sent from the in-building system be passed on by the active load client 300 and the ALD server 100 directly to the security service company.


In a further embodiment, the ALD server 100 also includes a customer reports application 118 that generates reports to be sent to individual customers detailing the amount of power saved during a previous billing cycle. Each report may contain a cumulative total of power savings over the prior billing cycle, details of the amount of power saved per controlled device (e.g., breaker or appliance), power savings from utility directed events, power savings from customer directed events, devices being managed, total carbon equivalents used and saved during the period, and/or specific details for each Cut event in which the customer's active load client 300 participated. Customers may also receive incentives and awards for participation in the power load management system 10 through a customer rewards program 150. For example, the utilities or a third party system operator may enter into agreements with product and/or service providers to offer system participants discounts on products and services offered by the providers based upon certain participation levels or milestones. The rewards program 150 may be setup in a manner similar to conventional frequent flyer programs in which points are accumulated for power saved (e.g., one point for each megawatt saved or deferred) and, upon accumulation of predetermined levels of points, the customer can select a product or service discount. Alternatively, a serving utility may offer a customer a rate discount for participating in the system 10.



FIG. 3 illustrates a block diagram of an exemplary active load client 300 in accordance with one embodiment of the present invention. The depicted active load client 300 includes a Linux-based operating system 302, a status response generator 304, a smart breaker module controller 306, a smart device interface 324, a communications interface 308, a security interface 310, an IP-based communication converter 312, a device control manager 314, a smart breaker (B1-BN) counter manager 316, a report trigger application 318, an IP router 320, a smart meter interface 322, a security device interface 328, and an IP device interface 330. The active load client 300, in this embodiment, is a computer or processor-based system located on-site at a customer's residence or business. The primary function of the active load client 300 is to manage the power load levels of controllable devices located at the residence or business, which the active load client 300 oversees on behalf of the customer. In an exemplary embodiment, the software running on the active load client 300 operates using the Linux embedded operating system 302 to manage the hardware and the general software environment. One skilled in the art will readily recognize that other operating systems, such as Microsoft's family of operating systems, Mac OS, and Sun OS, among others, may be alternatively used. Additionally, the active load client 300 may include DHCP client functionality to enable the active load client 300 to dynamically request IP addresses for itself and/or one or more controllable devices 402-412, 420, 460 managed thereby from a DHCP server on the host IP network facilitating communications between the active load client 300 and the ALD server 100. The active load client 300 may further include router functionality and maintain a routing table of assigned IP addresses in a memory of the active load client 300 to facilitate delivery of messages from the active load client 300 to the controllable devices 402-412, 420, 460.


A communications interface 308 facilitates connectivity between the active load client 300 and the ALD server 100. Communication between the active load client 300 and the ALD server 100 may be based on any type of IP or other connection protocol, including but not limited to, the WiMax protocol. Thus, the communications interface 308 may be a wired or wireless modem, a wireless access point, or other appropriate interface.


A standard IP Layer-3 router 320 routes messages received by the communications interface 308 to both the active load client 300 and to any other locally connected device 440. The router 320 determines if a received message is directed to the active load client 300 and, if so, passes the message to a security interface 310 to be decrypted. The security interface 310 provides protection for the contents of the messages exchanged between the ALD server 100 and the active load client 300. The message content is encrypted and decrypted by the security interface 310 using, for example, a symmetric encryption key composed of a combination of the IP address and GPS data for the active load client 300 or any other combination of known information. If the message is not directed to the active load client 300, then it is passed to the IP device interface 330 for delivery to one or more locally connected devices 440. For example, the IP router 320 may be programmed to route power load management system messages as well as conventional Internet messages. In such a case, the active load client 300 may function as a gateway for Internet service supplied to the residence or business instead of using separate Internet gateways or routers.


An IP based communication converter 312 opens incoming messages from the ALD server 100 and directs them to the appropriate function within the active load client 300. The converter 312 also receives messages from various active load client 300 functions (e.g., a device control manager 314, a status response generator 304, and a report trigger application 318), packages the messages in the form expected by the ALD server 100, and then passes them on to the security interface 310 for encryption.


The device control manager 314 processes power management commands for various controllable devices logically connected to the active load client 300. The devices can be either smart breakers 402-412 or other IP based devices 420, such as smart appliances with individual control modules (not shown). The device control manager 314 also processes “Query Request” or equivalent commands or messages from the ALD server 100 by querying a status response generator 304 which maintains the type and status of each device controlled by the active load client 300, and providing the statuses to the ALD server 100. The “Query Request” message may include information other than mere status requests, such as temperature set points for thermally controlled devices, time intervals during which load control is permitted or prohibited, dates during which load control is permitted or prohibited, and priorities of device control (e.g., during a power reduction event, hot water heater and pool pump are turned off before HVAC unit is turned off). If temperature set points or other non-status information are included in a “Query Request” message and there is a device attached to the active load client 300 that can process the information, the temperature set points or other information are sent to that device 420 via a smart device interface 324.


The status response generator 304 receives status messages from the ALD server 100 and, responsive thereto, polls each controllable device 402-412, 420, 460 under the active load client's control to determine whether the controllable device 402-412, 420, 460 is active and in good operational order. Each controllable device 402-412, 420, 460 responds to the polls with operational information (e.g., activity status and/or error reports) in a status response message. The active load client 300 stores the status responses in a memory associated with the status response generator 304 for reference in connection with power reduction events.


The smart device interface 324 facilitates IP or other address-based communications to individual devices 420 (e.g., smart appliance power control modules) that are attached to the active load client 300. The connectivity can be through one of several different types of networks, including but not limited to, BPL, ZigBee, Wi-Fi, Bluetooth, or direct Ethernet communications. Thus, the smart device interface 324 is a modem adapted for use in or on the network connecting the smart devices 420 to the active load client 300. The smart device interface 324 also allows the device control manager 314 to manage those devices that have the capability to sense temperature settings and respond to temperature variations.


The smart breaker module controller 306 formats, sends, and receives messages, including power control instructions, to and from the smart breaker module 400. In one embodiment, the communications is preferably through a BPL connection. In such embodiment, the smart breaker module controller 306 includes a BPL modem and operations software. The smart breaker module 400 contains individual smart breakers 402-412, wherein each smart breaker 402-412 includes an applicable modem (e.g., a BPL modem when BPL is the networking technology employed) and is preferably in-line with power supplied to a single appliance or other device. The B1-BN counter manager 316 determines and stores real time power usage for each installed smart breaker 402-412. For example, the counter manager 316 tracks or counts the amount of power used by each smart breaker 402-412 and stores the counted amounts of power in a memory of the active load client 300 associated with the counter manager 316. When the counter for any breaker 402-412 reaches a predetermined limit, the counter manager 316 provides an identification number corresponding to the smart breaker 402-412 and the corresponding amount of power (power number) to the report trigger application 318. Once the information is passed to the report trigger application 318, the counter manager 316 resets the counter for the applicable breaker 402-412 to zero so that information can once again be collected. The report trigger application 318 then creates a reporting message containing identification information for the active load client 300, identification information for the particular smart breaker 402-412, and the power number, and sends the report to the IP based communication converter 312 for transmission to the ALD server 100.


