The invention is directed, in general, to integrated circuits (ICs) and, more specifically, to a critical path monitor for an IC and a method of monitoring a path in an IC.
Conserving resources, including energy, has become a pre-eminent objective in today's world. Manufacturers of ICs are sensitive to the need to improve the energy efficiency of their products. National Semiconductor Corporation developed adaptive voltage scaling as part of that overall strategy. The idea behind adaptive voltage scaling was that an IC could be powered based on its actual electrical characteristics and current operating temperature, both of which in part determine signal propagation speed.
One aspect of the invention provides a path monitor. In one embodiment, the path monitor includes: (1) a delay element having an input couplable to an input of a clocked flip-flop associated with a path to be monitored and configured to provide a predetermined delay and (2) a clocked exclusive OR (XOR) gate having a clock input, a first input coupled to an output of the delay element, a second input couplable to the output of the clocked flip-flop and an output at which the clocked XOR gate is configured to respond to a clock signal to provide an error signal only when logic levels of the first input and the second input differ.
Another aspect of the invention provides a method of monitoring a path. In one embodiment, the method includes: (1) providing a predetermined delay with a delay element having an input couplable to an input of a clocked flip-flop associated with a path to be monitored and (2) employing a clocked XOR gate having a clock input, a first input coupled to an output of the delay element and a second input couplable to the output of the clocked flip-flop to respond to a clock signal to provide an error signal at an output thereof only when logic levels of the first input and the second input differ.
Yet another aspect of the invention provides an IC. In one embodiment, the IC includes: (1) a substrate, (2) a plurality of paths located on the substrate, (3) a corresponding plurality of associated path monitors located on the substrate, each including: (3a) a delay element having an input couplable to an input of a clocked flip-flop associated with the corresponding path and configured to provide a predetermined delay and (3b) a clocked XOR gate having a clock input, a first input coupled to an output of the delay element, a second input couplable to the output of the clocked flip-flop and an output at which the clocked XOR gate is configured to respond to a clock signal to provide an error signal only when logic levels of the first input and the second input differ, (4) an unclocked (inclusive) OR gate located on the substrate and coupled to each the output of each the plurality of the path monitors and (5) a VMU located on the substrate and configured to receive an overall error signal from an output of the unclocked OR gate and control a voltage of the IC based thereon.
Still another aspect of the invention provides a library of standard logic elements. In one embodiment, the library includes a standard logic element corresponding to a path monitor, including: (1) a delay element having an input couplable to an input of a clocked flip-flop associated with a path to be monitored and configured to provide a predetermined delay and (2) a clocked XOR gate having a clock input, a first input coupled to an output of the delay element, a second input couplable to the output of the clocked flip-flop and an output at which the clocked XOR gate is configured to respond to a clock signal to provide an error signal only when logic levels of the first input and the second input differ.
The foregoing has outlined certain aspects and embodiments of the invention so that those skilled in the pertinent art may better understand the detailed description of the invention that follows. Additional aspects and embodiments will be described hereinafter that form the subject of the claims of the invention. Those skilled in the pertinent art should appreciate that they can readily use the disclosed aspects and embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the invention. Those skilled in the pertinent art should also realize that such equivalent constructions do not depart from the scope of the invention.
For a more complete understanding of the invention, reference is now made to the following descriptions taken in conjunction with the accompanying drawings, in which:
Adaptive voltage scaling and optimization (AVSO) represents a significant improvement over adaptive voltage scaling. AVSO not only allows an IC to be designed faster than conventionally thought possible, it allows the architecture of the IC to be chosen such that it can be powered at the lowest possible voltage without sacrificing performance.
ICs employing adaptive voltage scaling or AVSO employ path monitors (PMs) placed over their area to monitor transition propagation speed in nearby paths. PMs may therefore be regarded as speed monitors. PMs should be relatively small and simple circuits. While the IC is operating, the PMs determine whether or not the transition propagation speeds in nearby paths are slower or faster than expected and generate output voltages or digital values that reflect any speed difference. A voltage management unit (VMU) receives the voltages or values and controls voltage regulators associated with each voltage domain of the IC to increase or decrease supply voltages as needed.
ICs often employ PMs placed over their area to monitor transition propagation speed in nearby paths. Further, because the number of PMs employed in a given IC may be substantial, they should be relatively small and simple circuits. Since PMs require power to operate, they should also be relatively efficient. Described herein are various embodiments of PMs constructed according to the principles of the invention that are smaller and more efficient than conventional PMs. Also described herein are various embodiments of methods of monitoring a path, an IC employing plural PMs in the context of AVSO and a library of standard logic elements that includes a standard logic element corresponding to a PM constructed according to the principles of the invention.
A plurality of paths is located on the substrate.
A corresponding plurality of associated PMs is also located on the substrate. In particular, a PM 130a is associated with the path a, a PM 130b is associated with the path b, a PM 130c is associated with the path c, and a PM 130n is associated with the path n. Each PM 130a, 130b, 130c, 130n provides a corresponding error signal ea, eb, ec, en. An unclocked (inclusive) OR gate 140 is located on the substrate and coupled to each output of each the plurality of the PMs 130a, 130b, 130c, 130n. The unclocked OR gate 140 is configured to provide an overall error signal E when any one or more of the error signals ea, eb, ec, en is high. In the illustrated embodiment, E is an asynchronous signal.
