Abstract
A method and apparatus for producing schedules for a wafer in a multichamber semiconductor wafer processing tool comprising the steps of providing a trace defining a series of chambers that are visited by a wafer as the wafer is processed by the tool; initializing a sequence generator with a vertex defining initial wafer positioning within the tool; generating all successor vertices to produce a series of vectors interconnecting the vertices that, when taken together produce a cycle that represents a schedule. All the possible schedules are analyzed to determine a schedule that produces the highest throughput of all the schedules.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention relates to a multiple chamber wafer processing tool and, more particularly, to a method and apparatus for automatically generating a schedule(s) for a semiconductor wafer within a multiple chamber semiconductor wafer processing tool.




2. Description of the Background Art




Semiconductor wafers are processed to produce integrated circuits using a plurality of sequential process steps. These steps are performed using a plurality of process chambers. An assemblage of process chambers served by a wafer transport robot is known as a multiple chamber semiconductor wafer processing tool or cluster tool. Examples of cluster tools include the Centura® HDP CVD System and the Endura® system manufactured by Applied Materials, Inc. of Santa Clara, Calif.

FIG. 1

depicts, in part, a schematic diagram of the Endura® System.




The cluster tool


100


contains, for example, four process chambers


104


,


106


,


108


,


110


, a transfer chamber


112


, a preclean chamber


114


, a buffer chamber


116


, a wafer orienter/degas chamber


118


, a cooldown chamber


102


, and a pair of loadlock chambers


120


and


122


. Each chamber represents a different stage or phase of semiconductor wafer processing. The buffer chamber


116


is centrally located with respect to the loadlock chambers


120


and


122


, the wafer orienter/degas chamber


118


, the preclean chamber


114


and the cooldown chamber


102


. To effectuate wafer transfer amongst these chambers, the buffer chamber


116


contains a first robotic transfer mechanism


124


. The wafers


128


are typically carried from storage to the system in a plastic transport cassette


126


that is placed within one of the loadlock chambers


120


or


122


. The robotic transport mechanism


124


transports the wafers


128


, one at a time, from the cassette


126


to any of the three chambers


118


,


102


, or


114


. Typically, a given wafer is first placed in the wafer orienter/degas chamber


118


, then moved to the preclean chamber


114


. The cooldown chamber


102


is generally not used until after the wafer is processed within the process chambers


104


,


106


,


108


,


110


. Individual wafers are carried upon a wafer transport blade


130


that is located at the distal end of the first robotic mechanism


124


. The transport operation is controlled by a sequencer


136


.




The transfer chamber


112


is surrounded by and has access to the four process chambers


104


,


106


,


108


and


110


as well as the preclean chamber


114


and the cooldown chamber


102


. To effectuate transport of a wafer amongst the chambers, the transfer chamber


112


contains a second robotic transport mechanism


132


. The mechanism


132


has a wafer transport blade


134


attached to its distal end for carrying the individual wafers. In operation, the wafer transport blade


134


of the second transport mechanism


132


retrieves a wafer from the preclean chamber


114


and carries that wafer to the first stage of processing, for example, a physical vapor deposition (PVD) stage within chamber


104


. Once the wafer is processed and the PVD stage deposits material upon the wafer, the wafer can then be moved to a second stage of processing and so on.




Once processing is complete within the process chambers, the transport mechanism


132


moves the wafer from the process chamber and transports the wafer to the cooldown chamber


102


. The wafer is then removed from the cooldown chamber using the first transport mechanism


124


within the buffer chamber


116


. Lastly, the wafer is placed in the transport cassette


126


within the loadlock chamber


122


.




A cluster tool may be coupled to a factory interface comprising at least one factory interface robot, one or more metrology chambers/defect control chambers and one or more load ports, and one or more wafer orienting chambers. The factory interface is coupled to the load locks of the cluster tool.




More generally, a cluster tool contains n chambers, denoted by C


1


, C


2


, . . . , C


n


, one or more transfer chambers (robots)


112


and


116


, and one or more loadlocks


120


and


122


. The exact arrangement of chambers, robots and loadlocks is referred to as the “configuration” of the tool. A wafer W


a


to be processed is taken from a loadlock, placed successively into various chambers as each chamber performs a particular process upon the wafer.




A wafer's trace is the trajectory of a particular wafer through the cluster tool; that is, a trace is the order in which chambers are visited by a wafer (not necessarily C


i+1


after C


i


). This should be distinguished from the term “processing sequence” which is the order of applying processes (recipes) to a wafer. If more than one chamber performs the same process (parallel chambers), a given processing sequence may be satisfied by several different traces.




A wafer which completes its processing sequence and is returned to the loadlock is said to be processed by the tool. Roughly speaking, a tool's throughput is the number of wafers processed by the tool per unit of time. That is, if the tool needs t seconds to process n


t


wafers, then










S
t

:=


n
t

t





(
3
)













is the tool's throughput measured in the interval [0,t].




There are many ways to improve the tool's throughput for a given processing sequence. However, one important improvement is to use efficient scheduling routines for a given processing sequence.




The optimization of scheduling involves the choice of criteria used in deciding when to transfer a wafer from one chamber into the next (and which wafers should be moved, if any, prior to that move). A routine which schedules the movement of wafers through the cluster tool (based on a given processing sequence) is referred to as a “scheduling routine.”




The steady-state throughput of a tool under scheduling routine A is denoted by S(A). If n>1 then, depending on a given processing sequence, one may consider a number of scheduling routines that fulfill the processing sequence. The routine which maximizes the value of throughput is deemed the “optimum” routine and the maximum attainable value of throughput is known as the tool's “capacity.” That is, if A is the set of all possible scheduling routines for a given processing sequence, then A* is optimum if








S


(


A


*)=max{


S


(


A


)|


A∈A}


  (4)






Clearly, the tool's capacity S(A*) depends on a given processing sequence as well as on chamber and robot parameters within the processing sequence. The problem of finding efficient scheduling routines for a given processing sequence (especially, finding optimum routines, where possible) is of considerable practical importance.




Presently there is not an automatic method of determining the best schedule, given a particular trace, that provides the highest throughput for that trace. Typically, a trial and error method is used until a schedule is determined that provides a sufficient throughput. However, the sufficient throughput may not be the best throughput that is possible for a given trace.




Therefore, a need exists in the art for a method and apparatus that determines all possible schedules given a particular trace and, using a throughput modeling program determines the throughput for each of the possible schedules and selects a schedule for use within a cluster tool that provides the maximum throughput for the given trace.




SUMMARY OF THE INVENTION




The disadvantages heretofore associated with the prior art are overcome by an invention of a method and apparatus for determining all possible schedules that accomplish a given trace, applying a throughput model to each of the schedules, and determining the schedule or schedules that result in the highest throughput.




More specifically, a first embodiment of the invention uses a set of deterministic rules to compute the various schedules. First, a schedule is defined as a series of “letters” that form a “word”. Each letter in the word defines a possible positioning of wafers within a cluster tool. Of course, the positioning of the wafers within the tool must fulfill the trace, i.e., each letter must follow from a predecessor letter in accordance with a particular set of rules that define the trace.




Given a letter (input letter) representing present wafer positions, the invention computes all possible successor wafer positions, i.e., all possible valid successor letters, as well as the total number of successors for the input letter. The invention provides individual “modules” for successor computation for serial traces, parallel traces, and mixed traces. Using a backtracking technique to repeatedly compute, from any letter, all possible successor letters, and then compute all possible successor letters of the successor letters, a schedule tree is derived. The schedule tree contains all possible schedules that will fulfill a given trace. Each and every schedule can then be modeled to determine the expected throughput of each schedule. By comparing the throughput associated with each schedule, an optimal schedule or schedules is identified.




In a second embodiment of the invention, a method and apparatus performs successive application of three digraph based processes. First, a digraph G


N


({0,1}


N


,E) is formed to determine a directed edge from vertex {overscore (u)}∈{0,1}


N


to vertex {overscore (u)}∈{0,1}


N


only if {overscore (u)} and {overscore (v)} differ in at most two coordinates and {overscore (v)} is chosen by modifying {overscore (u)} according to the rules derived from a cluster tool's operation. N is the number of chambers in the tool, E is an edge set, u and v are coordinates representing wafer positions in the tool. Second, the invention determines simple cycles in G


N


({0,1}


N


,E) that correspond to various schedules for moving wafers through the system. Third, by using a throughput simulation program all possible cycles (schedules) are executed and the schedule that yields the highest throughput is chosen as an optimal schedule.











BRIEF DESCRIPTION OF THE DRAWINGS




The teachings of the present invention can be readily understood by considering the following detailed description in conjunction with the accompanying drawings, in which:





FIG. 1

depicts a schematic diagram of a multiple chamber semiconductor wafer processing tool being controlled by a sequencer that operates using scheduling routines generated by a schedule generator in accordance with the present invention;





FIG. 2

depicts block diagram of schedule generator that performs operative steps in accordance with the present invention;





FIG. 3

depicts a flow diagram of a 4-chamber serial trace;





FIG. 4

depicts a flow diagram of a 4-chamber mixed trace;





FIG. 5

depicts a flow diagram of a schedule optimization routine of the present invention;





FIG. 6

depicts a tree diagram representing all possible schedules for a 2-chamber serial trace;





FIG. 6A

depicts a schematic diagram of a 2-chamber serial trace of

FIG. 6

showing a wafer in position (1,0);





FIG. 7

depicts a tree diagram representing all possible schedules for a 3-chamber serial trace;





FIG. 7A

depicts a schematic diagram of a 3-chamber serial trace of

FIG. 7

showing a wafer in position (0,1,0);





FIG. 8

depicts a tree diagram representing all possible schedules for a trace: LL-C


1


-(C


2


, C


3


)-LL;





FIG. 8A

depicts a schematic diagram of a 3-chamber mixed trace of

FIG. 8

showing a wafer in position (1,1,0);





FIG. 9

depicts a tree diagram containing partial schedules as constructed using the present invention;





FIG. 10

depicts a flow diagram of a routine for producing all possible schedules for a given trace using a backtracking technique;





