Claims
- 1. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal which is positioned between the tubing hanger and the central bore above the production passageway; wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the first seal; wherein the second closure member and the second seal comprise a second pressure-containing barrier between the well bore and the environment; whereby both the first and the second barriers are associated with the tubing hanger; and wherein the first closure member comprises a first ring seal, the second closure member comprises a second ring seal, and both the first and second ring seals are mounted on a common plug body.
- 2. The flow completion system of claim 1, wherein the plug body is wireline deployable.
- 3. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal which is positioned between the tubing hanger and the central bore above the production passageway; wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the first seal; wherein the second closure member and the second seal comprise a second pressure-containing barrier between the well bore and the environment; whereby both the first and the second barriers are associated with the tubing hanger; an annulus bore which extends generally axially through the tubing hanger between the tubing annulus and a portion of the central bore that is located above the second seal; and an annulus closure member which is positioned in the annulus bore.
- 4. The flow completion system of claim 3, wherein:the annulus bore comprises a generally lateral first branch which is connected to a generally axial second branch; and the annulus closure member includes a gate that is moveable generally axially across the first branch between an open position in which a hole in the gate is aligned with the first branch and a closed position in which the hole is offset from the first branch.
- 5. The flow completion system of claim 4, further comprising:a conduit which extends generally axially through the body between the gate and the top of the tubing hanger; and an actuating mechanism for the gate which is positioned in the conduit.
- 6. The flow completion system of claim 5, wherein the actuating mechanism comprises:a piston which is movably disposed in the conduit and which is connected to the gate; means for conveying pressure to a first portion of the conduit to thereby move the gate from a first position to a second position; and means for moving the gate from the second position to the first position; wherein one of the first and second positions corresponds to the open position of the gate and the other position corresponds to the closed position of the gate.
- 7. The flow completion system of claim 6, wherein the moving means comprises a mechanical biasing means.
- 8. The flow completion system of claim 6, wherein the moving means comprises means for conveying pressure to a second portion of the conduit which is separated from the first portion of the conduit by the piston.
- 9. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal which is positioned between the tubing hanger and the central bore above the production passageway; wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the first seal; wherein the second closure member and the second seal comprise a second pressure-containing barrier between the well bore and the environment; whereby both the first and the second barriers are associated with the tubing hanger; and a tree cap which comprises an annular body and means for securing the body to at least one of the tubing hanger and the tubing spool; wherein the body comprises a plurality of radial sections and the tree cap comprises a number of elongated bolts which extend through the body and connect the radial sections.
- 10. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal which is positioned between the tubing hanger and the central bore above the production passageway; wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the first seal; wherein the second closure member and the second seal comprise a second pressure-containing barrier between the well bore and the environment; whereby both the first and the second barriers are associated with the tubing hanger; and a tree cap which comprises an annular body and means for securing the body to at least one of the tubing hanger and the tubing spool; wherein the tree cap further comprises an annulus seal stab for engaging an annulus bore which extends through the tubing hanger and communicates with the tubing annulus.
- 11. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal which is positioned between the tubing hanger and the central bore above the production passageway; wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the first seal; wherein the second closure member and the second seal comprise a second pressure-containing barrier between the well bore and the environment; whereby both the first and the second barriers are associated with the tubing hanger; and a tree cap which comprises an annular body and means for securing the body to at least one of the tubing hanger and the tubing spool; wherein the tree cap is sufficiently lightweight to be installed using an ROV.
- 12. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal which is positioned between the tubing hanger and the central bore above the production passageway; wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the first seal; wherein the second closure member and the second seal comprise a second pressure-containing barrier between the well bore and the environment; whereby both the first and the second barriers are associated with the tubing hanger; and a tree cap which comprises an annular body and means for securing the body to at least one of the tubing hanger and the tubing spool; wherein the body is comprised of a non-metallic material.
- 13. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal which is positioned between the tubing hanger and the central bore above the production passageway; wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the first seal; wherein the second closure member and the second seal comprise a second pressure-containing barrier between the well bore and the environment; whereby both the first and the second barriers are associated with the tubing hanger; wherein the tubing spool comprises an annulus outlet and an annulus passageway which provides for fluid communication between the tubing annulus and the annulus outlet; and wherein the tubing spool comprises a workover passageway which provides for fluid communication between the annulus passageway and a portion of the central bore that is located above the second annular seal.