A DQ flip-flop 150 is located on the substrate and is configured to receive a logical one into a D input thereof and the overall error signal E into a clock input thereof. A VMU 160 is located on the substrate and is configured to receive the overall error signal E via the DQ flip-flop 150. More specifically, when the overall error signal E transitions high (to a logical one), the DC flip-flop 150 transfers the logical one present at its D input to its Q output, providing the logical one to the VMU 160. The VMU 160 is configured to control one or more supply voltages associated with the one or more clock domains in the IC 100 based on the overall error signal E. The VMU 160 is also configured to reset the overall error signal E by providing a reset signal to the R input of the DQ flip-flop 150.
In the illustrated embodiment, the VMU 160 is configured to operate at startup or during operation of the IC 100. When power is first applied to the IC 100, the VMU 160 initially sets the supply voltage of the particular clock domain containing the paths a, b, c, n to a minimum level. If the VMU 160 then receives the overall error signal E, the VMU 160 responds by incrementally increasing the supply voltage and resetting the overall error signal E. This initialization process is repeated until the VMU 160 no longer receives the overall error signal E. The VMU 160 to configured to respond in a like manner should the overall error signal E become high during subsequent operation of the IC 100 (due for example to changes in operating temperature or aging); the VMU 160 incrementally increases supply voltage to the particular clock domain until the overall error signal E is no longer high.
The VMU 160 is also configured to operate such that supply voltage is adjusted dynamically during the operation of the IC 100. If one or more temperature sensors (not shown) in the IC 100 indicate that the IC 100 is operating at a higher-than-desired temperature, resulting path delays are likely to decrease, increasing the overall power consumption of the IC 100. To counter this, the VMU 160 undertakes to decrease overall power consumption by decreasing the supply voltage. Any resulting overall error signal E instructs the VMU 160 that the supply voltage needs to be increased. As the operating temperature of the IC 100 decreases, the VMU 160 can undertake to decrease the supply voltage and monitor the overall error signal E to ensure that the supply voltage is not insufficient. Alternative embodiments of the VMU 160 perform only one or some of these functions, perhaps with other functions not described herein.
In the illustrated embodiment, the various PMs 130a, 130b, 130c, 130n are configured such that they provide their respective error signals ea, eb, ec, en only when transition propagation speeds in their associated critical paths a, b, c, n are less than a predetermined minimum speed below which the IC 100 may not operate properly. Thus, the process by which the VMU 160 incrementally increases supply voltage until the overall error signal E is no longer high results in a supply voltage for the particular clock domain being set at a minimal functional level.
In the illustrated embodiment, the VMU 160 monitors and controls supply voltages of multiple clock domains in the IC in like manner. Therefore, the overall power consumption of the IC 100 is probably substantially less than were the supply voltages not to be so controlled.
One conventional PM is designed to work in conjunction with a clocked flip-flop located at the end of path that is to be monitored (the “path flip-flop”). The PM includes a clocked flip-flop (a “replica flip-flop”) that is identical to the path flip-flop and driven by the same clock. A delay element is coupled to the input of the path flip-flop to receive transitions provided to the path flip-flop. The delay element delays received transitions by a predetermined amount of time delay D, then provides them to the replica flip-flop. The clock drives the path flip-flop and the replica flip-flop in unison. As long as the transition propagation speed in the path is adequate, the outputs of the path and replica flip-flops are identical. If the transition propagation speed falls below a certain level, in other words, if the transition fails to arrive D time units before the end of a clock period, the outputs of the path and replica flip-flops differ. An unclocked XOR gate is coupled to the outputs of the path and replica flip-flops delay that produces a high output representing an error only when the two outputs differ.
In general, a PM should impact the performance of the IC 100 as little as possible. It should minimally load the path that it is monitoring. It should occupy relatively little area. Its power consumption should be low. It should be fast enough to provide accurate monitoring. Finally, it should resist aging. While the conventional PM works as intended, its replica flip-flop contains 26 transistors, and its XOR gate contains 12 transistors, for a total of 38 transistors. Given the desired attributes of a PM as outlined above, a PM having fewer transistors would be distinctly advantageous.
Various embodiments of a novel PM having about 63% fewer transistors will now be described.
Turning now to
The clocked XOR gate of
Compared to the unclocked XOR gate of the conventional PM described above, the clocked XOR gate of
To increase the speed at which the novel PM may be employed in new IC designs, the PM may be incorporated into a library of standard logic elements that may be employed to design ICs and masks for fabrication of ICs that contain many, perhaps thousands or even millions of PMs constructed according to the principles of the invention. The ICs may as a result exhibit a substantially reduced power consumption afforded not only by the fact that the PMs employ fewer transistors but also by the superior supply voltage management that results from using the PMs.
Although the various embodiments of the PM disclosed herein have been described in the context of monitoring signal propagation speed for the purpose of power management and increasing energy efficiency, PMs can also be used for speed-binning, frequency control, monitoring of circuit aging and other conventional purposes known to those skilled in the pertinent art or later-developed purposes.
Those skilled in the art to which the invention relates will appreciate that other and further additions, deletions, substitutions and modifications may be made to the described embodiments without departing from the scope of the invention.
This application is related to U.S. Provisional Application Ser. No. 61/126,881, filed by Parker, et al., on May 7, 2008, entitled “A Novel Paradigm for Optimizing Performance, Power, Area and/or Yield in Integrated Circuits,” commonly assigned with the invention and incorporated herein by reference.
Number | Date | Country | |
---|---|---|---|
61126881 | May 2008 | US |