The present invention relates to a train-information management device and a train-information management method.
In overhead wires of railways, an apparatus referred to as “air section” that insulates a power system different between electric power substations by using air as an insulator is provided. Trains can continue running by receiving power supply from the overhead wires by the air section. Two overhead wires provided in the air section actually have a slight potential difference, even if a nominal voltage is the same. Therefore, when a train stops in the air section due to any circumstances (trains are not running on schedule, an emergency brake has been activated, or any unusual situation has occurred on a railway line), and resumes running in a state with a pantograph being raised, a large electric current may flow between the two overhead wires to cause damage of the pantograph, meltdown of the overhead wires, or shutdown of the electric power substation, thereby causing train diagram disruptions.
As measures against a case when a train stops in an air section, a train driver lowers pantographs. However, the train driver might forget to lower pantographs due to a judgment delay or insufficient skills, or might raise the pantographs again after having lowered them due to a misjudgment. To solve such problems, in conventional trains, when a train stops in a place other than at a platform of a station, such measures have been taken that guidance urging the train driver to confirm whether the train has stopped in the air section is provided by a speaker or a display provided in a cab of the train.
However, because various pieces of train information are provided to the cab, the train driver might fail to judge situations calmly due to these pieces of information, and although the guidance is provided by the speaker or the display, the train driver might raise the pantograph erroneously to cause the train to run again. Therefore, in recent years, a device that supports the train driver when the train stops in the air section has been desired.
For example, in a conventional technology represented by Patent Literature 1 mentioned below, it is configured to detect the position of a pantograph by a ground apparatus, when a train stops in an air section. Therefore, if it is configured such that position information of the pantograph detected by the ground apparatus is transmitted to an onboard apparatus, when the train stops, it is possible to inform a train driver as to whether the stopped position of the train is in the air section.
However, the conventional technology represented by Patent Literature 1 mentioned above has such problems that not only considerable costs are required because of using a ground device but also measures against a situation in which a train driver erroneously raises pantographs are not taken into consideration.
The present invention has been achieved to solve the above problems, and an object of the present invention is to provide a train-information management device and a train-information management method that can suppress some damage when a train stops in the air section.
In order to solve above-mentioned problems and achieve the object of the present invention, a train-information management device includes a train-information central device that manages train control information as a control command signal with respect to a device incorporated in a plurality of vehicles constituting a train formation, wherein the train-information central device includes an information processing unit that collates a distance in kilometers measured on the vehicle with track information including a position of an air section provided in overhead wires when the train stops, and outputs a ‘lower pantograph’ operation signal as train control information when determining that at least one pantograph is present in the air section, and detecting that the pantograph is in a raised state based on raised/lowered state information output from the pantograph.
According to the present invention, when it is determined that a pantograph is present in an air section when a train stops, and when it is detected that the pantograph is in a raised state, operations of the pantograph are controlled, and thus damage when a train stops in the air section can be suppressed.
Exemplary embodiments of a train-information management device and a train-information management method according to the present invention will be explained below in detail with reference to the accompanying drawings. The present invention is not limited to the embodiments.
A central unit 10 that constitutes the train-information management device is incorporated in the first vehicle 1. The central unit 10 is connected to the trunk transmission line 21 and an on-board transmission line 22, and includes an arithmetic processing unit (information processing unit) 10a, a CPU and a memory, to function according to software that realizes the function of the train-information management device.
A master controller (master control unit) 20 and a cab I/F unit 30 connected to the on-board transmission line 22 is incorporated in the first vehicle 1. The master controller 20 transmits notch information and control input information required for driving such as a traveling direction to the central unit 10. For example, when a pantograph operation switch (not shown) provided on the cab 5 is operated, the cab I/F unit 30 fetches in a ‘raise pantograph’ operation signal DI-1 or a ‘lower pantograph’ operation signal DI-2 generated by the arithmetic processing unit 10a based on an operation signal 6 from the pantograph operation switch, and outputs a ‘raise pantograph’ command DO-1 or a ‘lower pantograph’ command DO-2.