FIG. 11

depicts a chamber occupancy digraph associated with a two chamber serial wafer flow;





FIG. 11A

illustrates wafer positions in a 2-chamber cluster tool associated with the digraph of

FIG. 11

;





FIG. 12

depicts a chamber occupancy digraph associated with a three chamber serial wafer flow;





FIG. 12A

illustrates wafer positioning in a 3-chamber cluster tool associated with the digraph of

FIG. 12

;





FIG. 13

depicts a chamber occupancy digraph associated with a four chamber serial wafer flow;





FIG. 13A

illustrates wafer positioning in a 4-chamber cluster tool associated with the digraph of

FIG. 13

;





FIG. 14

depicts a chamber occupancy digraph associated with a LL-C


1


-(C


2


, C


3


)-LL wafer flow;





FIG. 14A

illustrates wafer positioning in a 3-chamber cluster tool associated with the digraph of

FIG. 14

;





FIG. 15

depicts a chamber occupancy digraph associated with a LL-(C


1


, C


2


)-C


3


-LL wafer flow;





FIG. 15A

illustrates wafer positioning in a 3-chamber cluster tool associated with the digraph of

FIG. 15

;





FIG. 16

depicts a digraph having an exponential number of simple cycles;





FIG. 17

depicts a flow diagram of a recursive enumeration process of the present invention;





FIG. 18

depicts an adjacency matrix for the digraph of

FIG. 11

;





FIG. 19

depicts a flow diagram of a backtrack process for identifying successor vertices to produce a digraph;





FIG. 20

depicts a chamber occupancy digraph and adjacency matrix for a chamber with a cleaning process;





FIG. 21

depicts a chamber occupancy digraph and adjacency matrix for a two chamber wafer flow with a cleaning process.











To facilitate understanding, identical reference numerals have been used, where possible, to designate identical elements that are common to the figures.




DETAILED DESCRIPTION




A. Overview of the Invention




As discussed above,

FIG. 1

depicts, in part, a schematic diagram of a conventional multiple chamber semiconductor wafer processing tool. The depicted cluster tool


100


is controlled by a sequencer that executes the scheduling routines determined by the present invention. The present invention is embodied in a schedule generator


50


that produces scheduling routines which are executed by the sequencer


136


.





FIG. 2

depicts a block diagram of the scheduling generator


50


that produces the scheduling routines executed by the sequencer to control the cluster tool


100


of FIG.


1


. Additionally, the schedule generator


50


operates to determine an optimal sequencing routine for a given processing sequence and tool configuration. Although, the schedule generator is shown to remotely produce schedules and download one or more schedules to the sequencer, those skilled in the art will understand that the invention could be practiced on a processor within the sequencer.




The schedule generator


50


contains a microprocessor


200


as well as memory


202


for storing a schedule generation routine


210


, a schedule optimization routine


212


and the scheduling routine(s) generated by routines


210


and


212


. The microprocessor


200


cooperates with conventional support circuitry


206


such as power supplies, clock circuits, cache, and the like as well as circuits that assist in executing the software routines. As such, it is contemplated that some of the process steps discussed herein as software processes may be implemented within hardware, e.g., as circuitry that cooperates with the microprocessor to perform various process steps. The schedule generator


50


also contains input/output circuitry


208


that forms an interface between conventional input/output (I/O) devices


214


such as a keyboard, mouse, and display as well as an interface to the sequencer. Although the schedule generator


50


is depicted as a general purpose computer that is programmed to determine scheduling routines in accordance with the present invention, the invention can be implemented in hardware as an application specific integrated circuit (ASIC). As such, the process steps described herein are intended to be broadly interpreted as being equivalently performed by software, hardware, or a combination thereof.




The automatic schedule generator


50


of the present invention executes a schedule generation routine


210


that generates all possible schedules for a given trace. A schedule optimization routine


212


facilitates an automated process of producing an optimum schedule for a given cluster tool using an exhaustive search of all possible schedules.




The following definitions are used throughout this disclosure:




“Tool configuration” describes physical placement of chambers within a cluster tool. For example, the tool may have chambers C


1, C




2


, C


3


and C


4


, a LoadLock (LL) as well as one or more robots.




“Process sequence” is the order in which processes are applied to a given wafer. For example, P


n


is the name of the n-th process (e.g., etch) and, P


1


, P


2


, P


3


, (which also may be written as P


1


→P


2


→P


3


) is a process sequence.




“Processing capability” of a cluster tool is the result of mapping a required process sequence onto the set of chambers within the tool. The image of this mapping is called a “trace”. For example, a process sequence P


1


→P


2


→P


3


may be mapped onto four chambers C


1


, C


2


, C


3


and C


4


to yield a trace




LL→C


1


→(C


2


vC


3


)→C


4


→LL.




Note that processes P


1


and P


3


are mapped into chambers C


1


and C


4


, respectively, while process P


2


is mapped into C


2


vC


3


(the process P


2


is performed in both C


2


and C


3


). Chambers C


2


and C


3


are said to be parallel because a wafer visits (is placed into) either C


2


or C


3


(but not both). In other words, the sign v in C


2


vC


3


represents an exclusive OR function.




“Stage” is a set of one or more chambers which correspond to the same process. Wafers visit exactly one chamber from a given stage. The notation (C


x


vC


y


vC


z


) means that wafers can move to either chambers C


x


or C


y


or C


z


, but only into one of the chambers. That is, (C


x


vC


y


vC


z


) is a stage comprised of three “parallel, chambers.




Generally speaking, the term “schedule” means a finite and repeatable sequence of wafer and robot movements through the cluster tool. More formally, let S be the set of all possible wafer and robot states. A string of symbols (letters) from a finite set of states S is referred to as a word. Symbols are represented as letters from the alphabet S. For example, if S={0,1}


2


, then (0,0), (0,1), (1,0), and (1,1) are all possible letters in alphabet S and (0,1) (1,1) (0,1) is a word having a length of 3 letters over S. Each letter identifies the instantaneous state of the tool. For example, as is discussed in detail below, a letter may define the particular positioning of a wafer or wafers within a tool at a particular point in the trace.




Broadly speaking, whatever the specific alphabet, a schedule S is represented as a word,




S=xyz . . . uv . . . urtx,




which starts and ends with the same letter (e.g., x), this is the only repeated letter, and a successor v of a given letter u must satisfy alphabet dependent rules, i.e., rules which define a valid trace.




Traces are available in three different configurations, A trace is parallel if it is comprised of exactly one stage; a trace is serial if each stage has exactly one chamber and a trace is mixed if it is neither serial nor parallel. (Clearly, to have a mixed trace, the number of chambers in the trace is at least three.) A trace is said to be knotted if there is a chamber whose name appears more than once in the trace (that is, the corresponding process sequence contains a processing loop). To illustrate,

FIGS. 3 and 4

schematically depict 4-stage serial and mixed traces, respectively.





FIG. 5

depicts a high level flow diagram of the schedule optimization routine


212


. The optimization routine contains a schedule generation routine


210


that produces all possible schedules in an alphabet induced by a given trace. Routine


212


is an automated process that performs the following steps:




a) Input a trace L (step


500


),




b) Produce all possible schedules over L (routine


210


) using a two step process, where the first step (step


508


) generates all possible successor positions (letters) to which a wafer can be moved from a present position (letter) and the second step (step


510


) uses a backtracking technique to change wafer positions such that other successor positions (letters) can be computed by step


508


,




c) Evaluate each of the schedules in (b) with respect to throughput (for a given set of robot and process parameters) (step


504


),




d) Record a schedule or a set of schedules which have the highest throughput for the given trace L (step


506


).




Since step (c) requires a throughput simulation program, for computational efficiency, steps (a), (b) and (d) are generally incorporated into the simulation program.




A plurality of embodiments of the present invention are discussed below in Sections B, C, D and E of this disclosure. Specifically, the definitions of a schedule in a {0,1}


n


alphabet, rules for generating successors of a given letter, and modules needed for computation of successors are given in Section B for a serial trace and Section C for mixed and parallel traces. In Section D, these processes are extended to include robot utilization in the computations. Lastly, a generalized backtracking routine for generating all possible schedules from a given trace, applicable to any trace with or without a robot, is presented in Section E.




B. Schedule Generation for Serial Traces Using n-Tuples




An n-chamber serial trace (as illustratively depicted in FIG.


3


), comprised of chambers C


1


, C


2


, . . . C


n


, is associated with an n-tuple from the alphabet {0,1}


n


. If {overscore (x)} is such a tuple, then, for i=1,2, . . . , n; {overscore (x)}[i]=0, if chamber C


i


is empty, and {overscore (x)}[i]=1, if C


i


contains a wafer. In accordance with this representation, a schedule S is a finite string of binary n-tuples,




S={overscore (x)} . . . {overscore (u)} {overscore (v)} . . . {overscore (x)},




which starts and ends with the same binary n-tuple and this is the only repeated n-tuple in the string. In addition, any two consecutive n-tuples {overscore (u)} and {overscore (v)} in the string, {overscore (v)} being a successor of {overscore (u)}, differ in at most two coordinates and are related in accordance with the following rules:




s


1


) If {overscore (u)}[1]=0, then {overscore (v)}[1]=1. For all k>1, {overscore (v)}[k]={overscore (u)}[k]. (This corresponds to a wafer being moved from the loadlock into C


1


.)




s


2


) If {overscore (u)}[n]=1, then {overscore (v)}[n]=0. For all k<n, {overscore (v)}[k]={overscore (u)}[k]. (This corresponds to a wafer being moved from C


n


into the loadlock).




s


3


) If, for some k∉{0,n}, {overscore (u)}[k]=1 and {overscore (u)}[k+1]=0, then {overscore (v)}[k]=0 and {overscore (v)}[k+1]=1. For all i∉{k,k+1}, {overscore (v)}[i]={overscore (u)}[i]. (This corresponds to a wafer being moved from C


k


into C


k≠1


.)





FIG. 6

illustrates all possible schedules available (i.e., two schedules) in a 2-chamber serial trace.