The smart meter interface 322 manages either smart meters 460 that communicate using BPL or a current sensor 452 connected to a traditional power meter 450. When the active load client 300 receives a “Read Meters” command or message from the ALD server 100 and a smart meter 460 is attached to the active load client 300, a “Read Meters” command is sent to the meter 460 via the smart meter interface 322 (e.g., a BPL modem). The smart meter interface 322 receives a reply to the “Read Meters” message from the smart meter 460, formats this information along with identification information for the active load client 300, and provides the formatted message to the IP based communication converter 312 for transmission to the ALD server 100.


A security device interface 328 transfers security messages to and from any attached security device. For example, the security device interface 328 may be coupled by wire or wirelessly to a monitoring or security system that includes motion sensors, mechanical sensors, optical sensors, electrical sensors, smoke detectors, carbon monoxide detectors, and/or other safety and security monitoring devices. When the monitoring system detects a security or safety problem (e.g., break-in, fire, excessive carbon monoxide levels), the monitoring system sends its alarm signal to the security interface 328, which in turn forwards the alarm signal to the IP network through the ALD server 100 for delivery to the target IP address (e.g., the security monitoring service provider). The security device interface 328 may also be capable of communicating with the attached security device through the IP device interface to recognize a notification message from the device that it has lost its line based telephone connection. Once that notification has been received, an alert message is formatted and sent to the ALD server 100 through the IP based communication converter 312.


Operation of the power management system 10 in accordance with exemplary embodiments will now be described. In one embodiment, customers initially sign up for power load management services using a web browser. Using the web browser, the customer accesses a power management system provider's website through the web browser interface 114 and provides his or her name and address information, as well as the type of equipment he or she would like to have controlled by the power load management system 10 to save energy at peak load times and to accumulate power savings or carbon credits (which may be used to receive reward incentives based upon the total amount of power or carbon saved by the customer). The customer may also agree to allow management of power consumption during non-peak times to sell back excess power to the utility, while simultaneously accumulating power savings or carbon credits.


The customer sign up application 116 creates a database entry for each customer in the ALD database 124. Each customer's contact information and load management preferences are stored or logged in the database 124. For example, the customer may be given several simple options for managing any number of devices or class of devices, including parameters for managing the devices (e.g., how long each type of device may be switched off and/or define hours when the devices may not be switched off at all). In particular, the customer may also be able to provide specific parameters for HVAC operations (e.g., set control points for the HVAC system specifying both the low and high temperature ranges). Additionally, the customer may be given an option of receiving a notification (e.g., an email message, Instant Message, Text Message, or recorded phone call, or any combination thereof) when a power management event occurs. When the customer completes entering data, a “New Service” or equivalent transaction message or command is sent to the service dispatch manager 126.



FIG. 4 illustrates an exemplary operational flow diagram 500 providing steps executed by the ALD server 100 (e.g., as part of the service dispatch manager 126) to manage service requests in the exemplary power load management system 10, in accordance with one embodiment of the present invention. The steps of FIG. 4 are preferably implemented as a set of computer instructions (software) stored in a memory (not shown) of the ALD server 100 and executed by one or more processors (not shown) of the ALD server 100. Pursuant to the logic flow, the service dispatch manager 126 receives (502) a transaction message or command and determines (503) the type of transaction. Upon receiving a “New Service” transaction message, the service dispatch manager 126 schedules (504) a service person (e.g., technician) to make an initial installation visit to the new customer. The service dispatch manager 126 then notifies (506) the scheduled service person, or dispatcher of service personnel, of an awaiting service call using, for example, email, text messaging, and/or instant messaging notifications.


In one embodiment, responsive to the service call notification, the service person obtains the new customer's name and address, a description of the desired service, and a service time from a service dispatch manager service log. The service person obtains an active load client 300, all necessary smart breaker modules 402-412, and all necessary smart switches to install at the customer location. The service person notes any missing information from the customer's database information (e.g., the devices being controlled, type make and model of each device, and any other information the system will need to function correctly). The service person installs the active load client 300 and smart breakers 402-412 at the new customer's location. A global positioning satellite (GPS) device may optionally be used by the service person to determine an accurate geographic location of the new customer building, which will be added to the customer's entry in the ALD database 124 and may be used to create a symmetric encryption key to facilitate secure communications between the ALD server 100 and the active load client 300. The physical location of the installed active load client 300 is also entered into the customer's entry. Smart switch devices may be installed by the service person or left at the customer location for installation by the customer. After the active load client 300 has been installed, the service dispatch manager 126 receives (508) a report from the service person, via a service log, indicating that the installation is complete. The service dispatch manager 126 then sends (510) an “Update” or equivalent transaction message to the ALC manager 108.


Returning to block 503, when a “Service” or similar transaction message or command is received, the service dispatch manager 126 schedules (512) a service person to make a service call to the specified customer. The service dispatch manager 126 then sends (514) a “Diagnose” or similar transaction to the ALC diagnostic manager 122. The ALC diagnostic manager 122 returns the results of the diagnostic procedure to the service dispatch manager 126, which then notifies (516) the service person of the service call and provides him or her with the results of the diagnostic procedure using a conventional trouble ticket. The service person uses the diagnostic procedure results in the trouble ticket to select the type of equipment and replacement parts necessary for the service call.



FIG. 5 illustrates an exemplary operational flow diagram 600 providing steps executed by the ALD server 100 (e.g., as part of the ALC manager 108) to confirm customer sign-up to the power load management system 10, in accordance with one embodiment of the present invention. The steps of FIG. 5 are preferably implemented as a set of computer instructions (software) stored in a memory (not shown) of the ALD server 100 and executed by one or more processors (not shown) of the ALD server 100. In accordance with the logic flow, the ALC manager 108 receives (602) an “Update” or similar transaction message or command from the service dispatch manager 126 and uses the IP address specified in the “Update” message to send (604) out a “Query Request” or similar message or command to the active load client 300. The “Query Request” message includes a list of devices the ALD server 100 expects to be managed. If the customer information input at customer sign-up includes temperature set points for one or more load-controllable devices, that information is included in the “Query Request” message. The ALC manager 108 receives (606) a query reply containing information about the active load client 300 (e.g., current WiMax band being used, operational state (e.g., functioning or not), setting of all the counters for measuring current usage (e.g., all are set to zero at initial set up time), status of devices being controlled (e.g., either switched to the “on” state or “off” state)). The ALC manager 108 updates (608) the ALD database 124 with the latest status information obtained from the active load client 300. If the ALC manager 108 detects (610), from the query reply, that the active load client 300 is functioning properly, it sets (612) the customer state to “active” to allow participation in ALD server activities. However, if the ALC manager 108 detects (610) that the active load client 300 is not functioning properly, it sends (614) a “Service” or similar transaction message or command to the service dispatch manager 126.