Terminal devices 12 and 13 respectively connected to the trunk transmission line 21 to constitute the train-information management device, and devices 40 and 41 connected to the terminal devices 12 and 13 via the on-board transmission line 22 are incorporated in the vehicles 2 and 3. The devices 40 and 41 are, for example, a VVVF inverter (variable voltage variable frequency inverter), a brake control unit, an air-conditioning unit, an SIV (static inverter), or the like. A pantograph 7 is installed on a predetermined vehicle (for example, the vehicle 2), and an electric motor (not shown) that is driven by electric power supplied from overhead wires (not shown) via the pantograph 7 is mounted on a predetermined vehicle. The pantograph 7 is controlled by a pantograph drive circuit 50. The pantograph drive circuit 50 performs operations to raise or lower the pantograph 7 in conjunction with the ‘raise pantograph’ command DO-1 or the ‘lower pantograph’ command DO-2 from the cab I/F unit 30.
The train-information management device manages various types of train information such as train control information involved with control of the entire train such as train traffic information, train position information, a power running command, a brake command, and a door open/close command, and operating state information of devices. The central unit 10 and the terminal devices 12 and 13 operate in cooperation with each other to collect the information of the devices connected to the central unit 10 and the terminal devices 12 and 13, and share the information via the trunk transmission line 21.
Operations of the train-information management device are explained below.
The control input information is transmitted to the central unit 10 via the on-board transmission line 22, and the arithmetic processing unit 10a in the central unit 10 generates train control information based on the control input information. The train control information is information related to distribution of a power running torque to the VVVF inverter (for example, power-running notch information), and is transmitted to the terminal devices 12 and 13 via the trunk transmission line 21. For example, the terminal devices 12 and 13 having received the train control information broadcast the train control information to the respective devices 40 and 41. The terminal devices 12 and 13 collect operating-state information data from the respective devices 40 and 41, and transmit these pieces of data to the central unit 10 regularly.
When the operation signal 6 from a pantograph operation switch (not shown) is a ‘raise pantograph’ operation signal, the arithmetic processing unit 10a generates the ‘raise pantograph’ operation signal DI-1 and outputs the signal to the on-board transmission line 22. The cab I/F unit 30 having received the ‘raise pantograph’ operation signal DI-1 outputs the ‘raise pantograph’ command DO-1 to the train line 23. Upon reception of the ‘raise pantograph’ command DO-1 via the train line 23, the pantograph drive circuit 50 drives an expansion/contraction mechanism of the pantograph 7 to set the pantograph 7 in an expanded state. As a result, the pantograph 7 comes in contact with the overhead wires, thereby enabling to supply power from the overhead wires.
When the operation signal 6 from the pantograph operation switch (not shown) is a ‘lower pantograph’ operation signal, the arithmetic processing unit 10a generates the ‘lower pantograph’ operation signal DI-2 and outputs the signal to the on-board transmission line 22. The cab I/F unit 30 having received the ‘lower pantograph’ operation signal DI-2 outputs the ‘lower pantograph’ command DO-2 to the train line 23. Upon reception of the ‘lower pantograph’ command DO-2 via the train line 23, the pantograph drive circuit 50 drives the expansion/contraction mechanism of the pantograph 7 to contract the pantograph 7. As a result, the pantograph 7 separates from the overhead wires, to cut power supply from the overhead wires.
Operations when a train stops in an air section are specifically explained next.
At Step S10, when having determined that the pantograph 7 is not present in the air section (NO at Step S10), the arithmetic processing unit 10a finishes the operation without performing the process at Step S11. At Step S11, for example, when the pantograph 7 is in the lowered state because the ‘lower pantograph’ operation signal is output immediately after the train has stopped in the air section (NO at Step S11), the arithmetic processing unit 10a finishes the operation without performing the process at Step S12.