FIG. 6A

depicts a schematic diagram of the 2-chamber serial trace of

FIG. 6

having a wafer in position represented by the 2-tuple (1,0). These n-tuples are referred to herein as the coordinates of wafer positioning. From position (1,0), the schedule of

FIG. 6

dictates that the wafer is next moved to a position represented by the 2-tuple (0,1), i.e., a wafer is now in chamber C


2


and no wafer is in chamber C


1


. Thereafter, the schedule may follow one of two paths, either the wafer in C


2


is moved to the loadlock (a wafer positioning that is represented by 2-tuple (0,0)) or another wafer is moved into chamber C


1


(a wafer positioning that is represented by 2-tuple (1,1)). As such, each 2-tuple represents a set of possible positions for a wafer or wafers that validly fulfill a step in the trace.




Similarly,

FIG. 7

, illustrates the seven possible schedules available in a 3-chamber serial trace and

FIG. 7A

depicts a schematic diagram of the trace of

FIG. 7

having a wafer positioning represented by the 3-tuple (0,1,0). From

FIG. 7

, the strings




S


p


=(1,1,1) (1,1,0) (1,0,1) (0,1,1,) (1,1,1)




S


w


=(1,0,0) (0,1,0) (0,0,1) (0,0,0) (1,0,0)




S


x


=(1,0,1) (0,1,1) (0,1,0) (1,1,0) (1,0,1).




represents particular scheduling routines that are generated by the schedule generator for a three chamber serial trace.




Such schedules may contain a set of robot and chamber parameters that yield higher or lower throughput than other schedules in the set of all schedules. As such, the only way to determine an optimum schedule is to examine the throughput under all possible schedules and, using the optimization routine, determine which of the schedules is optimal.




As mentioned above, the 2


n


binary n-tuples (position coordinates) are regarded as letters from the alphabet {0,1}


n


. A finite string of letters is referred to as a word. For example, strings S


p


, S


w


, and S


x


are all 5-letter words. In this terminology, a partial schedule S of length k is a k-letter word S(


1


))S(


2


)) . . . S(k) in which next letter S(i+1) depends only on the previous letter S(i), i=1,2, . . . , k−1, and is built according to rules (s


1


) (s


2


), and (s


3


) stated above. In accordance with these rules, all letters in a partial schedule are different. A full schedule is a word W(


1


))W(


2


)) . . . W(n) such that W(


1


))W(


2


)) . . . W(n−1) is a partial schedule and W(n)=W(


1


)). For example, the word W=(1,1,1) (1,1,0) (1,0,1) (0,1,1) is a partial schedule, where W(


1


))=(1,1,1) and W(


4


)=(0,1,1). (Generally, if W={overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


, then W(i)={overscore (u)}


i


).




From the definition of a schedule, if {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


is a partial schedule, then {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (u)}


k+1


is also a schedule (partial or full) {overscore (u)}


k+1


is obtained from {overscore (u)}


k


according to rules (s


1


), (s


2


), and (s


3


). A given letter {overscore (u)}


k


may have anywhere from 1 to [n/2]=1 successors {overscore (u)}


k+1


. The number of successors (variable nmb below) is easily determined by the following function:




















function SerCount({overscore (u)}


k


:letter): integer;







var













i, nmb:integer;













begin













nmb:=0







for i:=1 to n−1













if {overscore (u)}


k


[i]=1 and {overscore (u)}


k


[i+1]=0







then nmb:=nmb+1;













nmb:=nmb+{overscore (u)}


k


[n] + ((1+{overscore (u)}


k


[1]) (mod 2))







return (nmb)













end;















where SerCount ({overscore (u)}


k


) represents the number of successors of {overscore (u)}


k


in a serial n-chamber trace. Since, in an exhaustive search, all the successors are examined, the foregoing pseudo-code determines the total number of successor letter that must be computed to complete an exhaustive search.




Generating all SerCount ({overscore (u)}) successors of a given letter {overscore (u)} is not particularly difficult. As each successor of {overscore (u)} is generated, it is stored in a binary matrix Z that has SerCount ({overscore (u)}) rows and (n+1) columns. The last column of Z is reserved for a Boolean variable that is set to true if the successor was not used. This entry is used later in the backtracking routine (discussed below with reference to

FIG. 10

) that generates all possible schedules for a given trace. The successors of a given letter are determined by the following function.




















function SerGenerator ({overscore (u)}:letter) : matrix;







var













i:integer;













begin













if {overscore (u)}[1] = 0 then begin







copy ({overscore (u)}, {overscore (v)});







{overscore (v)}[1] = 1;







store({overscore (v)}, Z);













end;







if {overscore (u)}[n] = 1 then begin













copy ({overscore (u)}, {overscore (v)});







{overscore (v)}[n] = 0;







store ({overscore (v)},Z);







end;







for i:=1 to n−1







if {overscore (u)}[i]=1 and {overscore (u)}[i+1]=0 then begin













copy ({overscore (u)}, {overscore (v)});







{overscore (v)}[1]=0; {overscore (v)}[i+1]:=1;







store ({overscore (v)},Z);













end;







return (Z);













end;















There are two functions which are used repeatedly in the above pseudo-code. Function copy ({overscore (u)},{overscore (v)}) returns letter {overscore (u)} that is a replica of letter {overscore (v)}. This manner of implementing rules (s


1


), (s


2


) and (s


3


), in which the routine first copies {overscore (u)} and {overscore (u)} and then modifies {overscore (u)}, is not inefficient because {overscore (u)} and {overscore (v)} differ in at most two coordinates. Function store ({overscore (v)},Z) copies letter {overscore (v)} into a proper row of matrix Z. Note that in the above module, the routine copies a binary n-tuple twice; clearly, in inplementation, the routine copies the successor of {overscore (u)} (slightly altered n-tuple {overscore (u)}) into the proper row of matrix Z directly.




Using the foregoing pseudo-code and given a letter {overscore (u)} in a serial trace, the pseudo-code generates all possible successor letters of {overscore (u)} and stores them in matrix Z. For example, in

FIG. 7

, given the letter (0,0,0), the e.g., letters (1,0,1), (0,1,0), (1,1,0), and (0,0,0). Given a different initial letter, a different valid set of successors is produced, e.g., letter (0,1,0) may produce letters (1,1,0), (1,0,1), (1,0,0) and (0,1,0).




C. Successor Generatin Using n-tuples




The representation of an n-chamber mixed trace by a binary n-tuple is slightly more involved because exactly one chamber from a given stage is visited by a wafer and there are no wafer transfers within the stage. Thus, the schedule generation routine must recognize different stages as well as parallel chambers within a stage.

FIG. 4

depicts an illustrative mixed trace containing four stages with six chambers, where chambers C


1


and C


4


are serial and chamber pairs C


2


(a), C


2


(b) and C


3


(a), C


3


(b) are parallel.




Without loss of generality, it is assumed that an n-chamber mixed trace is comprised of k successive stages, F


1


, F


2


, . . . , F


k


, k≦n. If 1,2, . . . , n are positions in a binary n-tuple {overscore (x)} that corresponds to chambers C


1


, C


2


, . . . , C


n


, respectively, then positions 1,2, . . . , |F


1


| corresponds to chambers in stage


1


, positions |F


1


|+1,|F


1


|+2, . . . |F


1


|+|F


2


| correspond to chambers in stage


2


, and so on. If chamber C


i


belongs to stage F


t


, then position i in the corresponding associated binary n-tuple {overscore (x)} belongs to F


t


and i∈F


t


(while, in fact, i is one of the consecutive |F


t


| positions in {overscore (x)}).




In this representation, a schedule is a finite string of binary n-tuples which starts and ends with the same binary n-tuple. This is the only repeated letter in the word. In addition, if {overscore (v)} is a successor of {overscore (u)}, then {overscore (u)} and {overscore (v)} differ in at most two coordinates and the following rules define the relationship of {overscore (u)} and {overscore (v)}:




m


1


) If for some i∈F


1


, {overscore (u)}[i]=0, then {overscore (v)}[i]=1. For all k≠i, {overscore (v)}[k]={overscore (u)}[k] (This corresponds to a wafer being moved from the loadlock into stage 1.)




m


2


) If for some i∈F


k


, {overscore (u)}[i]=1, then {overscore (v)}[i]=0. For all j≠i, {overscore (v)}[j]={overscore (u)}[j]. (This corresponds to a wafer being moved from the last stage F


k


into the loadlock).




m


3


) If for some i∈F


t


and some j∈F


t+1


, {overscore (u)}[i]=1 and {overscore (u)}[j]=0, then {overscore (v)}[i]0 and {overscore (v)}[j]=1. For all r∉{i,j}, {overscore (v)}[r]={overscore (u)}[r]. (This corresponds to a wafer being moved from stage F


t


into the next stage F


t−1


)




In determining the number of successors of a given letter {overscore (u)}, it will be handy to define a sequence M


o


=0 and




M


t


=|F


1


|+|F


2


|+ . . . +|F


t


|,




where |F


t


| is the size (number of chambers) of stage F


t


. The above sequence reflects the partition of the index set of {overscore (u)} into stages. Clearly, M


k


=n, where n is the number of chambers. The number of successors of {overscore (u)} is determined by the following function:




















function MixCount({overscore (u)}:letter):integer;







var













t, i, j, nmb:integer;













begin













nmb:=0







for i:=1 to M


1















if {overscore (u)}[i]= 0







then nmb:=nmb+1













for j:1+M


k−1


to M


k















if {overscore (u)}[i] = 1







then nmb:=nmb+1













for t:=1 to k−1







for i:=1+M


t−1


to M


t









for j:=1+M


t


to M


t+1















if {overscore (u)}[i] = 1 and {overscore (u)}[j] = 0







then nmb:=nmb+1;













return (nmb)













end;















Obviously, if M


t


=t and k=n in the above pseudo-code, then MixCount({overscore (u)}) becomes SerCount({overscore (u)}). Also, for a pure parallel n-chamber trace, due to k=1, the 3-nested “for” statements in the above pseudo-code are null; by joining the first two loops (since there is just one stage), the pseudo-code reduces to:




















function ParCount ({overscore (u)} : letter) : integer;







var













i,nmb:integer;













begin













nmb:=0;







for i:=1 to n













if {overscore (u)}[i] = 0 or {overscore (u)}[i] = 1







then nmb:=nmb+1;













return (nmb)













end;















which always returns nmb=n. Thus, in a pure parallel n-chamber trace, any given letter has n successors.