FIG. 6 illustrates an exemplary operational flow diagram 700 providing steps executed by the ALD server 100 (e.g., as part of the master event manager 106) to manage events in the exemplary power load management system 10, in accordance with one embodiment of the present invention. The steps of FIG. 6 are preferably implemented as a set of computer instructions (software) stored in a memory (not shown) of the ALD server 100 and executed by one or more processors (not shown) of the ALD server 100. Pursuant to the logic flow, the master event manager 106 tracks (702) current power usage within each utility being managed by the ALD server 100. When the master event manager 106 receives (704) a transaction message or command from the UCC command processor 104 or the ALC manager 108, the master event manager 106 determines (706) the type of transaction received. Upon receiving a “Cut” transaction from the UCC command processor 104 (resulting from a “Cut” command issued by the utility control center 200), the master event manager 106 places (708) the utility in a managed logical state. The master event manager then sends (710) a “Cut” transaction or event message or command to the ALC manager 108 identifying the amount of power (e.g., in megawatts) that must be removed from the power system supplied by the utility. The amount of power specified for reduction in a “Cut” command may be an instantaneous amount of power or an average amount of power per unit time. Finally, the master event manager 106 notifies (711) every customer that has chosen to receive a notification (e.g., through transmission of an email or other pre-established notification technique) that a power management event is in process.


Returning to block 706, when the master event manager 106 receives a “How Much” or other equivalent power inquiry transaction message or command from the UCC command processor 104 (resulting from a “How Much” or equivalent power inquiry command issued by the utility control center 200), the master event manager 106 determines (712) the amount of power that may be temporarily removed from a particular utility's managed system by accessing the current usage information for that utility. The current usage information is derived, in one embodiment, by aggregating the total available load for the serving utility, as determined from the customer usage information for the utility stored in the ALD database 124, based on the total amount of power that may have to be supplied to the utility's customers in view of the statuses of each of the active load clients 300 and their respectively controllable load devices 402-412, 420, 460 during the load control interval identified in the “How Much” message.


Each utility may indicate a maximum amount of power or maximum percentage of power to be reduced during any power reduction event. Such maximums or limits may be stored in the utility P&C database 134 of the ALD server 100 and downloaded to the master event manager 106. In one embodiment, the master event manager 106 is programmed to remove a default one percent (1%) of the utility's current power consumption during any particular power management period (e.g., one hour). In alternative embodiments, the master event manager 106 may be programmed to remove other fixed percentages of current power consumption or varying percentages of current power consumption based on the current power consumption (e.g., 1% when power consumption is at system maximum and 10% when power consumption is at only 50% of system maximum). Based on the amount of power to be removed, the master event manager 106 sends (710) a “Cut” or equivalent event message to the ALC manager 108 indicating the amount of power (e.g., in megawatts) that must be removed from the utility's power system (e.g., 1% of the current usage), and notifies (711) all customers that have chosen to receive a notification that a power management event is in process. The master event manager 106 also sends a response to the utility control center 200 via the UCC command processor 104 advising the utility control center 200 as to the quantity of power that can be temporarily reduced by the requesting utility.


Returning once again to block 706, when the master event manager 106 receives an “End Event” or equivalent transaction message or command from the UCC command processor 104 (resulting from an “End Event” command issued by the utility control center 200), the master event manager 106 sets (714) the state of the current event as “Pending” and sends (716) an “End Event” or equivalent transaction message or command to the ALC manager 108. When the ALC manager 108 has performed the steps necessary to end the present event (e.g., a power reduction or Cut event), the master event manager 106 receives (718) an “Event Ended” or equivalent transaction from the ALC manager 108 and sets (720) the utility to a logical “Not Managed” state. The master event manager 106 then notifies (722) each customer that has chosen to receive a notification (e.g., through transmission of an email or other pre-established notification mechanism) that the power management event has ended. Finally, the master event manager 106 sends an “Event Ended” or equivalent transaction message or command to the power savings application 120 and the utility control center 200 (via the UCC command processor 104).


Turning now to FIG. 7, exemplary operational flow diagram 800 illustrates steps executed by the ALD server 100 (e.g., as part of the ALC manager 108) to manage power consumption in the exemplary power load management system 10, in accordance with one embodiment of the present invention. The steps of FIG. 7 are preferably implemented as a set of computer instructions (software) stored in a memory of the ALD server 100 and executed by one or more processors of the ALD server 100. In accordance with the logic flow, the ALC manager 108 tracks (802) the state of each managed active load client 300 by receiving messages, periodically or responsive to polls issued by the ALC manager 108, from every active load client 300 that the ALC manager 108 manages. These messages indicate the present states of the active load clients 300. The state includes the present consumption of power for each controllable device 402-412, 420 controlled by the active load client 300 (or the total power consumption for all controllable devices 402-412, 420 controlled by the active load client 300 if individual device metering is not available) and the status of each device 402-412, 420 (e.g., either “Off” or “On”). The ALC manager 108 stores or logs (804) the power consumption and device status information in the ALD database 124 in a record corresponding to the specified active load client 300 and its associated customer and serving utility.


When the ALC manager 108 receives (806) a transaction message from the master event manager 106, the ALC manager 108 first determines (808) the type of transaction received. If the ALC manager 108 receives a “Cut” or equivalent transaction message or command from the master event manager 106, the ALC manager 108 enters (810) a “Manage” logical state. The ALC manager 108 then determines (812) which active load clients 300 and associated devices 402-412, 420 operating on the utility specified in the “Cut” message to switch to the “Off” state. If a location (e.g., list of GPS coordinates, a GPS coordinate range, a geographic area, or a power grid reference area) is included in the “Cut” transaction message, only those active load clients 300 within the specified location are selected for switching to the “Off” state. In other words, the ALC manager 108 selects the group of active load client devices 300 to which the issue a “Turn Off” transaction message based at least partially on the geographic location of each active load client 300 as such location relates to any location identified in the received “Cut” transaction message. The ALD database 124 contains information on the present power consumption (and/or the average power consumption) for each controllable device 402-412, 420 connected to each active load client 300 in the system 10. The ALC manager 108 utilizes the stored power consumption information to determine how many, and to select which, devices 402-412, 420 to turn off to achieve the power reduction required by the “Cut” message. The ALC manager 108 then sends (814) a “Turn Off” or equivalent transaction message or command to each active load client 300, along with a list of the devices to be turned off and a “change state to off” indication for each device 402-412, 420 in the list. The ALC manager 108 then logs (816) the amount of power (either actual or average), as determined from the ALD database 124, saved for each active load client 300, along with a time stamp indicating when the power was reduced. The ALC manager 108 then schedules (818) transactions for itself to “Turn On” each turned-off device after a predetermined period of time (e.g., which may have been set from a utility specified default, set by instructions from the customer, or otherwise programmed into the ALC manager 108).


Returning back to block 808, when the ALC manager 108 receives a “Turn On” or equivalent transaction message or command from the master event manager 106 for a specified active load client 300, and the ALC manager's state is currently in a “Manage” state, the ALC manager 108 finds (820) one or more active load clients 300 that are in the “On” state and do not have any of their managed devices 402-412, 420 turned off (and are in the specified location if so required by the original “Cut” transaction message), which, when one or more of such devices 402-412, 420 are turned off, will save the same or substantially the same amount of power that is presently being saved by the specified active load clients that are in the “Off” state. Upon identifying new active load clients 300 from which to save power, the ALC manager 108 sends (822) a “Turn Off” or equivalent transaction message or command to each active load client 300 that must be turned off in order to save the same amount of power as the active load client(s) to be turned on (i.e. to have its or their managed devices 402-412, 420 turned on) or to save an otherwise acceptable amount of power (e.g., a portion of the power previously saved by the active load client(s) to be turned back on). The ALC manager 108 also sends (824) a “Turn On” or equivalent transaction message or command to each active load client 300 to be turned back on. The “Turn On” message instructs all active load clients 300 to which the message was directed to turn on any controllable devices that have been turned off, and causes the affected active load clients 300 to instruct their controllable devices 402-412, 420 to enable the flow of electric power to their associated power consuming devices (e.g., appliance, HVAC unit, and so forth). Finally, the ALC manager 108 logs (826) the time that the “Turn On” transaction message is sent in the ALD database 124.