At this time, when the ‘raise pantograph’ operation is performed although the pantograph 7 separates from the overhead wires, the ‘raise pantograph’ operation signal is output from the pantograph operation switch. When the arithmetic processing unit 10a receives the ‘raise pantograph’ operation signal (YES at Step S23) after having output the ‘lower pantograph’ operation signal DI-2 at Step S22, the arithmetic processing unit 10a outputs first predetermined information to at least one of a speaker and a display (both not shown) provided in the cab 5 (first-information outputting step: S24). The first predetermined information is audio information or visualized message information, which is, for example, “Is it possible to execute a ‘raise pantograph’ operation although the train has stopped in the air section?”, “Please run slow at one notch because the train has stopped in the air section”, or “Have you confirmed with a command and control center whether to resume operation?”. When the notch information having a large value is input due to an erroneous operation of the notch, this matter is notified to a train driver by outputting such information, thereby enabling to suppress adverse effects to the overhead wires and the like.
After a predetermined time has passed since outputting of the first predetermined information, upon reception of the ‘raise pantograph’ operation signal again (YES at Step S25), the arithmetic processing unit 10a outputs the ‘raise pantograph’ operation signal DI-1 (‘raise pantograph’ operation signal outputting step: Step S26). As a result, the pantograph 7 comes in contact with the overhead wires, thereby enabling to supply power from the overhead wires. For example, when power consumption of the train being stopped in the air section is small, the train may be moved to outside of the air section without affecting the overhead wires and the like by causing the train to run at a very low speed. The operations at Steps S25 and S26 correspond to a case where the train driver performs such operations.
At Step S20, when having determined that the pantograph 7 is not present in the air section (NO at Step S20), the arithmetic processing unit 10a finishes the operation without performing the process at Step S21. At Step S21, for example, when the pantograph 7 is in the lowered state because the ‘lower pantograph’ operation signal is output immediately after the train has stopped in the air section (NO at Step S21), the arithmetic processing unit 10a finishes the operation without performing the process at Step S22. At Step S23, when the arithmetic processing unit 10a does not receive the ‘raise pantograph’ operation signal (NO at Step S23), the arithmetic processing unit 10a finishes the operation without performing the process at Step S24. At Step S25, when the arithmetic processing unit 10a does not receive the ‘raise pantograph’ operation signal after a predetermined time has passed since outputting of the first predetermined information (NO at Step S25), the arithmetic processing unit 10a finishes the operation without performing the process at Step S26.
Next, when the ‘raise pantograph’ operation is performed although the pantograph 7 separates from the overhead wires, the ‘raise pantograph’ operation signal is output from the pantograph operation switch. When the arithmetic processing unit 10a receives the ‘raise pantograph’ operation signal (YES at Step S33) after having output the ‘lower pantograph’ operation signal DI-2 at Step S32, the arithmetic processing unit 10a outputs the first predetermined information to at least one of a speaker and a display (both not shown) provided in the cab 5 (Step S34). After a predetermined time has passed since outputting of the first predetermined information, when having received the ‘raise pantograph’ operation signal again (YES at Step S35), the arithmetic processing unit 10a outputs the ‘raise pantograph’ operation signal DI-1 (Step S36).
Next, when the master controller 20 outputs second notch information with a value larger than a minimum value of first notch information (YES at Step S37), the arithmetic processing unit 10a converts the second notch information to the first notch information (notch-information converting step: Step S38). The first notch information is a requisite minimum notch for the train being stopped to move out of the air section (for example, one notch), and the second notch information is, for example, two notches or more. With this process, when the train is caused to move out of the air section, even if the notch information having a large value is input due to an erroneous operation of the notch, an excessive current is prevented from flowing in the overhead wires, and adverse effects to the overhead wires and the like can be suppressed.
The arithmetic processing unit 10a then outputs the second predetermined information to at least one of the speaker and the display (both not shown) provided in the cab 5 (second-information outputting step: Step S39). The second predetermined information is audio information or visualized message information, which is, for example, “The train is in operation based on the first notch information”. By outputting this information, even when the operation exceeding two notches is currently performed, the train driver can calmly perform a notch operation with respect to the fact that the train does not accelerate.