A function that generates and stores all successors of a given letter in a mixed trace is:




















function MixGenerator ({overscore (u)}:letter) :matrix;







var













t,i,j:integer;













begin













for i:=1 to M


1















if {overscore (u)}[i] = 0 then begin







copy ({overscore (u)}, {overscore (v)});







{overscore (v)}[i]:=1;







store({overscore (v)}, Z)













end;







for j:=1+M


k−1


to M


k















if {overscore (u)}[j]=1 then begin







copy({overscore (u)}, {overscore (v)});







{overscore (v)}[j]:=0;







store ({overscore (v)}, Z)













end;







for t:=1 to k−1







for i:=1+M


t−1


to M


t









for j:=1+M


t


to M


t+1















if {overscore (u)}[i] = 1 and {overscore (u)}[j] = 0 then begin







copy ({overscore (u)}, {overscore (v)});







{overscore (v)}[i]:=0; {overscore (v)}[j]:=1;







store ({overscore (v)}, Z)













end;







return (Z);













end;















Functions copy ({overscore (u)},{overscore (v)}) and store ({overscore (v)},Z) are the same as in the corresponding routine for serial traces. (Note that this time matrix Z has MixCountu rows and (n+1) columns.) Again, if M


t


=t and k=n in the above function, then MixGenerator({overscore (u)}) becomes SerGenerator({overscore (u)}). For pure parallel traces, due to k=1, a function that generates successors of a given letter {overscore (u)} is:




















function ParGenerator ({overscore (u)}: letter) :matrix;







var













i:integer;













begin













for i:=1 to n







begin













copy ({overscore (u)}, {overscore (v)});







if {overscore (u)}[i] = 1







then {overscore (v)}[i]:=0







else {overscore (v)}[i]:=1







store ({overscore (v)}, Z)













end;







return (Z)













end;















Note the similarity between functions that count successors and functions that generate successors. In fact, conditions for identifying a successor are identical in both types of function; the difference is what is performed once the condition is detected.





FIG. 8

depicts an illustrative schedule tree for a 3-chamber mixed trace, (e.g., LL→C


1


→(C


2


vC


3


)→LL), where the successors of a particular letter are determined using the MixGenerator({overscore (u)}) pseudo-code.

FIG. 8A

depicts a schematic diagram of the trace of

FIG. 8

having wafers positioned in position (1,1,0).




D. Successor Generation That Includes Robot Position




When the schedule generation routine includes robot movements, than to an n-chamber serial trace, comprised of chambers C


1


, C


2


, . . . , C


n


, the routine must associate a (n+1)-tuple from {0,1}


n


×{0,1 . . . , n}. If {overscore (x)} is such a tuple, then, for i=1,2, . . . , n, {overscore (x)}[i]=0, if chamber C


i


is empty; and {overscore (x)}[i]=1, if C


i


contains a wafer. Thus, as before, the first n coordinates of {overscore (x)} are from {0,1}. The robot position is described by the last coordinate of {overscore (x)}, i.e., x


3


in the 3-tuple (x


1


,x


2


;x


3


), where x


1


and x


2


are wafer coordinates and x


3


is a robot coordinate. We set {overscore (x)}[n+1]=k if (and only if) the robot is in a home position at chamber C


k


. If {overscore (x)}[n+1]=0, the robot is positioned at the loadlock.




Let S


n


represent the alphabet of the above association. For example, if n=2, then S


2


is comprised of twelve 3-tuples, namely,




S


2


={(0,0;0), (0,0;1), (0,0;2); (0,1;0), (0,1;1), (0,1;2); (1,0;0), (1,0;1), (1,0;2); (1,1;0), (1,1;1), (1,1;2)}.




For an n-chamber serial trace, |S


n


| is the number of (n+1)-tuples from {0,1}


n


({0,1, . . . , n} and thus |S


n


|=(n+1)2


n


. These (n+1)-tuples are referred to as letters from the alphabet S


n


. As before, a word is a finite string of letters from S


n


. For example,




(0,0;0) (1,0;1) (0,1;2) (0,1;0) (1,1;1) (1,1;2) (1,0;0) (1,0;1)




is an 8-letter word. Note that a word may contain repeated letters. For example, abcdaxy is a word, but not a schedule.




In this representation, a schedule S is a word (a string of the above described (n+1)-tuples),




S={overscore (x)}{overscore (z)} . . . {overscore (u)}{overscore (v)} . . . {overscore (y)}{overscore (x)} . . . ,




which starts and ends with the same letter and this is the only repeated letter. Furthermore, any two consecutive letters {overscore (u)} and {overscore (v)}(where {overscore (v)} is a successor of {overscore (u)}) differ in at most three coordinates and are related in accordance with the following rules:




a) If {overscore (u)}[1]=0 and {overscore (u)}[n+1]=0, then {overscore (v)}[1]=1 and {overscore (v)}[n+1]=1. For all i∉{1,n+1}, {overscore (v)}[i]={overscore (u)}[i]. (This correspondence to a wafer being moved from the loadlock to C


1


.)




b) If {overscore (u)}[n]=1 and {overscore (u)}[n+1]=n, then {overscore (v)}[n]=0 and {overscore (v)}[n+1]=0. For all i∉{n,n+1}, {overscore (v)}[i]={overscore (u)}[i]. (This corresponds to a wafer being moved from C


n


into the loadlock.)




c) If for some r∉{0,n}, {overscore (u)}[r]=1 and {overscore (u)}[r+1]=0 and {overscore (u)}[n+1]=r, then {overscore (v)}[r]=0 and {overscore (v)}[r+1]=1 and {overscore (v)}[n+1]=r+1. For all i∉{r,r+1,n+1}, {overscore (v)}[i]={overscore (u)}[i]. (This corresponds to a wafer being moved from C


k


into C


(k+1)


, where neither C


k


nor C


(k+1)


is a loadlock.)




d) If {overscore (u)}[1]=0 and {overscore (u)}[n+1]=j where j≠0, then {overscore (v)}[n+1]=0. For all i≠n+1, {overscore (v)}[i]={overscore (u)}[i]. (This corresponds to a robot moving from home position at C


j


to a home position at a loadlock in preparation for a wafer moving from the loadlock into C


1


.)




e) If {overscore (u)}[n]=1 and {overscore (u)}[n+1]=j where j≠n, then {overscore (v)}[n+1]=n. For all i≠n+1, {overscore (v)}[i]={overscore (u)} [i]. (This corresponds to a robot moving from a home position at C


j


to a home position at C


n


in preparation for a wafer move from C


n


into loadlock.)




f) If for some r∉{0,n}, {overscore (u)}[r]=1 and {overscore (u)}[r+1]=0 and {overscore (u)}[n+1]=j where j≠r, then {overscore (v)}[n+1]=r. For all i≠n+1, {overscore (v)}[i]={overscore (u)}[i]. (This corresponds to a robot moving from a home position at C


i


to a home position at C


r


in preparation for a wafer moving from C


r


into C


r+1


; C


o


represents the loadlock.)




Note that rules (a), (b), and (c) above are, in fact rules (s


1


), (s


2


), and (s


3


), respectively, when the robot is already prepositioned to move a wafer, while (d), (e), and (f) correspond to prepositioning the robot for moves defined by rules (a), (b), and (c), respectively.




A routine that calculates the number of successors of a given letter as well as finds and stores these successors is designed in a similar manner as in the previous cases for mixed and serial traces (this time by following the steps (a) through (f)). In such a routine, the number of successors is considerably large because, every time a wafer transfer is possible (e.g., {overscore (u)}[i]=0 or {overscore (u)}[n]i=1 or {overscore (u)}[i]=1 and {overscore (u)}[i+1]=0, a robot may have to be prepositioned (e.g., from any of the n−1 positions j≠0 or j≠n or j≠i). To achieve routines for determining the number of successors and the successors themselves that includes robot position, the new functions used are modifications of SerCount({overscore (u)}) and SerGenerator({overscore (u)}) (or MixCount({overscore (u)}) and MixGenerator({overscore (u)})). Given the foregoing description of SerCount({overscore (u)}), SerGenerator({overscore (u)}), MixCount({overscore (u)}) and MixGenerator({overscore (u)}), a person skilled in the art could readily modify these functions to account for robot position using the aforementioned rules (a)-(f).




E. Generating Schedules From A Trace Using a Backtracking Technique




Backtracking algorithms use special problem-tailored techniques to systematically explore implicitly directed graphs (usually trees). Such algorithms are well known in the art. In the schedule generation routine, a backtracking algorithm is used in conjunction with one or more of the previously discussed successor generation routines (e.g., SerGenerator({overscore (u)}) or MixGenerator({overscore (u)})) to produce every possible schedule given a particular trace.




Let {overscore (u)}


1


be the starting letter of a schedule. By using the rules for adding a successor letter as discussed in Sections B, C or D above, the foregoing routines build a partial schedule, say S={overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


. There are two questions to answer every time a new letter {overscore (u)}


k+1


is added to partial trace S:




a) Is {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (u)}


k+1


a full schedule?




b) If {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (u)}


k+1


is a full schedule, are there other full schedules which have not been recorded?




A word {overscore (u)}


1


{overscore (u)}


k+2


. . . {overscore (u)}


k+1


is recognized as a full schedule if it is built according to rules for successor letters and if there exists an index i<k+1 such that {overscore (u)}


i


={overscore (u)}


k+1


and all letters {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


are different. Thus, to determine a full schedule a routine checks whether or not




{overscore (u)}


k+1


≠{overscore (u)}


i


, i=1,2, . . . , k,




for every newly appended letter {overscore (u)}


k+1


which is a proper successor of {overscore (u)}


k


.