Returning once again to block 808, when the ALC manager 108 receives an “End Event” or equivalent transaction message or command from the master event manager 106, the ALC manager 108 sends (828) a “Turn On” or equivalent transaction message or command to every active load client 300 which is currently in the “Off” state and is served by the serving utility identified in the “End Event” message or to which the “End Event” message relates. Upon determining (830) that all the appropriate active load clients 300 have transitioned to the “On” state, the ALC manager 108 sends (832) an “Event Ended” or equivalent transaction message or command to the master event manager 106.


Referring now to FIG. 8, exemplary operational flow diagram 900 illustrates steps executed by the ALD server 100 (e.g., through operation of the power savings application 120) to calculate and allocate power savings in the power load management system 10, in accordance with one embodiment of the present invention. The power savings application 120 calculates the total amount of power saved by each utility for each Cut event and the amount of power saved by each customer possessing an active load client 300.


According to the logic flow of FIG. 8, the power savings application 120 receives (902) an “Event Ended” or equivalent transaction message or command from the master event manager 106 each time a “Cut” or power savings event has ended. The power savings application 120 then accesses (904) the ALD database 124 for each active load client 300 involved in the “Cut” event. The database record for each active load client 300 contains the actual amount (or average amount) of power that would have been used by the active load client 300 during the last “Cut” event, along with the amount of time that each controllable device 402-412, 420 associated with the active load client 300 was turned off. The power savings application 120 uses this information to calculate the amount of power (e.g., in megawatts per hour) that was saved for each active load client 300. The total power savings for each active load client 300 is stored in its corresponding entry in the ALD database 124. A running total of power saved is kept for each “Cut” transaction. Each utility that is served by the ALD server 100 has an entry in the utility or electric power grid operator(s) P&C database 134. The power savings application 120 stores (906) the total amount of power (e.g., in megawatts per hour) saved for the specific utility in the utility's corresponding entry in the utility P&C database 134, along with other information related to the power savings event (e.g., the time duration of the event, the number of active load clients required to reach the power savings, average length of time each device was in the off state, plus any other information that would be useful in fine tuning future events and in improving customer experience). When all active load client entries have been processed, the power savings application 120 optionally invokes (908) the carbon savings application 132 or, analogously, a sulfur dioxide savings application or a nitrogen dioxide savings application, to correlate the power savings with carbon credits, sulfur dioxide credits or nitrogen dioxide credits, respectively, based on the geographic locations of the particular serving utility or electric power grid operator(s) and customer. Additionally, in one embodiment, the carbon savings application 132 determines carbon credits based on government approved or supplied formulas and stores the determined carbon credits on a per customer and/or per utility or electric power grid operator(s) basis.


As described above, the present invention encompasses a method for managing and distributing power within a power management system based on real-time feedback from addressable and remotely controllable devices including the actual amount of power currently being individually or collectively consumed by the addressable devices. With this invention, a power management system may pinpoint specific areas of high power usage and more accurately distribute power loads to utilities in need. Additionally, the present invention provides optional participation incentives for customers based on the amount of their actual participation in the power management system.


In the foregoing specification, the present invention has been described with reference to specific embodiments. However, one of ordinary skill in the art will appreciate that various modifications and changes may be made without departing from the spirit and scope of the present invention as set forth in the appended claims. For example, the present invention is applicable for managing the distribution of power from utility companies or electric power grid operator(s) to subscribing customers using any number of IP-based or other communication methods. Additionally, the functions of specific modules within the ALD server 100 and/or active load client 300 may be performed by one or more equivalent means. Accordingly, the specification and drawings are to be regarded in an illustrative rather than a restrictive sense, and all such modifications are intended to be included within the scope of the present invention.


Benefits, other advantages, and solutions to problems have been described above with regard to specific embodiments of the present invention. However, the benefits, advantages, solutions to problems, and any element(s) that may cause or result in such benefits, advantages, or solutions to become more pronounced are not to be construed as a critical, required, or essential feature or element of any or all the claims. The invention is defined solely by the appended claims including any amendments made during the pendency of this application and all equivalents of those claims as issued.

Claims
  • 1. An apparatus for power management in an electric power grid, wherein a power flow to a plurality of power consuming devices in the electric power grid is enabled and disabled by a plurality of controllable devices under the control of one or more client devices, comprising: a command processor configured to receive power control commands and issue power control event messages responsive thereto, wherein at least one of the power control commands requires a reduction in an amount of electric power consumed by the plurality of power consuming devices;an event manager module configured to receive the power control event messages, maintain at least one power management status relating to each client device and issue power control event instructions responsive to the power control event messages;a database for storing information relating to power consumed by the plurality of power consuming devices based on measurement and verification; anda client device manager module configured to select at least one client device to which to issue a power reduction message, wherein the power reduction message comprises an amount of electric power to be reduced to at least one of the plurality of power consuming devices for a predetermined time.
  • 2. The apparatus of claim 1, wherein the client device manager module is further configured to receive messages from each client device it services periodically or responsive to polling messages sent by the client device manage module.
  • 3. The apparatus of claim 2, wherein the messages comprise a status response message including a type, a status, and a present power consumption of each power consuming device controlled each client device.
  • 4. The apparatus of claim 3, wherein the type, the status and the present power consumption in the status response message are stored in the database.
  • 5. The apparatus of claim 2, wherein the messages further comprise a security alert message.
  • 6. The apparatus of claim 2, wherein the messages further comprise a report trigger message.
  • 7. The apparatus of claim 1, wherein the amount of electric power comprised in the power reduction message is an instantaneous amount of power or an average amount of power per unit time.
  • 8. The apparatus of claim 1, wherein the measurement and verification is based on standards supplied by a regulatory body for the electric power grid.
  • 9. The apparatus of claim 1, wherein a power supply value (PSV) for each power consuming device is generated based on an actual amount of power reduction at each power consuming device.
  • 10. The apparatus of claim 9, wherein a variation of the PSV is based on operating tolerances and operating standards for accuracy of measurement.
  • 11. The apparatus of claim 9, wherein the PSV provides a curtailment value as a requirement for providing supply to the electric power grid.
  • 12. The apparatus of claim 1, further comprising a power savings application configured to compute an amount of electric power saved by a customer during a power reduction event affecting the customer.
  • 13. The apparatus of claim 12, wherein the power savings application further computes an amount of electric power saved by an electric utility or an electric power grid operator during the power reduction event affecting the electric utility or the electric power grid operator.
  • 14. The apparatus of claim 12, further comprising a carbon savings application that determines an amount of carbon saved by the customer during the power reduction event affecting the customer based on the amount of electric power saved by the customer as computed by the power savings application.
  • 15. The apparatus of claim 14, wherein the carbon savings application further determines an amount of carbon saved by an electric utility or an electric power grid operator during the power reduction event.
  • 16. The apparatus of claim 1, further comprising a client interface that facilitates communication between the client device manager module and the at least one client device, and wherein the client interface is an Internet Protocol (IP)-based interface.
  • 17. A system for power management in an electric power grid, comprising: a server controller; at least one client device; and a plurality of power consuming devices;wherein a power flow to the plurality of power consuming devices in the electric power grid is enabled and disabled by a plurality of controllable devices and wherein the plurality of controllable devices operate under the control of the at least one client device;wherein the server controller comprises a command processor, an event management module, a database and a client device manager module;wherein the command processor is configured to receive power control commands and issue power control event messages responsive thereto, wherein at least one of the power control commands requires a reduction in an amount of electric power consumed by the plurality of power consuming devices;wherein the event manager module is configured to receive the power control event messages, maintain at least one power management status relating to the at least one client device and issue power control event instructions responsive to the power control event messages;wherein the database stores information relating to power consumed by the plurality of power consuming devices based on measurement and verification; andwherein the client device manager module is configured to select at least one client device to which to issue a power reduction message, wherein the power reduction message comprises an amount of electric power to be reduced to at least one of the plurality of power consuming devices for a predetermined time.
  • 18. The system of claim 17, wherein the power control commands are received from an electric utility control center.
  • 19. The system of claim 17, wherein a power supply value (PSV) for each power consuming device is generated based on an amount of power reduction at each power consuming device.
  • 20. The system of claim 19, wherein the PSV is in units of electrical power flow, monetary equivalent, and combinations thereof.
CROSS-REFERENCE TO RELATED APPLICATIONS