- 14. The flow completion system of claim 13, further comprising:a tubing hanger running tool which is removably connectable to the tubing hanger and which includes a generally tubular body and a production port that extends axially through the body and communicates with the production bore; a BOP which is removably connectable to the top of the tubing spool and which includes a BOP bore, a set of BOP rams, and at least one choke and kill line that communicates with a portion of the BOP bore that is located below the BOP rams; wherein the BOP rams are adapted to sealingly engage the tubing hanger running tool; and wherein fluid communication between the tubing annulus and the BOP choke and kill line may be established through the annulus passageway, the workover passageway and the portion of the BOP bore which is located below the BOP rams.
- 15. The flow completion system of claim 14, wherein the tubing hanger running tool further comprises a cylindrical outer surface portion and an annulus port that comprises a first end which communicates with the workover passageway and a second end which communicates with the outer surface portion.
- 16. The flow completion system of claim 15, wherein the BOP rams are adapted to sealingly engage the outer surface portion above the second end of the annulus port, and wherein fluid communication between the tubing annulus and the BOP choke and kill line may be established through the annulus passageway, the workover passageway, the annulus port and the portion of the BOP bore which is located below the first BOP rams.
- 17. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which is positioned over the well bore and which includes an axially extending central bore and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a generally cylindrical body, a production bore that extends axially through the body, and a production passageway that communicates between the production bore and the production outlet; the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first pressure-containing barrier which is secured to the body of the tubing hanger above the production passageway; and a second pressure-containing barrier which is secured to the body of the tubing hanger above the first pressure-containing barrier; wherein each of the first and second pressure-containing barriers isolates both the production bore and the tubing annulus from a portion of the central bore that is located above the tubing hanger; and wherein the first pressure-containing barrier comprises a first ring seal, the second pressure-containing barrier comprises a second ring seal, and the first and second ring seals are mounted on a common plug body that is secured in the production bore.
- 18. The flow completion system of claim 17, wherein the plug body is wireline deployable.
- 19. A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising:a tubing spool which is positioned over the well bore and which includes an axially extending central bore and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a generally cylindrical body, a production bore that extends axially through the body, and a production passageway that communicates between the production bore and the production outlet; the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first pressure-containing barrier which is secured to the body of the tubing hanger above the production passageway; and a second pressure-containing barrier which is secured to the body of the tubing hanger above the first pressure-containing barrier; wherein each of the first and second pressure-containing barriers isolates both the production bore and the tubing annulus from a portion of the central bore that is located above the tubing hanger; wherein the tubing spool comprises an annulus outlet and an annulus passageway which provides for fluid communication between the tubing annulus and the annulus outlet; and wherein the tubing spool comprises a workover passageway which provides for fluid communication between the annulus passageway and a portion of the central bore that is located above the second pressure-containing barrier.
- 20. The flow completion system of claim 19 further comprising:a tubing hanger running tool which is removably connectable to the tubing hanger and which includes a generally tubular body and a production port that extends axially through the body and communicates with the production bore; a BOP which is removably connectable to the top of the tubing spool and which includes a BOP bore, a set of BOP rams, and at least one choke and kill line that communicates with a portion of the BOP bore that is located below the BOP rams; wherein the BOP rams are adapted to sealingly engage the tubing hanger running tool; and wherein fluid communication between the tubing annulus and the BOP choke and kill line may be established through the annulus passageway, the workover passageway and the portion of the BOP bore which is located below the BOP rams.
- 21. The flow completion system of claim 20, wherein the tubing hanger running tool further comprises a cylindrical outer surface portion and an annulus port that comprises a first end which communicates with the workover passageway and a second end which communicates with the outer surface portion.
- 22. The flow completion system of claim 21, wherein the BOP rams are adapted to sealingly engage the outer surface portion above the second end of the annulus port, wherein fluid communication between the tubing annulus and the BOP choke and kill line may be established through the annulus passageway, the workover passageway, the annulus port and the portion of the BOP bore which is located below the first BOP rams.
Parent Case Info
This application is a continuation of U.S. patent application Ser. No. 10/213,749 filed on Aug. 5, 2002, which is a continuation of U.S. patent application Ser. No. 09/815,437 filed on Mar. 22, 2001, now U.S. Pat. No. 6,494,257, which claims priority from U.S. Provisional Patent Application No. 60/192,124 filed on Mar. 24, 2000 and U.S. Provisional Patent Application No. 60/268,329 filed on Feb. 12, 2001.
US Referenced Citations (8)
Provisional Applications (2)
|
Number |
Date |
Country |
|
60/268329 |
Feb 2001 |
US |
|
60/192124 |
Mar 2000 |
US |
Continuations (2)
|
Number |
Date |
Country |
Parent |
10/213749 |
Aug 2002 |
US |
Child |
10/391846 |
|
US |
Parent |
09/815437 |
Mar 2001 |
US |
Child |
10/213749 |
|
US |