Once it is found that {overscore (u)}


i


={overscore (u)}


k+1


for some i<k+1, the routine either prints or stores the full schedule {overscore (u)}


i


{overscore (u)}


i+1


. . . {overscore (u)}


k+1


. To find other schedules, the routine removes {overscore (u)}


k+1


from the full schedule S and looks at some other unused successor of {overscore (u)}


k


. If there is such a successor, say letter {overscore (z)}, the routine checks if {overscore (u)}


1


. . . {overscore (u)}


k


{overscore (z)} is a full schedule. If {overscore (u)}


1


. . . {overscore (u)}


k


{overscore (z)} is not a full schedule, the routine looks at unused successors of {overscore (z)} and so on. If {overscore (u)}


1


. . . {overscore (u)}


k


{overscore (z)} is a full schedule, the routine removes {overscore (z)} and looks at another unused successor of {overscore (u)}


k


. If there are no unused successors of {overscore (u)}


k


, the routine goes back (backtrack) and looks at unused successors of {overscore (u)}


k−1


and so on, until the routine returns to the starting letter {overscore (u)}


1


. Basically, the routine contains the following sequence of steps:




1. (Initialize.) Choose the letter {overscore (u)}


1


of a schedule and go to Step 2.




2. If schedule {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


is not complete, go to step 3. Else, go to Step 4.




3. Find a successor letter (of the last letter {overscore (u)}


k


, in the schedule) which was not used, append it to the partial schedule and go to Step 2. If there are no unused successors, go to step 5.




4. Print or store the schedule and go to Step 5.




5. If there are no more schedules, then STOP. Else, go to Step 6.




6. (Backtrack.) Remove the last letter from the complete schedule and go to Step 3.




Clearly, the routine must ensure that it does not print (store) duplicate schedules in Step 4 as well as that the routine has printed (stored) all possible schedules. The former is accomplished in Step 3 where the routine appends only an unused successor of the last letter to the partial schedule. The latter is ensured by a proper termination condition (for example, the routine is at {overscore (u)}


1


(the initial letter) and there are no unused successors). It is convenient to choose the first letter {overscore (u)}


1


so that it has only one successor, e.g., {overscore (u)}


1


={overscore (O)} or {overscore (e)}


1


, where {overscore (e)}


k


is the k-th column (row) of an n by n identity matrix.




For example, as illustrated in

FIG. 9

, starting with letter {overscore (O)}, the routine builds a tree whose nodes are letters. If {overscore (x)} is such a node, the children of {overscore (x)} are successors of a letter {overscore (x)} and, for serial traces, there are exactly SerCount({overscore (x)}) of the successors. As such, the routine produces {overscore (O)}, {overscore (O)}{overscore (e)}


1


and {overscore (O)}{overscore (e)}


1


and {overscore (O)}{overscore (e)}


1


{overscore (e)}


2


as successive partial schedules. (The word {overscore (O)}{overscore (e)}


2


is a directed path from node {overscore (O)} to node {overscore (e)}


2


.) Since {overscore (e)}


1


+{overscore (e)}


2


and {overscore (e)}


3


are successors (children) of {overscore (e)}


2


, words {overscore (O)}{overscore (e)}


1


{overscore (e)}


2


({overscore (e)}


1


+{overscore (e)}


2


) and {overscore (O)}{overscore (e)}


1


{overscore (e)}


2


{overscore (e)}


3


are partial schedules as well. Now, {overscore (e)}


3


has two successors ({overscore (e)}


1


+{overscore (e)}


3


and {overscore (e)}


4


), while {overscore (e)}


1


+{overscore (e)}


2


has only one successor ({overscore (e)}


1


+{overscore (e)}


3


). Hence, {overscore (O)}{overscore (e)}


1


{overscore (e)}


2


({overscore (e)}


1


{overscore (e)}


2


) ({overscore (e)}


1


+{overscore (e)}


3


) and {overscore (O)}{overscore (e)}


1


{overscore (e)}


2


{overscore (e)}


3


({overscore (e)}


1


+{overscore (e)}


3


) and {overscore (O)}{overscore (e)}


1


{overscore (e)}


2


{overscore (e)}


3




{overscore (e)}




4


are all partial schedules and so on.




As mentioned previously, letters comprising a given word (or partial schedule) S are distinguished by their positions; so S(


1


) is the first letter in S, S(


2


)) is the second, and so on. The level of a search tree is denoted by L this is also the length of a partial schedule. Partial schedules of length L are thus paths of length L in a search tree. Function scnt({overscore (x)}) returns the number of successors of {overscore (x)}. As such scnt({overscore (x)}) is either SerCount({overscore (x)}) or MixCount({overscore (x)}) or either of these for a model which includes robot movements. If S is a partial schedule of length L, then S+w or Sw is a partial schedule of length L+1 and S(L+1)=w. Similarly, if length of S is L and S(L)=w, then S−w has length L−1 (in short, + means append a letter and − means remove a letter).




Finally, a commitment to data organization (structure) is necessary in an efficiently designed routine. Keep in mind that the number of chambers (and thus the number of successors of a given word) is relatively small. Thus, it does not make any difference if the routine generates all successors of a given letter and stores them, as opposed to dynamically generating the successors one-by-one as the need arises.




A basic schedule generator routine can be summarized by the following five steps:




1. Initialize the schedule: S←{overscore (O)} and L←1 and go to Step 2.




2. {overscore (x)}←S(L) and δ←cnt({overscore (x)}). Store δ successors of {overscore (x)}, {overscore (y)}


1


, {overscore (y)}


2


, . . . , {overscore (y)}


6


, and mark them unused. Go to Step 3.




3. S←S+{overscore (y)}


1


and L←L+1 and δ←δ←1. Mark {overscore (y)}


1


used and go to Step 4.




4. Compare S(L) with S(


1


), S(


2


),. . . ,S(L−1), respectively. If S(i)=S(L) for some i<1, print S and L and go to Step 5; else, go to Step 2.




5. S←S-S(L) and L←L−1. If L=1, STOP; else, go to Step 6.




6. If δ=0, go to Step 5. Else (δ>0), append an unused successor of S(L) to S, mark it used, δ←δ−1, and go to Step 2.




In step 1, the routine initializes the schedule, S, and the level of the search tree, L. Clearly, L must be initialized to 1. As for the initial letter in schedule S, for convenience, the routine uses a letter that has only one successor. A letter {overscore (O)} corresponds to a situation in which all chambers are empty (i.e., the tool has just begun processing wafers).




In step 2, the routine first finds the number of successors, δ, of the last letter, say {overscore (x)}, in a partial schedule S(clearly, {overscore (x)}=S(


1


)). Function cnt({overscore (x)}) returns the number of successors of a given letter {overscore (x)}. Then, by using the rules which determine the successor of a given letter, the routine finds, stores and marks unused successors of {overscore (x)}. As a result, a successor may be a record with two fields: the first field is the actual letter, while the second field is a Boolean variable with value true if the successor was not used in a particular partial schedule S and value false otherwise. (Or the routine may use a matrix representation for the list of successors as described in Sections C and D above.)




In step 3, one of the unused successors of the last letter {overscore (x)} is appended to the partial schedule S, the length of schedule L is increased by 1 and the number of unused successors of {overscore (x)} is decreased by 1. (There will always be at least one successor to any given letter.)




In step 4, the routine checks if S is a full schedule by comparing the newly added (the last) letter S(L) with all previous letters S(


1


), S(


2


), . . . , S(L−1). (That should be accomplished every time a new letter is appended to a partial schedule.) If S(L) is a repeated letter, the routine prints (stores) the schedule; else, the routine continues with building the schedule.




When a partial schedule becomes a full schedule, S(


1


)) S(


2


)) . . . S(L), after storing the schedule, the routine removes the last letter S(L) and look for some other unused successor of S(L−1). If there are some unused successors, the routine appends a successor to the partial schedule, finds its successors, appends one of these successors and so on. If there are no successors, the routine removes S(L−1) from S and looks for unused successors of S(L−2) and so on. The program terminates when L=1 and δ=0 (meaning there are no unused successors of the first letter).




The routine above is valid for any representation of the scheduling problem. That is, either serial or mixed traces with letters from {0,1}


n


or either of these traces with robot position being part of the model (and thus alphabet from {0,1}


n


×{0,1 . . . , n}). Clearly, functions that count and generate successors of a given letter are different each time.





FIG. 10

depicts a flow diagram of a schedule generation routine


1000


that operates as generally discussed above. The routine


1000


begins at step


1002


by initializing the schedule, e.g., setting an initial letter to an n-tuple (n-string) of zeros. At step


1004


, the routine finds, stores and marks all unused successors of the last letter in a partial schedule. The successor letters are determined using the pseudo-code routines SerGenerator, ParGenerator and MixGenerator and the number of successor letters for each letter is determined using SerCount, ParCount and MixCount. Of course, as mentioned above, if the robot position is to be taken into account, these pseudo-code routines must be appropriately modified to accommodate the expanded letters and the modify rules of successor generation.




Then, at step


1006


, the routine appends an unused successor of the last letter to a partial schedule as well as increases the length of the schedule by one and decreases the number of unused successors by one. The routine queries, at step


1008


, whether the last letter of the partial trace has been reached. If the query is negatively answered, the routine proceeds along the NO path to step


1004


. If the query is affirmatively answered, the routine proceeds to step


1010


where the schedule is either printed or stored.




Steps


1012


,


1014


,


1016


and


1018


represent a backtracking process. At step


1012


, the routine removes the last letter of the schedule to produce a partial schedule and reduce the schedule length by one. Then, at step


1014


, the routine queries whether the length of schedule is one. If the query is affirmatively answered, the routine stops at step


1016


. However, if the query is negatively answered, the routine proceeds to step


1018


. At step


1018


, the routine queries whether there is an unused successor to the last letter. If the query is negatively answered, the routine proceeds along the NO path to step


1012


. Otherwise, the routine proceeds to step


1020


where an unused successor is appended to the partial schedule. The routine then returns to step


1004


.