This application relates to and claims priority from the following U.S. patent applications. This application is a continuation of U.S. application Ser. No. 14/456,348 filed Aug. 11, 2014, which is a continuation of U.S. application Ser. No. 13/463,781 filed on May 3, 2012 and issued as U.S. Pat. No. 8,806,239, which is a continuation-in-part of U.S. application Ser. No. 13/172,261 filed on Jun. 29, 2011 and issued as U.S. Pat. No. 8,307,225, which is a continuation of U.S. application Ser. No. 12/715,124 filed Mar. 1, 2010 and issued as U.S. Pat. No. 8,010,812, which is a division of U.S. application Ser. No. 11/895,909 filed Aug. 28, 2007 and issued as U.S. Pat. No. 7,715,951, each of which is incorporated herein by reference in its entirety.

US Referenced Citations (424)
Number Name Date Kind
3906242 Stevenson Sep 1975 A
4023043 Stevenson May 1977 A
4589075 Buennagel May 1986 A
4799059 Grindahl et al. Jan 1989 A
4819180 Hedman et al. Apr 1989 A
4819229 Pritty et al. Apr 1989 A
5237507 Chasek Aug 1993 A
5361982 Liebl et al. Nov 1994 A
5388101 Dinkins Feb 1995 A
5462225 Massara et al. Oct 1995 A
5481546 Dinkins Jan 1996 A
5502339 Hartig Mar 1996 A
5544036 Brown et al. Aug 1996 A
5570002 Castleman Oct 1996 A
5592491 Dinkins Jan 1997 A
5640153 Hildebrand et al. Jun 1997 A
5644173 Elliason et al. Jul 1997 A
5675503 Moe et al. Oct 1997 A
5696695 Ehlers et al. Dec 1997 A
5721936 Kikinis et al. Feb 1998 A
5926776 Glorioso et al. Jul 1999 A
5973481 Thompson et al. Oct 1999 A
6018690 Saito Jan 2000 A
6037758 Perez Mar 2000 A
6078785 Bush Jun 2000 A
6102487 Oevreboe Aug 2000 A
6107693 Mongia et al. Aug 2000 A
6115676 Rector et al. Sep 2000 A
6154859 Norizuki Nov 2000 A
6216956 Ehlers et al. Apr 2001 B1
6233327 Petite May 2001 B1
6254009 Proffitt et al. Jul 2001 B1
6304552 Chapman et al. Oct 2001 B1
6366217 Cunningham et al. Apr 2002 B1
6374101 Gelbien Apr 2002 B1
6437692 Petite et al. Aug 2002 B1
6519509 Nierlich et al. Feb 2003 B1
6529839 Uggerud et al. Mar 2003 B1
6535797 Bowles et al. Mar 2003 B1
6577962 Afshari Jun 2003 B1
6583521 Lagod et al. Jun 2003 B1
6601033 Sowinski Jul 2003 B1
6602627 Liu et al. Aug 2003 B2
6621179 Howard Sep 2003 B1
6622097 Hunter Sep 2003 B2
6622925 Carner et al. Sep 2003 B2
6633823 Bartone et al. Oct 2003 B2
6671586 Davis et al. Dec 2003 B2
6681154 Nierlich et al. Jan 2004 B2
6687574 Pietrowicz et al. Feb 2004 B2
6718761 Merswolke et al. Apr 2004 B2
6732055 Bagepalli et al. May 2004 B2
6747368 Jarrett Jun 2004 B2
6778882 Spool et al. Aug 2004 B2
6784807 Petite et al. Aug 2004 B2
6832135 Ying Dec 2004 B2
6834811 Huberman et al. Dec 2004 B1
6836737 Petite et al. Dec 2004 B2
6862498 Davis et al. Mar 2005 B2
6865450 Masticola et al. Mar 2005 B2
6868293 Schurr et al. Mar 2005 B1
6879059 Sleva Apr 2005 B2
6891838 Petite et al. May 2005 B1
6904336 Raines et al. Jun 2005 B2
6906617 Meulen Jun 2005 B1
6909942 Andarawis et al. Jun 2005 B2
6914533 Petite Jul 2005 B2
6914893 Petite Jul 2005 B2
6934316 Cornwall et al. Aug 2005 B2
6944555 Blackett et al. Sep 2005 B2
6961641 Forth Nov 2005 B1
6990593 Nakagawa Jan 2006 B2
7003640 Mayo et al. Feb 2006 B2
7019667 Petite et al. Mar 2006 B2
7035719 Howard et al. Apr 2006 B2
7039532 Hunter May 2006 B2
7053767 Petite et al. May 2006 B2
7088014 Nierlich et al. Aug 2006 B2
7103511 Petite Sep 2006 B2
7123994 Weik et al. Oct 2006 B2
7133750 Raines et al. Nov 2006 B2
7136725 Paciorek et al. Nov 2006 B1
7141321 McArthur et al. Nov 2006 B2
7142949 Brewster et al. Nov 2006 B2
7177728 Gardner Feb 2007 B2
7181320 Whiffen et al. Feb 2007 B2
7184861 Petite Feb 2007 B2
7200134 Proctor et al. Apr 2007 B2
7206670 Pimputkar et al. Apr 2007 B2
7209804 Curt et al. Apr 2007 B2
7209840 Petite et al. Apr 2007 B2
7233843 Budhraja et al. Jun 2007 B2
7263073 Petite et al. Aug 2007 B2
7263450 Hunter Aug 2007 B2
7274975 Miller Sep 2007 B2
7289887 Rodgers Oct 2007 B2
7295128 Petite Nov 2007 B2
7305282 Chen Dec 2007 B2
7313465 O'Donnell Dec 2007 B1
7343341 Sandor et al. Mar 2008 B2
7345998 Cregg et al. Mar 2008 B2
7346463 Petite et al. Mar 2008 B2
7366164 Habib et al. Apr 2008 B1
7397907 Petite Jul 2008 B2
7406364 Rissanen et al. Jul 2008 B2
7412304 Uenou Aug 2008 B2
7424527 Petite Sep 2008 B2
7440871 McConnell et al. Oct 2008 B2
7451019 Rodgers Nov 2008 B2
7468661 Petite et al. Dec 2008 B2
7480501 Petite Jan 2009 B2
7486681 Weber Feb 2009 B2
7492617 Petter et al. Feb 2009 B2
7528503 Rognli et al. May 2009 B2
7536240 McIntyre et al. May 2009 B2
7541941 Bogolea et al. Jun 2009 B2
7565227 Richard Jul 2009 B2
7650425 Davis et al. Jan 2010 B2
7697492 Petite Apr 2010 B2
7711796 Gutt et al. May 2010 B2
7715951 Forbes, Jr. May 2010 B2
7738999 Petite Jun 2010 B2
7739378 Petite Jun 2010 B2
7747165 Emery et al. Jun 2010 B2
7940901 Paraskevakos et al. May 2011 B2
8010812 Forbes, Jr. Aug 2011 B2
8032233 Forbes, Jr. Oct 2011 B2
8032461 Winter et al. Oct 2011 B2
8046110 Mayor et al. Oct 2011 B2
8068938 Fujita Nov 2011 B2