At Step S30, when having determined that the pantograph 7 is not present in the air section (NO at Step S30), the arithmetic processing unit 10a finishes the operation without performing the process at Step S31. At Step S31, for example, when the pantograph 7 is in the lowered state because the ‘lower pantograph’ operation signal is output immediately after the train has stopped in the air section (NO at Step S31), the arithmetic processing unit 10a finishes the operation without performing the process at Step S32. At Step S33, when the arithmetic processing unit 10a does not receive the ‘raise pantograph’ operation signal (NO at Step S33), the arithmetic processing unit 10a finishes the operation without performing the process at Step S34. At Step S35, when the arithmetic processing unit 10a does not receive the ‘raise pantograph’ operation signal after the predetermined time has passed since outputting of the first predetermined information (NO at Step S35), the arithmetic processing unit 10a finishes the operation without performing the process at Step S36. Furthermore, at Step S37, when the second notch information has not been output from the master controller 20 (NO at Step S37), the arithmetic processing unit 10a performs the process at Step S39.
In the operation example shown in
Next, when the ‘raise pantograph’ operation is performed although the pantograph 7 separates from the overhead wires, the ‘raise pantograph’ operation signal is output from the pantograph operation switch. When the arithmetic processing unit 10a receives the ‘raise pantograph’ operation signal (YES at Step S43) after having output the ‘lower pantograph’ operation signal DI-2 at Step S42, the arithmetic processing unit 10a outputs the first predetermined information to at least one of a speaker and a display (both not shown) provided in the cab 5 (Step S44). After a predetermined time has passed since outputting of the first predetermined information, when having received the ‘raise pantograph’ operation signal again (YES at Step S45), the arithmetic processing unit 10a outputs the ‘raise pantograph’ operation signal DI-1 (Step S46). Next, when the master controller 20 outputs second notch information with a value larger than a minimum value of first notch information (YES at Step S47), the arithmetic processing unit 10a converts the second notch information to the first notch information (Step S48). The arithmetic processing unit 10a then outputs the second predetermined information to at least one of the speaker and the display (both not shown) provided in the cab 5 (Step S49). The second predetermined information is audio information or visualized message information, which is, for example, “The train is in operation based on the first notch information”.
In this case, when all the pantographs 7 move out of the air section, if the train can accelerate immediately with the second notch information, train diagram disruptions can be suppressed to the minimum. However, at Step S48, because the train speed in the air section has been limited, if changeover from the first notch information (for example, one notch) to the second notch information (for example, four notches) is performed simultaneously with all the pantographs 7 moving out of the air section, degradation of train ride quality may be caused because of a large speed-change shock. Therefore, when all the pantographs 7 move out of the air section (YES at Step S50), the arithmetic processing unit 10a performs a process to increase the notch information in a stepwise manner for every predetermined time (notch adjusting step: Step S51). By performing such a process, even if the notch is, for example, four notches when all the pantographs 7 move out of the air section, the notch information is increased, for example, from one notch in a stepwise manner to reach four notches. Accordingly, degradation of train ride quality can be suppressed as compared with a case where the notch information is not increased in a stepwise manner.
At Step S40, when having determined that the pantograph 7 is not present in the air section (NO at Step S40), the arithmetic processing unit 10a finishes the operation without performing the process at Step S41. At Step S41, for example, when the pantograph 7 is in the lowered state because the ‘lower pantograph’ operation signal is output immediately after the train has stopped in the air section (NO at Step S41), the arithmetic processing unit 10a finishes the operation without performing the process at Step S42. Furthermore, when the ‘raise pantograph’ operation signal is not received at Step S43 (NO at Step S43), the arithmetic processing unit 10a finishes the operation without performing the process at Step S44. At Step S45, when the ‘raise pantograph’ operation signal is not received after the predetermined time has passed since outputting of the first predetermined information (NO at Step S45), the arithmetic processing unit 10a finishes the operation without performing the process at Step S46. When the second notch information is not output from the master controller 20 at Step S47 (NO at Step S47), the arithmetic processing unit 10a performs a process at Step S49. When all the pantographs 7 have not moved out of the air section at Step S50 (NO at Step S50), the arithmetic processing unit 10a maintains the notch without increasing the notch.
The arithmetic processing unit 10a can individually control the plurality of pantographs 7 mounted on the train. An example thereof is specifically explained below.
The arithmetic processing unit 10a can determine which one of the plurality of pantographs 7 is present in an air section by ascertaining the position of the air section.