Once all possible schedules are determined and stored in memory, the schedules are processed by a conventional throughput model. Specifically, each schedule is used by the model to predict a throughput for that schedule. The throughputs for all the schedules are compared to find the schedule having the highest (best) throughput. The schedule with the highest throughput is deemed optimal and is used to control the sequencer. The throughput model may be executed upon the sequencer computer or, more likely, it is executed on a remote computer, and the optimal schedule is downloaded to the sequencer.




E. Schedule Generation Using Digraphs




In another embodiment of the invention, the schedule generation process is performed using digraphs that represent a plurality of schedules that are available for a particular cluster tool configuration. As stated above, if there are n chambers in the system, denoted by C


1, C




2


, . . . , C


n


, then the invention uses a vector {overscore (u)}∈{0,1}


n


to describe the state-occupancy of the wafer processing system (cluster tool). That is, if there is a wafer in chamber C


k


, then {overscore (u)}


k


=1, else (chamber empty) the invention sets {overscore (u)}


k


=0. This schedule is defined as a finite string of binary n-tuples,




{overscore (x)} . . . {overscore (u)}{overscore (v)} . . . ,




which starts and ends with the same binary n-tuple and this is the only repeated n-tuple. Any two consecutive n-tuples {overscore (u)} and {overscore (v)}in the schedule, {overscore (v)} being a successor of {overscore (u)} and denoted by {overscore (u)}=s({overscore (u)}), will differ in at most two coordinates.




The length of a schedule is the number of different binary vectors comprising it. For example, {overscore (x)}{overscore (a)}


1


{overscore (a)}


2


{overscore (a)}


3


{overscore (x)} is a schedule of length four, if {overscore (a)}


1


=s({overscore (x)}) and {overscore (a)}


j+1


=s({overscore (a)}


j


) for j=1,2, and {overscore (x)}=s({overscore (a)}


3


).




The following disclosure, for example, considers two set of rules (cases) in choosing a successor occupancy vector. The examples correspond to a serial and a mixed wafer flow, respectively. Parallel flows need not be considered since their optimum scheduling algorithm is well-known.




1) Serial Wafer Flow




In a serial wafer flow, s={s


1


,s


2


,s


3


} and the successor occupancy-vector {overscore (v)}=s({overscore (u)}) is chosen according to the following three rules:




s


1


) If {overscore (u)}[1]=0, then {overscore (v)}[1]=1. For all k=2,3, . . . n, {overscore (v)}[k]k={overscore (u)}[k].




s


2


) If {overscore (u)}[n]=1, then {overscore (v)}[n]0. For all k=1,2, . . . n−1, {overscore (v)}[k]={overscore (u)}[k].




s


3


) If {overscore (u)}[i]=1 and {overscore (u)}[i+1]=0, then {overscore (v)}[i]=0 and {overscore (v)}[i+1]=1. For all {overscore (k)}∉{i,i+1}, {overscore (v)}[k]={overscore (u)}[k].




For example, according to the above rules s[(001)]={(101), (000)} and s[(010)]={(110), (001)} for a serial 3-chamber wafer flow. It is easy to see that number of successors of any given state cannot exceed [(n+1)/2] for a serial n-chamber wafer flow. For example, vector (0101) has three successors, namely (1101) and (0100) and (0011). They are obtained by applying s


1


and s


2


and s


3


, respectively. The above rules s


1


,s


2


,s


3


correspond to a wafer being moved from a load-lock into the first chamber C


1


, from the last chamber C


n


into the load-lock, and from the chamber C


i


into the successor chamber C


i+1


, respectively.




In graph theoretic terms, the above formulation is even simpler. With n>1, let G


n


(V,E) be the directed graph (herein referred to as a digraph) with vertex set V={0,1}


n


and edge set E given as follows:




with {overscore (u)}=(u


1


,u


2


, . . . , u


n


) and {overscore (v)}=(v


1


,v


2


, . . . , v


n


),







(


u
_

,

v
_


)



E


{






u
1

=
0

,


v
1

=
1

,






u
i

=


v
i







(

i

1

)



,








u
n

=
1

,


v
n

=
0

,






u
i

=


v
i







(

i

n

)



,








(


u
k

,

u

k
+
1



)

=

(

1
,
0

)


,






for





some





k




[

1
,
n


)


,








(


v
k

,

v

k
+
1



)

=

(

0
,
1

)


,





u
i

=


v
i








(


i

k

,

k
+
1


)

.


















Diagrams of G


2


, G


3


and G


4


are shown in FIGS.


11


,


12


and


13


, respectively.

FIGS. 11A

,


12


A, and


13


A illustrate wafer positioning within the cluster tool, where an empty circle represents an empty chamber and a circle containing a dot represents a chamber containing a wafer. Let f(n)=Σ


C


l(C), where the sum is over all cycles in G


n


(V,E)and l(C)denotes the length of a cycle C. Direct enumeration (by an algorithm to be discussed in detail below) gives f(


2


)=6, f(


3


)=24, f(


4


)=180, f(


5


)=29,112, and j(


6


)=1,025,039,736.




A schedule is then a finite string {overscore (x)} . . . {overscore (u)}{overscore (v)} . . . {overscore (x)} corresponding to a cycle in G


n


(V,E) that starts and ends at {overscore (x)}. Hence, f(n) is the total number of schedules. If {overscore (v)} is the immediate successor of {overscore (u)} in the schedule, then {overscore (u)} and {overscore (v)} differ in at most two coordinates, and v must be chosen according to the above rules (s


1


,s


2


,s


3


). These rules give rise to the requirements for ({overscore (u)},{overscore (v)})∈E(G


n


).




A digraph G


n


(V,E) defined above has the property that the length of each cycle in it is a multiple of n+1 where n is the number of stages. To see this, assign to each vertex {overscore (u)} a corresponding weight w({overscore (u)})=Σ


k


ku


k


. From the above description of G


n


(V,E), if ({overscore (u)}u,{overscore (v)}) is any edge of G


n


(V,E), then either




1) w({overscore (v)})−w({overscore (u)})=1, or




2) w({overscore (v)})−w({overscore (u)})=−n.




Suppose there is a cycle of length r. If this cycle contains k edges ({overscore (u)},{overscore (v)}) where (


2


) above holds, then (r−k)×1+(−n)×k=0, and hence r=k×(n+1).




Distribution of cycle lengths in G


n


(V,E) is not known. For example, all cycles in G


2


(V,E) have length three, all cycles in G


3


(V,E) have length four, and in G


4


(V,E) there are 24 cycles of length five and six cycles of length ten. The estimate for the length of the longest cycle in G


n


(V,E)is not known either. At present, even the estimates or bounds for f(n) seem to be out of reach.




2) Mixed Wafer Flow




Without loss of generality, in a mixed wafer example, it is assumed that an n-chamber mixed wafer flow is comprised of k successive stages (or families), F


1


, F


2


, . . . , F


k


, where k≦n. If 1,2, . . . , n are positions in a binary n-tuple {overscore (x)} that correspond to chambers C


1, C




2


, . . . , C


n


, respectively, then make positions 1,2, . . . , |F


1


| correspond to chambers in stage (family) 1, positions |F


1


|+1,|F


1


|+2, . . . , |F


1


|+|F


2


| correspond to chambers in stage (family) 2, and so on. If chamber C


i


belongs to stage (family) F


t


, then the position i in the associated binary n-tuple {overscore (x)} belongs to F


t


and write i∈F


t


(while, in fact, i is one of the |F


t


| consecutive positions in {overscore (x)}).




In this mixed flow example, s={m


1


,m


2


,m


3


} and the successor occupancy vector {overscore (v)}=s({overscore (u)}) is chosen according to the following rules:




m


1


) If for some i∈F


1


and {overscore (u)}[i]=0, then {overscore (v)}[i]=1. For all k≠i, {overscore (v)}[k]={overscore (u)}[k].




m


2


) If for some i∈F


k


{overscore (u)}[i]=1, then {overscore (v)}[i]=0. For all j≠i, {overscore (v)}[j]={overscore (u)}[j].




m


3


) If for some i∈F


t


and for some j∈F


t+1


{overscore (u)}[i]=1 and {overscore (u)}[j]=0, then {overscore (v)}[i]=0 and {overscore (v)}[j]=1. For all r∉{i,j}, {overscore (v)}[r]={overscore (u)}[r].




For example, if |F


1


|=2 and |F


2


|=1, then s[(001)]={(101), (000), (011)} and s[(100)]=s[(010)]={(110), (001)}, which is quite different than the case |F


t


|=1 for t=1,2,3. The above rules {m


1


,m


2


,m


3


} correspond to a wafer being moved from load-lock into the stage (family) 1, from the last stage (family) F


k


into the load-lock, and from the stage (family) F


t


into the next stage (family) F


t+1


, respectively. Clearly, if |F


t


=1 for all t=1,2, . . . , k, then {m


1


,m


2


,m


3}={s




1


,s


2


,s


3


}.




For mixed wafer flows, the two smallest possible configurations (two chambers in the first stage-and one in the second stage and vice versa) have been examined. Their associated digraphs are shown in

FIGS. 14 and 15

and

FIGS. 14A and 15A

illustrate wafer positions within the cluster tools. The set of all schedules can be divided into equivalence classes under a “cyclic shift” operation. A class is comprised of a schedule Q and all schedules derived from Q by applying the successor occupancy vector rules m


1


,m


2


and m


3


so that all letters are on the same simple cycle of the associated digraph. By inspection, from

FIGS. 14 and 15

, it can be seen that for the smallest 2-stage mixed wafer flow schedules are either of length three or six.




As already mentioned, once the simple cycles are listed, the invention tests each cycle for throughput by using a throughput simulator. The cycle yielding maximum throughput is then deemed the optimum schedule. The importance of schedules found by the above method is that one cannot do better by scheduling wafers any other way. This conclusion can be formalized in the following statement:




The optimum schedule produced by evaluation of simple cycles is globally optimal, i.e., there is no cycle in the associated digraph G({0,1}


n


,E) yielding smaller throughput than the optimum simple cycle.