8145361 Forbes, Jr. Mar 2012 B2
8260468 Ippolito et al. Sep 2012 B2
8260470 Forbes, Jr. Sep 2012 B2
8295989 Rettger et al. Oct 2012 B2
8307225 Forbes et al. Nov 2012 B2
8315717 Forbes et al. Nov 2012 B2
8315743 Sackman et al. Nov 2012 B2
8359124 Zhou et al. Jan 2013 B2
8359215 Robbins et al. Jan 2013 B1
8364609 Ozog Jan 2013 B2
8396606 Forbes et al. Mar 2013 B2
8407252 Bennett et al. Mar 2013 B2
8417569 Gross Apr 2013 B2
8428752 Bennett et al. Apr 2013 B2
8442917 Burke May 2013 B1
8457802 Steven et al. Jun 2013 B1
8463449 Sanders Jun 2013 B2
8473111 Shankar et al. Jun 2013 B1
8527107 Forbes et al. Sep 2013 B2
8571930 Galperin Oct 2013 B1
8583520 Forbes Nov 2013 B1
8588991 Forbes, Jr. Nov 2013 B1
8600556 Nesler et al. Dec 2013 B2
8684266 Bennett et al. Apr 2014 B2
8761952 Forbes Jun 2014 B2
8805552 Forbes Aug 2014 B2
8806239 Forbes Aug 2014 B2
8890505 Forbes Nov 2014 B2
9766644 Forbes, Jr. Sep 2017 B2
9952611 Forbes, Jr. Apr 2018 B2
20010030468 Anderson et al. Oct 2001 A1
20010038343 Meyer et al. Nov 2001 A1
20020019758 Scarpelli Feb 2002 A1
20020019802 Malme et al. Feb 2002 A1
20020035496 Fukushima et al. Mar 2002 A1
20020036430 Welches et al. Mar 2002 A1
20020109607 Cumeralto et al. Aug 2002 A1
20020138176 Davis et al. Sep 2002 A1
20020143693 Soestbergen et al. Oct 2002 A1
20020161648 Mason et al. Oct 2002 A1
20020198629 Ellis Dec 2002 A1
20030009401 Ellis Jan 2003 A1
20030009705 Thelander et al. Jan 2003 A1
20030036820 Yellepeddy et al. Feb 2003 A1
20030083980 Satake May 2003 A1
20030144864 Mazzarella Jul 2003 A1
20030149937 McElfresh et al. Aug 2003 A1
20030158632 Nierlich et al. Aug 2003 A1
20030167178 Jarman et al. Sep 2003 A1
20030176952 Collins Sep 2003 A1
20030225483 Santinato et al. Dec 2003 A1
20030229572 Raines et al. Dec 2003 A1
20030233201 Horst et al. Dec 2003 A1
20040006439 Hunter Jan 2004 A1
20040024483 Holcombe Feb 2004 A1
20040044571 Bronnimann et al. Mar 2004 A1
20040088083 Davis et al. May 2004 A1
20040095237 Chen et al. May 2004 A1
20040107025 Ransom et al. Jun 2004 A1
20040117330 Ehlers et al. Jun 2004 A1
20040128266 Yellepeddy et al. Jul 2004 A1
20040138834 Blackett et al. Jul 2004 A1
20040153170 Santacatterina et al. Aug 2004 A1
20040158478 Zimmerman Aug 2004 A1
20040158541 Notarianni et al. Aug 2004 A1
20040162793 Scott et al. Aug 2004 A1
20040193329 Ransom et al. Sep 2004 A1
20040225514 Greenshields et al. Nov 2004 A1
20040230533 Benco Nov 2004 A1
20050021397 Cui et al. Jan 2005 A1
20050033481 Budhraja et al. Feb 2005 A1
20050055432 Rodgers Mar 2005 A1
20050065742 Rodgers Mar 2005 A1
20050080772 Bern Apr 2005 A1
20050096856 Lubkeman et al. May 2005 A1
20050096857 Hunter May 2005 A1
20050096979 Koningstein May 2005 A1
20050097204 Horowitz et al. May 2005 A1
20050125243 Villalobos Jun 2005 A1
20050127680 Lof et al. Jun 2005 A1
20050138432 Ransom Jun 2005 A1
20050192711 Raines et al. Sep 2005 A1
20050192713 Weik et al. Sep 2005 A1
20050197742 Scott et al. Sep 2005 A1
20050216302 Raji et al. Sep 2005 A1
20050216580 Raji et al. Sep 2005 A1
20050234600 Boucher et al. Oct 2005 A1
20050240314 Martinez Oct 2005 A1
20050240315 Booth et al. Oct 2005 A1
20050246190 Sander et al. Nov 2005 A1
20050267642 Whiffen et al. Dec 2005 A1
20050276222 Kumar et al. Dec 2005 A1
20050288954 McCarthy et al. Dec 2005 A1
20060020544 Kaveski Jan 2006 A1
20060020596 Liu et al. Jan 2006 A1
20060022841 Hoiness et al. Feb 2006 A1
20060025891 Budike Feb 2006 A1
20060031934 Kriegel Feb 2006 A1
20060064205 Ying Mar 2006 A1
20060069616 Bau Mar 2006 A1
20060106635 Ulrich et al. May 2006 A1
20060142900 Rothman et al. Jun 2006 A1
20060142961 Johnson et al. Jun 2006 A1
20060161310 Lal Jul 2006 A1
20060161450 Carey et al. Jul 2006 A1
20060168191 Ives Jul 2006 A1
20060190354 Meisel et al. Aug 2006 A1
20060195334 Reeb et al. Aug 2006 A1
20060212350 Ellis et al. Sep 2006 A1
20060224615 Korn et al. Oct 2006 A1
20060241244 Soeda et al. Oct 2006 A1
20060241314 Sullivan et al. Oct 2006 A1
20060271244 Cumming et al. Nov 2006 A1
20060271314 Hayes Nov 2006 A1
20060276938 Miller Dec 2006 A1
20060282328 Gerace et al. Dec 2006 A1
20070021874 Rognli et al. Jan 2007 A1
20070038563 Ryzerski Feb 2007 A1
20070058453 Shaffer et al. Mar 2007 A1
20070058629 Luft Mar 2007 A1
20070070895 Narvaez Mar 2007 A1
20070085702 Walters et al. Apr 2007 A1
20070091900 Asthana et al. Apr 2007 A1
20070094043 Bannai et al. Apr 2007 A1
20070100503 Balan et al. May 2007 A1
20070100961 Moore May 2007 A1
20070150353 Krassner et al. Jun 2007 A1
20070156621 Wright et al. Jul 2007 A1
20070156887 Wright et al. Jul 2007 A1
20070174114 Bigby et al. Jul 2007 A1
20070192333 Ali Aug 2007 A1
20070203722 Richards et al. Aug 2007 A1
20070204176 Shaffer et al. Aug 2007 A1
20070213878 Chen Sep 2007 A1
20070214118 Schoen et al. Sep 2007 A1
20070214132 Grubb et al. Sep 2007 A1
20070255457 Whitcomb et al. Nov 2007 A1
20070260540 Chau et al. Nov 2007 A1
20070282495 Kempton et al. Dec 2007 A1