In
In
The operations of the arithmetic processing unit 10a explained with reference to
As described above, when the train-information management device according to the present embodiment collates the distance in kilometers measured on the vehicle with the track information including the position of the air section, when the train stops, to determine that at least one pantograph 7 is present in the air section (Step S10), and when it is detected that the pantograph 7 is in the raised state based on the raised/lowered state information output from the pantograph 7 (Step S11), the train-information management device outputs the ‘lower pantograph’ operation signal DI-2 as train control information (Step S12). Therefore, when the train stops in the air section, the pantograph 7 can be automatically lowered only by the in-vehicle information, without using the information from the ground device. As a result, damage when the train stops in the air section can be suppressed, and the cost associated with establishing of the ground device or the like, which has been required in the conventional technique, can be suppressed.
Upon reception of the ‘raise pantograph’ operation signal from the pantograph operation switch (Step S23) after the ‘lower pantograph’ operation signal DI-2 is output (Step S22), the train-information management device according to the present embodiment outputs the first predetermined information to at least one of the speaker and the display provided in the cab 5. Accordingly, even when the notch information having a large value is input due to an erroneous operation of the notch, this matter is notified to the train driver, thereby enabling to suppress adverse effects to the overhead wires and the like.
Upon reception of the ‘raise pantograph’ operation signal again after the predetermined time has passed since outputting of the first predetermined information (Step S25), the train-information management device according to the present embodiment outputs the ‘raise pantograph’ operation signal DI-1 as train control information (Step S26). Accordingly, the train can be caused to travel by the notch operation in a situation such that the train can be moved at a very low speed.
When the ‘raise pantograph’ operation signal is received from the pantograph operation switch after the ‘lower pantograph’ operation signal DI-2 is output and the second notch information with a value larger than that of the first notch information is output from the master controller 20 (Step S37), the train-information management device according to the present embodiment converts the second notch information to the first notch information (Step S38). Accordingly, even when the notch information having a large value is input due to an erroneous operation of the notch, an excessive current is prevented from flowing in the overhead wires.
Because the train-information management device according to the present embodiment outputs the second predetermined information to at least one of the speaker and the display provided in the cab 5 (Step S39) after converting the second notch information to the first notch information (Step S38), even when the operation exceeding two notches is currently performed, the train driver can calmly perform a notch operation with respect to the fact that the train does not accelerate.
When all the pantographs 7 move out of the air section (Step S50) after the second notch information is converted to the first notch information (Step S48), the train-information management device according to the present embodiment controls to increase the notch information in a stepwise manner for every predetermined time (Step S51). Accordingly, even when the notch has a large value when all the pantographs 7 move out of the air section, degradation of train ride quality can be suppressed.
If the partial pantograph 7a (7b) is present in the air section when the train stops, the train-information management device according to the present embodiment outputs the ‘lower pantograph’ operation signal DI-2 to the pantograph 7a (7b) present in the air section, and does not output the ‘lower pantograph’ operation signal DI-2 to the pantograph 7b (7a) present outside the air section. Accordingly, even if the train cannot move in the traveling direction, the operation of air conditioning in the vehicle can be continued, and the train can be moved to outside of the air section.
The first notch information is not limited to one notch, and can be a notch that can move a train, which has stopped in an air section, without affecting overhead wires and the like. Furthermore, the train-information management device according to the present embodiment can be configured to determine whether the power consumption value is higher than a predetermined value to set a control command signal to the VVVF to a zero notch, even when the first notch information of one notch is input, when power consumption in the train is large (for example, the operational status of air conditioning and the operating condition of a compressor of a brake control device are high). With this configuration, the damage at the time of moving the train out of the air section can be further reduced.
The train-information management device according to the present embodiment is only an example of the contents of the present invention. The configuration can be combined with other well-known technology, and it is needless to mention that the present invention can be configured while modifying it without departing from the scope of the invention, such as omitting a part of the configuration.
As described above, the present invention can be applicable to a train-information management device, and is useful as an invention that can suppress damage when a train stops in the air section.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP2011/064352 | 6/23/2011 | WO | 00 | 10/22/2013 |