To prove the above statement, note that as wafers are being moved through the cluster tool, the digraph G({0,1}


n


,E), is being traversed (from a vertex {overscore (x)} to one of the vertices in s({overscore (x)}) to one of the vertices in s({overscore (y)}), where {overscore (y)}∈s({overscore (x)}), and so on). Hence, given a sufficient number of wafers, there will be a vertex in G({0,1}


n


,E) which is visited twice. (This is because the number of vertices in G({0,1}


n


,E) is 2


n


, where n is the number of chambers.) Any such cycle is a union of simple cycles and thus its corresponding throughput is the sum of throughputs of the simple cycles. It then follows from the fact that the sum of any M non-negative numbers (throughputs) is larger than M times the smallest number (throughput).




F. Schedule Determination Using Digraphs




As discussed above, the problem of finding an optimum schedule calls for finding all simple cycles in G({0,1}


n


,E) whose vertices are occupancy-vectors from {0,1}


n


and whose edges are defined by either {s


1


,s


2


,s


3


} or by {m


1


,m


2


,m


3


} rules. That is, for any pair of vertices {overscore (x)},{overscore (y)}∈{0,1}


n


there is an edge from {overscore (x)} to {overscore (y)} if and only if {overscore (y)}∈s({overscore (x)}). The schedules then correspond to simple cycles in G({0,1}


n


,E).




The number of cycles in a digraph can be exponential in the number of vertices. For example, it is known that the complete digraph of n vertices and (n−1) edges contains







(



n




i



)




(

i
-
1

)

!











cycles of length


i


for a total of










i
=
2

n








(



n




i



)




(

i
-
1

)

!



>


(

n
-
1

)

!











cycles.




Another example of a digraph with exponential number of simple cycles is given in FIG.


16


. In this case, however, the number of edges is substantially smaller than in case of a complete digraph. Thus, one can hardly expect an algorithm to be polynomial in the size of the input (here, the input has size 2


n


where n is the number of stages). However, algorithms can be produced that generate the cycles in time O((|V|+|E|)(c+1)), where c is the number of cycles in the digraph. Such an algorithm would be very good, since the time taken just to print the cycles must be L·c, where L is the average cycle length, which is upper bounded by number of vertices, i.e., L=O(|V|). These cycles can be enumerated in several ways as discussed below.




a) Recursive Enumeration




In order to ensure that each generated cycle is new, vertices are assumed to be represented as integers from 1 to |V|=2”, and each cycle is assumed to be rooted at the cycle's smallest vertex.

FIG. 17

depicts a flow diagram of a recursive enumeration process


1700


. The process begins at step


102


and proceeds to step


1704


. At step


1704


, a search begins at vertex s by building a directed path (s,v


1


,v


2


. . . , v


k


) at step


1706


, such that v


i


>s for 1≦i≦k. A cycle is identified (and stored) only when the next vertex v


k+1


=s is identified. After generating the cycle (s,v


1


,v


2


, . . . ,v


k


,s), the next edge extending from v


k


is explored at step


1708


. If all edges going out of v


k


have been explored, the process


1700


proceeds through query


1710


to the previous vertex v


k−1


at step


1716


and attempts to list cycles from that vertex and so on. This process is continued through step


1710


until the process


1700


backs up past the starting vertex s; all cycles containing vertex s have then been generated. The process is repeated for every vertex s=1,2, . . . , |V| (i.e., until query


1712


is affirmatively answered). The process stops at step


1714


.




To prevent traversing cycles that originate at a vertex v


i


during the search for cycles rooted at s, the process


1700


must exclude all vertices on the current path (except s) as extensions of that path. A vertex v will be marked as unavailable by setting avail(v) to false as soon as v is appended to the current path. The vertex v will remain unavailable at least until the process


1700


has backed up past v to the previous vertex on the current path. If the current path up to vertex v did not lead to a cycle rooted at s, v will remain unavailable for awhile even after the process backs up past it. This prevents searching for cycles in parts of the digraph on which such searches have been previously unsuccessful.




As the search progresses, the vertices on the current path are stored in a stack called path: a vertex v is added to the top of the stack before the search continues (by a recursive call) and is removed from the top of the stack in backing up (on return from the recursive call). The vertex is marked unavailable as the vertex is put on the stack and, if the vertex leads to a cycle rooted at s, made available again after the vertex is removed from the stack. If the process did not lead to a cycle rooted at s, then the cycle remains temporarily unavailable. A record is kept of the predecessors of all unavailable vertices that are not on the current path by maintaining sets B(w) for each w∈V:




B(w):={v∈V|(v,w) ∈ E and v is unavailable and not on the current path}




In other words, B(w)is the set of unavailable predecessors of w∈V. When the current path is (s,v


1


,v


2


, . . . , v


k


) and the next edge traversed is (v


k


,v


k+1


), there are three cases to consider:




1. If v


k+1


=s, a new cycle (s,v


1


,v


2


, . . . . . , v


k


,s) has been generated. The process outputs (e.g., print) the cycle and then set flag←true to indicate that a cycle (rooted at s) going through v


k


has been found.




2. If v


k+1


≠s and v


k+1


is available, the process appends v


k+1


to the current path by making a recursive call to the cycle generating procedure.




3. If v


k+1


is unavailable, then the process ignores the cycle and looks for another edge starting at v


k


. If there are no unexplored edges starting at v


k


, v


k


is deleted from the path and the process backs up to v


k−1


. In backing up to v


k−1


, the process makes v


k


available again if it led to a cycle (i.e., if flag is true). Otherwise, the cycle is left unavailable and the vertices w that are successors of v


k


have v


k


added to their set B(w).




b) Digraph Generation Based On A Depth-First Search




In the case of generating a digraph using a depth-first search, a back edge of a digraph generated in a depth-first search corresponds to a simple cycle. A forward edge may correspond to a “short-cut” of a cycle. A cross edge (in the same tree) may correspond to one or more other simple cycles.




For example, in {0,1}


2


={(00), (01), (10), (11)} and serial wafer flow, edges are specified by the successor relationship as




s[(00)]={(10)}




s[(01)]={(11), (00)}




s[(10)]={(00)}




s[(11)]={(0)}




Thus, the set E in G({0,1}


2


,E) has five edges, namely ((00), (10)), ((01), (11)), ((01), (00)), ((10), (01)) and ((11), (10)), as shown in FIG.


11


. There are only two distinct simple cycles of length three in the associated digraph. Since each k-cycle corresponds to k schedules, a 2-chamber serial wafer flow has six schedules.




The adjacency matrix shown in

FIG. 18

that is associated with the digraph of

FIG. 11

is a 4 by 4 binary matrix D such that D(x,y)=1 if and only if y∈s(x). There is, of course, a one-to-one correspondence between these two objects, i.e., given the adjacency matrix D it is possible to recover digraph G({0,1}


2


,E) within the isomorphism.




The adjacency matrix D for a two chamber serial wafer flow is given below. Note that, for example, D((01), (11))=1 because vertix (state) (11) is in the set s(01).















Adjacency Matrix D
















00




01




10




11



















00




0




0




1




0






01




1




0




0




1






10




0




1




0




0






11




0




0




1




0














By using matrices D


k


for k=2,3, . . . it is easy to recognize paths or cycles of length k. For example, from the matrix D


3


below,















Matrix D


3


















00




01




10




11



















00




1




0




0




1






01




0




2




0




0






10




0




0




2




0






11




1




0




0




1














it is easy to see that associated digraph has two cycles of length three (vertices) (01) and (10) below to both cycles while vertices (00) and (11) are on only one cycle). The real advantage of this association is for large digraphs which have many cycles.




Digraph Generation Using A Backtrack Search




To find all cycles in a given digraph, the invention may use a simple backtrack search. Let {overscore (u)}


1


be the starting vertex of a cycle. By using the rules for adding a successor vertix of a process builds a path, say S={overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


. There are two questions the process must answer every time it appends a new vertex {overscore (u)}


k+1


to path S:




a) Is {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (u)}


k+1


a cycle;




b) If {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (u)}


k+1


is a cycle, are there other cycles which have not been recorded.




A string {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (u)}


k+1


is a cycle if it is built according to rules for successor occupancy-vector, all vertices {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k+1


are different, and the successor of {overscore (u)}


k+1


is the starting vertex {overscore (u)}


1


. If {overscore (u)}


1


{overscore (u)}


k+2


. . . {overscore (u)}


k


{overscore (u)}


k+1


happens to be a simple-cycle, the process stores the cycle (or print it), removes the vertex {overscore (u)}


k+1


from the cycle and looks at some other unused successor of {overscore (u)}


k


. If there is such a successor, say {overscore (z)}, the process checks if {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (z)} a cycle. If {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (z)} is not a cycle, the process appends an unused successor of {overscore (z)} and so on. If {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


{overscore (z)} is a cycle, the process removes {overscore (z)} and look for another unused successor of {overscore (u)}


k


. If there are no unused successors of {overscore (u)}


k


, the process returns (backtracks) and looks at unused successors of {overscore (u)}


k−1


and so on until the process returns to the starting vertex {overscore (u)}


1


.

FIG. 19

depicts a flow diagram of the backtrack process


1900


. The process performs the following sequence of steps:




Step


1902


. (Initialize.) Choose the first vertex {overscore (u)}


1


of a cycle and go to Step


1904


.




Step


1904


. If {overscore (u)}


1


{overscore (u)}


2


. . . {overscore (u)}


k


is not a cycle, go to Step


1906


. Else, go to Step


1908


.




Step


1906


. Find a successor vertex (of the last vertex {overscore (u)}


k


in the cycle) which was not used, go to step


1908


. If there are no unused successors, go to Step


1912


.




Step


1908


. Append the vertex to the path and go to Step


1904


.




Step


1908


. Output (print or store) the cycle and go to Step


1912


.




Step


1912


. If there are no more vertices, then STOP at step


1914


. Else, go to Step


1916


.