20070286210 Gutt et al. Dec 2007 A1
20070291644 Roberts et al. Dec 2007 A1
20070299562 Kates Dec 2007 A1
20080010212 Moore et al. Jan 2008 A1
20080015976 Sander et al. Jan 2008 A1
20080040223 Bridges et al. Feb 2008 A1
20080091625 Kremen Apr 2008 A1
20080104026 Koran May 2008 A1
20080109387 Deaver et al. May 2008 A1
20080130673 Cregg et al. Jun 2008 A1
20080147465 Raines et al. Jun 2008 A1
20080154801 Fein et al. Jun 2008 A1
20080165714 Dettinger et al. Jul 2008 A1
20080172312 Synesiou et al. Jul 2008 A1
20080177423 Brickfield et al. Jul 2008 A1
20080177678 Martini et al. Jul 2008 A1
20080186202 Vaswani et al. Aug 2008 A1
20080195462 Magdon-Ismail et al. Aug 2008 A1
20080224892 Bogolea et al. Sep 2008 A1
20080231114 Tolnar et al. Sep 2008 A1
20080238710 Tolnar et al. Oct 2008 A1
20080249832 Richardson et al. Oct 2008 A1
20080255899 McConnell et al. Oct 2008 A1
20080263025 Koran Oct 2008 A1
20080270223 Collins et al. Oct 2008 A1
20080272934 Wang et al. Nov 2008 A1
20080281473 Pitt Nov 2008 A1
20080306824 Parkinson Dec 2008 A1
20080306830 Lasa et al. Dec 2008 A1
20080313632 Kumar et al. Dec 2008 A1
20080319893 Mashinsky et al. Dec 2008 A1
20090012996 Gupta et al. Jan 2009 A1
20090018884 McConnell et al. Jan 2009 A1
20090024718 Anagnostopoulos et al. Jan 2009 A1
20090038343 Gibson Feb 2009 A1
20090043519 Bridges et al. Feb 2009 A1
20090043520 Pollack et al. Feb 2009 A1
20090045804 Durling et al. Feb 2009 A1
20090055031 Slota Feb 2009 A1
20090055032 Rodgers Feb 2009 A1
20090062970 Forbes et al. Mar 2009 A1
20090063228 Forbes Mar 2009 A1
20090088907 Lewis et al. Apr 2009 A1
20090112701 Turpin Apr 2009 A1
20090112758 Herzig Apr 2009 A1
20090124241 Krishnaswamy et al. May 2009 A1
20090125462 Krishnaswamy et al. May 2009 A1
20090135836 Veillette May 2009 A1
20090138362 Schroedl et al. May 2009 A1
20090157529 Ehlers et al. Jun 2009 A1
20090187344 Brancaccio et al. Jul 2009 A1
20090187499 Mulder et al. Jul 2009 A1
20090198384 Ahn Aug 2009 A1
20090228335 Niyogi et al. Sep 2009 A1
20090240381 Lane Sep 2009 A1
20090240677 Parekh et al. Sep 2009 A1
20090281673 Taft Nov 2009 A1
20090281674 Taft Nov 2009 A1
20090313034 Ferro et al. Dec 2009 A1
20090313103 Ambrosio et al. Dec 2009 A1
20090319415 Stoilov et al. Dec 2009 A1
20100076835 Silverman Mar 2010 A1
20100082464 Keefe Apr 2010 A1
20100094981 Cordray et al. Apr 2010 A1
20100106575 Bixby Apr 2010 A1
20100106641 Chassin et al. Apr 2010 A1
20100138452 Henkin et al. Jun 2010 A1
20100163634 Klein et al. Jul 2010 A1
20100169175 Koran Jul 2010 A1
20100179862 Chassin et al. Jul 2010 A1
20100191862 Forbes et al. Jul 2010 A1
20100217452 McCord et al. Aug 2010 A1
20100217549 Galvin et al. Aug 2010 A1
20100217550 Crabtree et al. Aug 2010 A1
20100217642 Crubtree et al. Aug 2010 A1
20100218108 Crabtree et al. Aug 2010 A1
20100235008 Forbes et al. Sep 2010 A1
20100274407 Creed Oct 2010 A1
20100293045 Burns et al. Nov 2010 A1
20100306033 Oved et al. Dec 2010 A1
20100324748 Voysey Dec 2010 A1
20100328849 Ewing et al. Dec 2010 A1
20100332373 Crabtree et al. Dec 2010 A1
20110007824 Bridges et al. Jan 2011 A1
20110025556 Bridges et al. Feb 2011 A1
20110029655 Forbes et al. Feb 2011 A1
20110055036 Helfan Mar 2011 A1
20110060474 Schmiegel et al. Mar 2011 A1
20110080044 Schmiegel Apr 2011 A1
20110106729 Billingsley et al. May 2011 A1
20110115302 Slota May 2011 A1
20110130982 Haag et al. Jun 2011 A1
20110133655 Recker Jun 2011 A1
20110145061 Spurr et al. Jun 2011 A1
20110147360 Hammerstrom Jun 2011 A1
20110161250 Koeppel et al. Jun 2011 A1
20110172841 Forbes, Jr. Jul 2011 A1
20110178610 Gamble et al. Jul 2011 A1
20110185303 Katagi et al. Jul 2011 A1
20110196546 Muller et al. Aug 2011 A1
20110196547 Park et al. Aug 2011 A1
20110204717 Shaffer Aug 2011 A1
20110204719 Sackman et al. Aug 2011 A1
20110208366 Taft Aug 2011 A1
20110208367 Sackman et al. Aug 2011 A1
20110231028 Ozog Sep 2011 A1
20110235656 Pigeon Sep 2011 A1
20110251730 Pitt Oct 2011 A1
20110257809 Forbes, Jr. Oct 2011 A1
20110258022 Forbes, Jr. Oct 2011 A1
20110267202 Efthymiou et al. Nov 2011 A1
20110270452 Lu et al. Nov 2011 A1
20110270682 Valin Nov 2011 A1
20120004872 Oh et al. Jan 2012 A1
20120029897 Cherian et al. Feb 2012 A1
20120059532 Reifenhaeuser et al. Mar 2012 A1
20120078427 Jang et al. Mar 2012 A1
20120089263 Park et al. Apr 2012 A1
20120095841 Luckerman et al. Apr 2012 A1
20120101652 Shin et al. Apr 2012 A1
20120131100 Van Olst et al. May 2012 A1
20120146799 Bell et al. Jun 2012 A1
20120153888 Jung Jun 2012 A1
20120154171 Hurri et al. Jun 2012 A1
20120196482 Stokoe Aug 2012 A1
20120205977 Shin et al. Aug 2012 A1
20120221162 Forbes Aug 2012 A1
20120223840 Guymon et al. Sep 2012 A1
20120226384 Forbes Sep 2012 A1
20120232816 Oh et al. Sep 2012 A1
20120239218 Forbes, Jr. Sep 2012 A1
20120239219 Forbes Sep 2012 A1
20120245753 Forbes Sep 2012 A1
20120259760 Sgouridis et al. Oct 2012 A1
20120296799 Playfair et al. Nov 2012 A1
20120310800 Xia et al. Dec 2012 A1
20120316691 Boardman et al. Dec 2012 A1
20120316697 Boardman et al. Dec 2012 A1
20130006435 Berrios et al. Jan 2013 A1
20130031201 Kagan et al. Jan 2013 A1
20130035802 Khaitan et al. Feb 2013 A1
20130036311 Akyol et al. Feb 2013 A1
20130038468 Wang et al. Feb 2013 A1
20130079939 Darden, II Mar 2013 A1
20130079943 Darden, II Mar 2013 A1
20130110297 Reichmuth et al. May 2013 A1
20130123998 King et al. May 2013 A1
20130144768 Rohrbaugh Jun 2013 A1
20130173360 Thatcher Jul 2013 A1
20130191260 Michael Jul 2013 A1
20140018969 Forbes Jan 2014 A1
20140025486 Bigby et al. Jan 2014 A1
20140039699 Forbes Feb 2014 A1
20140039701 Forbes Feb 2014 A1
20140039703 Forbes, Jr. Feb 2014 A1
Foreign Referenced Citations (15)
Number Date Country
1729223 Dec 2006 EP
2000078748 Mar 2000 JP
2001306839 Nov 2001 JP
2004180412 Jun 2004 JP
2004248174 Sep 2004 JP
2006060911 Mar 2006 JP
2007132553 May 2007 JP
20050045272 May 2005 KR
20060036171 Apr 2006 KR
20070008321 Jan 2007 KR
100701298 Mar 2007 KR
20070098172 Oct 2007 KR
20080112692 Dec 2008 KR
2007136456 Nov 2007 WO
2008125696 Oct 2008 WO
Non-Patent Literature Citations (19)
Entry
B.J. Kirby, Spinning Reserve from Responsive Loads, Oak Ridge National Laboratory, United States Dept. of Energy, Mar. 2003 (54 pages).
Byers J. Risk Management and Monetizing the Commodity Storage Option. Natural Gas & Electricity [serial online]. Jul. 2005; 21 (12):1-8. Available from: Business Source Complete, Ipswich, MA.
C.W. Gellings and W.M. Smith, Integrating Demand-Side Management into Utility Planning, Proceedings of the IEEE, vol. 77, Issue: 6, Jun. 1989, pp. 908-918 (Abstract only).
Eric Hirst and Brendan Kirby, Opportunities for Demand Participation in New England Contingency-Reserve Markets, New England Demand Response Initiative, Feb. 2003 (15 pages).
Eric Hirst and Richard Cowart, Demand Side Resources and Reliability, New England Demand Response Initiative, Mar. 20, 2002 (32 pages).
Galvin Electricity Institute: Frequently Asked Questions, printed Apr. 23, 2014, same page available through archive.org unchanged Mar. 1, 2008.
GE Digital Energy Residential Electrical Metering Brochure. Sep. 12, 2012. https://web.archive.org/web/20120912144353/http://www.gedigitalenergry.com/products/brochures/1210-Family.pdf.
Illinois General Assembly: Public Act 094-0977, Effective Date: Jun. 30, 2006.
Kamat R., Oren S. Two-Settlement Systems for Electricity Markets under Network Uncertainty and Market Power Journal of Regulatory Economics [serial online]. Jan. 2004; 25(1):5-37.
Kathleen Spees and Lester B. Lave, Demand Response and Electricity Market Efficiency, The Electricity Journal, vol. 20, Issue 3, Apr. 2007 (online Mar. 27, 2007), pp. 69-85 (Abstract only).
L.T. Anstine, R.E. Burke, J.E. Casey, R. Holgate, R.S. John, and H.G. Stewart, Application of Probability Methods to the Determination of Spinning Reserve Requirements for the Pennsylvania-New Jersey-Maryland Interconnection; IEEE Transactions on Power Apparatus and Systems, vol. 82, Issue 68, Oct. 1963, pp. 726-735 (Abstract only).
Lobsenz G. Maryland Regulators Reject BG&E Smart Grid Proposal. Energy Daily [serial online]. Jun. 23, 2010; (118): 3. Available from: Business Source Complete, Ipswich, MA.
M. Rashidi-Nejad, Y.H. Song, and M.H. Javidi-Dasht-Bayaz, Operating Reserve Provision in Deregulated Power Markets, IEEE Power Engineering Society Winter Meeting, vol. 2, 2002, pp. 1305-1310 (Abstract only).
Michael Ahlheim and Friedrich Schneider; “Allowing for Household Preferences in Emission Trading, A Contribution to the Climate Policy Debate”; Environmental and Resource Economics, vol. 21, pp. 317-342; Kluwer Academic Publishers; The Netherlands; 2002.
Olivier Rousse; “Environmental and economic benefits resulting from citizens' participation in CO.sub.2 emissions trading: An efficient alternative solution to the voluntary compensation of CO.sub.2 emissions”, Energy Policy 36 (2008), pp. 388-397; Oct. 29, 2007 (online).
Pablo A. Ruiz and Peter W. Sauer, Valuation of Reserve Services, IEEE Proceedings of the 41 .sup.st Hawaii International Conference on System Sciences, 2008 (9 pages).
Paul Darbee, Insteon Compared, SmartLabs, Inc., Jan. 2, 2006, 69 pages.
Paul Darbee, Insteon The Details, Smarthome, Inc., Aug. 11, 2005, 68 pages.
Zhu Jinxiang, G. Jordan, and S. Ihara, The Market for Spinning Reserve and Its Impacts on Energy Prices, IEEE Power Engineering Society Winter Meeting, vol. 2, 2000, pp. 1202-1207 (Abstract Only).
Related Publications (1)
Number Date Country
20180017985 A1 Jan 2018 US
Divisions (1)
Number Date Country
Parent 11895909 Aug 2007 US
Child 12715124 US
Continuations (3)
Number Date Country
Parent 14456348 Aug 2014 US
Child 15705918 US
Parent 13463781 May 2012 US
Child 14456348 US
Parent 12715124 Mar 2010 US
Child 13172261 US
Continuation in Parts (1)
Number Date Country
Parent 13172261 Jun 2011 US
Child 13463781 US