Step


1916


. (Backtrack.) Remove the last visited vertex from the cycle and go to Step


1906


.




Clearly, the process


1900


must ensure that the process doesn't produce duplicate cycles in Step


1908


as well as that the process have produced all possible cycles. The former is performed in Step


19010


where the process appends only an unused successor of the last vertex to the path. The latter is ensured by the proper termination condition (i.e., the process is at {overscore (u)}


1


and there are no unused successors of {overscore (u)}


1


). To find all schedules, the process needs to the backtrack search for each vertex from {0,1}


n


. If α({overscore (x)}) is the number of cycles that start with the vertex {overscore (x)}, the total number of cycles is Σ


{overscore (x)}∈{0,1}






n




α({overscore (x)}).




G. Chamber Clean




When chamber cleaning process is taken into account in the schedule generation process, a chamber has three states: 0 (empty chamber), 1 (wafer in chamber), and C (chamber undergoing a cleaning process). Only an empty chamber can initiate a cleaning process. When a cleaning process is over, a chamber either remains empty or a wafer is put in.

FIG. 20

depicts digraph G


1


({0,1,C},E) that takes account of cleaning processes.

FIG. 20

also depicts the digraph's corresponding adjacency matrix and an illustrative wafer positioning.




Due to a chamber cleaning process, the number of states increases considerably and is given by 3


n


where n is the number of stages. This is illustrated in

FIG. 21

depicting a digraph, an adjacency matrix and illustrative wafer positioning in a cluster tool for a 2-chamber serial wafer flow with chamber clean. In the associated 9-vertex digraph, there are now seven cycles of length two, 4 cycles of length three, two cycles of length five, three cycles of length six, one cycle of length seven and one of length eight.




When a chamber cleaning process happens frequently (e.g. clean after processing every wafer), one must deal with the extended 3


n


-node digraph that accounts for “chamber-clean” state. The procedure however remains the same as described above. The process is only longer because the number of simple-cycles is bigger. When a chamber clean is infrequent, one can ignore the cleaning process and use the schedule obtained for 2-state chamber occupancy modified for the chamber clean. That is, every time a chamber clean happens, the cycle starts from a new vertex and is optimum until the next clean happens.




The present invention rapidly computes all possible schedules for a given cluster tool configuration. The schedules are then executed by a throughput model to determine the optimal schedule. As such, the present invention facilitates automatic determination of an optimal schedule in a rapid and accurate manner that has heretofore been unavailable in the prior art.




Although various embodiments which incorporate the teachings of the present invention have been shown and described in detail herein, those skilled in the art can readily devise many of the varied embodiments that still incorporate these teachings.



Claims
  • 1. A method of producing schedules for processing a wafer in a multichamber semiconductor wafer processing tool comprising the steps of:(a) providing a trace defining a series of chambers that are visited by a wafer as the wafer is processed by the tool; (b) initializing a sequence generator with an initial digraph vertex defining an initial wafer positioning with the tool; and (c) generating vectors that represent all valid wafer movements related to the initial digraph vertex that lead to valid successor vertices, where said vectors and vertices, taken together, form a digraph that represents at least one schedule for processing a wafer.
  • 2. The method of claim 1 wherein combinations of vertices and vectors form cycles in the digraph, where each cycle represents a schedule.
  • 3. The method of claim 1 further comprising the steps of:(d) backtracking through a set of vertices and applying step (c) to a prior vertex to produce further successor vertices and vectors; and (e) stopping said backtracking when all possible cycles are produced that represent all possible valid schedules.
  • 4. The method of claim 3 further comprising the step of:(f) identifying at least one schedule in all possible valid schedules that provides an optimal throughput for a given trace.
  • 5. The method of claim 4 wherein said identifying step (f) further comprises the step of computing the throughput for each and every schedule of said all possible schedules and selecting an optimum schedule for the trace which produces the highest throughput.
  • 6. The method of claim 3 wherein said backtracking step (d) further comprises the steps of:(a′) initializing a vertex; (b′) identifying an unused successor vertex; (c′) appending the unused successor vertex to a path; (d′) querying whether the last vertex is the same as a previous vertex in the path and, if not, repeat steps (b′), (c′), and (d′) until the last vertex of the path is the same as some previous vertex in the path; (e′) storing the path as a cycle; (f′) querying whether any other cycles remain and, if not, stopping; otherwise, proceeding to step (g′); (g′) removing the last vertex of the cycle; (h′) querying whether there is an unused successor vertex and, if there are no unused successor vertices, repeating steps (f′), (g′) and (h′) until there is an unused successor vertex; (i′) appending the unused successor vertex to a new path, marking the successor vertex as used; and (k′) returning to step (b′).
  • 7. The method of claim 6 wherein successor vertices are defined by successor generation rules that are prescribed by wafer processing parameters.
  • 8. The method of claim 6 wherein successor vertices are generated with regard to transport-robot positioning.
  • 9. Apparatus for producing schedules for processing a wafer in a multichamber semiconductor wafer processing tool, having a trace defining a series of chambers that are visited by a wafer as the wafer is processed by the tool, said apparatus comprising:a sequence generator, being initialized with an initial value of a vertex defining an initial wafer positioning within the tool, for generating values of said vertex that represent all valid successor wafer positions related to the initial vertex, where said vertices and vectors connecting the vertices, taken together, form at least one cycle that represents a schedule for processing a wafer.
  • 10. The apparatus of claim 9 further comprising a throughput model, coupled to said sequence generator, for computing a throughput value for each possible schedule in said all possible schedules.
  • 11. The apparatus of claim 10 further comprising means for identifying at least one schedule that has the largest throughput value.
  • 12. Apparatus for producing schedules for processing a wafer in a multichamber semiconductor wafer processing tool, having a trace defining a series of chambers that are visited by a wafer as the wafer is processed by the tool, said apparatus comprising:(a) means for providing a trace defining a series of chambers that are visited by a wafer as the wafer is processed by the tool; (b) means for initializing a sequence generator with an initial digraph vertex defining an initial wafer positioning with the tool; and (c) means for generating vectors that represent all valid wafer movements related to the initial digraph vertex that lead to valid successor vertices, where said vectors and vertices, taken together, form a cycle that represents at least one schedule for processing a wafer.
  • 13. The apparatus of claim 12 wherein combinations of vertices and vectors form cycles in the digraph, where each cycle represents a schedule.
  • 14. The apparatus of claim 12 further comprising:(d) means for backtracking through a set of vertices and applying said means for generating vectors to a prior vertex to produce further successor vertices and vectors; and (e) means for stopping said backtracking when all possible cycles are produced that represent all possible valid schedules.
  • 15. A computer readable memory containing software that, when executed by a processor, causes a sequence generator to perform a method of producing schedules for processing a wafer in a multichamber semiconductor wafer processing tool comprising the steps of:(a) providing a trace defining a series of chambers that are visited by a wafer as the wafer is processed by the tool; (b) initializing a sequence generator with an initial digraph vertex defining an initial wafer positioning with the tool; and (c) generating vectors that represent all valid wafer movements related to the initial digraph vertex that lead to valid successor vertices, where said vectors and vertices, taken together, form a digraph that represents at least one schedule for processing a wafer.
  • 16. The method of claim 15 wherein combinations of vertices and vectors form cycles in the digraph, where each cycle represents a schedule.
  • 17. The method of claim 15 further comprising the steps of:(d) backtracking through a set of vertices and applying step (c) to a prior vertex to produce further successor vertices and vectors; and (e) stopping said backtracking when all possible cycles are produced that represent all possible valid schedules.
  • 18. The method of claim 17 further comprising the step of:(f) identifying at least one schedule in all possible valid schedules that provides an optimal throughput for a given trace.
  • 19. The method of claim 18 wherein said identifying step (f) further comprises the step of computing the throughput for each and every schedule of said all possible schedules and selecting an optimum schedule for the trace which produces the highest throughput.
  • 20. The method of claim 17 wherein said backtracking step (d) further comprises the steps of:(a′) initializing a vertex; (b′) identifying an unused successor vertex; (c′) appending the unused successor vertex to a path; (d′) querying whether the last vertex is the same as a previous vertex in the path and, if not, repeat steps (b′), (c′), and (d′) until the last vertex of the path is the same as some previous vertex in the path; (e′) storing the path as a cycle; (f′) querying whether any other cycles remain and, if not, stopping; otherwise, proceeding to step (g′); (g′) removing the last vertex of the cycle; (h′) querying whether there is an unused successor vertex and, if there are no unused successor vertices, repeating steps (f′), (g′) and (h′) until there is an unused successor vertex; (i′) appending the unused successor vertex to a new path, marking the successor vertex as used; and (j′) returning to step (b′).
  • 21. The method of claim 20 wherein successor vertices are defined by successor generation rules that are implied by a wafer processing sequence.
  • 22. The method of claim 20 wherein successor vertices are generated with regard to transport-robot positioning.
CROSS REFERENCE TO RELATED APPLICATIONS

This application is a continuation-in-part of U.S. patent application Ser. No. 08/871,746, filed Jun. 9, 1997 and incorporated herein by reference now U.S. Pat. No. 6,201,999.

US Referenced Citations (11)
Number Name Date Kind
5105362 Kotani Apr 1992 A
5241465 Oba et al. Aug 1993 A
5354413 Smesny et al. Oct 1994 A
5444632 Kline et al. Aug 1995 A
5580419 Berenz Dec 1996 A
5580819 Li et al. Dec 1996 A
5654903 Reitman et al. Aug 1997 A
5855681 Maydan et al. Jan 1999 A
5904487 Conboy et al. May 1999 A
5909994 Blum et al. Jun 1999 A
6074443 Venkatesh et al. Jun 2000 A
Foreign Referenced Citations (2)
Number Date Country
1 058 172 Jun 2000 EP
0079355 Dec 2000 WO
Non-Patent Literature Citations (1)
Entry
PCT Search Report for corresponding Application PCT/US02/01445, dated Jan. 14, 2003.
Continuation in Parts (1)
Number Date Country
Parent 08/871746 Jun 1997 US
Child 09/771254 US