The present invention relates to a technology for processing exhaust gas discharged from a process chamber of a semiconductor manufacturing facility using plasma, and more particularly, to a plasma reactor for processing exhaust gas discharged from a process chamber of a semiconductor manufacturing facility using inductively coupled plasma and a method of assembling the same.
Semiconductor devices are manufactured by repeatedly performing processes such as photolithography, etching, diffusion, and metal deposition on a wafer in a process chamber. During a semiconductor manufacturing process, various process gases are used, and after the process is completed, a residual gas in the process chamber contains various harmful components such as PFCs. The residual gas in the process chamber is discharged through an exhaust line by a vacuum pump after the process is completed, and the exhaust gas is purified by an exhaust gas processing device so that harmful components are not discharged as they are.
Recently, a technique of decomposing and processing harmful components using a plasma reaction has been widely used. As a prior art related to the present invention, Korean Patent Laid-open Publication No. 2019-19651 discloses a plasma chamber for processing exhaust gas using inductively coupled plasma. In inductively coupled plasma, when radio frequency power is applied to the antenna coil, a magnetic field is induced by a time-varying current flowing through the antenna coil, thereby generating plasma by an electric field generated inside the chamber. In general, a plasma reactor for inductively coupled plasma includes a chamber providing a space for generating plasma, a ferrite core coupled to surround the chamber, an antenna coil wound around the ferrite core, and an igniter for initial plasma ignition.
The present invention provides an inductively coupled plasma reactor and a method of assembling the same.
According to an aspect of the present invention, there is provided a plasma reactor for inductively coupled plasma including a ferrite core assembly including a ferrite core stacked body including a plurality of ferrite cores stacked and a first passage portion and a second passage portion arranged in parallel, and a ferrite core accommodating structure configured to accommodate the ferrite core stacked body, a first chamber body including a first base portion configured to provide a first internal space therein, a first A-extension pipe extending from the first base portion, communicating with the first internal space and accommodated in the first passage portion, and a second A-extension pipe extending from the first base portion, communicating with the first internal space and accommodated in the second passage portion, and a second chamber body including a second base portion configured to provide a second internal space therein, a first B-extension pipe extending from the second base portion, communicating with the second internal space and accommodated in the first passage portion to be connected to the first A-extension pipe, and a second B-extension pipe extending from the second base portion, communicating with the second internal space and accommodated in the second passage portion to be connected to the second A-extension pipe.
According to another aspect of the present invention, there is provided a method of assembling a plasma reactor for inductively coupled plasma, the method including preparing a ferrite core assembly including a ferrite core stacked body including a plurality of ferrite cores stacked and a first passage portion and a second passage portion arranged in parallel, and a ferrite core accommodating structure configured to accommodate the ferrite core stacked body, preparing a first chamber body including a first base portion configured to provide a first internal space therein, and a first A-extension pipe and a second A-extension pipe extending from the first base portion and communicating with the first internal space, preparing a second chamber body including a second base portion configured to provide a second internal space therein, and a first B-extension pipe and a second B-extension pipe extending from the second base portion and communicating with the second internal space, pre-assembling, wherein the first A-extension pipe and the first B-extension pipe are inserted to face each other and connected through the first passage portion and the second A-extension pipe and the second B-extension pipe are inserted to face each other and connected through the second passage portion, and coupling the first chamber body and the second chamber body.
According to the present invention, all the objectives of the present invention described above can be achieved. Specifically, a ferrite core stacked body formed by accommodating a plurality of stacked ferrite cores in a ferrite core accommodating structure is provided, and because a first chamber body and a second chamber body are screwed to each other by a plurality of coupling rods, a plasma reactor for inductively coupled plasma is structurally robust and can be conveniently assembled and manufactured with improved workability.
Hereinafter, the configuration and operation of an embodiment of the present invention will be described in detail with reference to the drawings.
A plasma reactor for inductively coupled plasma according to an embodiment of the present invention is shown in a perspective view in
The ferrite core stacked body 140 is formed by sequentially stacking a plurality of ferrite cores 145 having the same shape and includes a first passage portion 142a and a second passage portion 142b, which are arranged in parallel on the ferrite core stacked body 140 and extend in parallel along a vertical direction in the drawing. The first passage portion 142a and the second passage portion 142b penetrate through the ferrite core stacked body 140 so that both ends of the upper and lower portions thereof are opened, and the side surfaces thereof are blocked. The ferrite core stacked body 140 is accommodated in the ferrite core accommodating structure 120a.
In
The annular portion 146 has a rectangular annular shape, and includes opposing first and second long side portions 146a and 146b and opposing first and second short side portions 147a and 147b. Each of the first short side portion 147a and the second short side portion 147b connects opposite ends of the first long side portion 146a and the second long side portion 146b in a lengthwise direction so that the first long side portion 146a, the first short side portion 147a, the second long side portion 146b and the second short side portion 147b are continuously connected along the circumferential direction of the annular portion 146.
The connection portion 148 extends in a straight line to connect the two opposite long side portions 146a and 146b of the annular portion 146. Both ends of the connection portion 148 are connected to the longitudinal center portion of each of the two long side portions 146a and 146b. The inner region of the annular portion 146 is separated into a first through hole 149a and a second through hole 149b having a square shape by the connection portion 148, respectively. In the ferrite core stacked body 140 formed by stacking a plurality of ferrite cores 145, the first through holes 149a of each of the plurality of ferrite cores 145 are connected to the first ferrite core stacked body 140 to form a first passage portion 142a of the ferrite core stacked body 140, and second through holes 149b of each of the plurality of ferrite cores 145 are connected to form a second passage portion 142b of the ferrite core stacked body 140.
The ferrite core accommodating structure 120a provides an accommodation space 121 for accommodating the ferrite core stacked body 140 therein. The material of the ferrite core accommodating structure 120a is made of an electrical insulator. The ferrite core accommodating structure 120a includes a sidewall member 120 having both ends open, and a first finishing member 130a and a second finishing member 130b coupled to both open ends of the sidewall member 120, respectively. The accommodation space 121 provided by the ferrite core accommodating structure 120a is formed in a shape and size corresponding to the outer shape of the ferrite core stacked body 140 to be accommodated, so that, when the ferrite core stacked body 140 is accommodated in the accommodation space 121 of the ferrite core accommodating structure 120a, the ferrite core stacked body 140 does not shake within the accommodation space 121 and maintains its shape steadily.
The side wall member 120 is an overall rectangular wall structure, and the upper and lower ends, which are both ends, are open in the drawing. The sidewall member 120 forms an accommodation space 121 therein, and surrounds side surfaces of the ferrite core stacked body 140 in a state in which the ferrite core stacked body 140 is accommodated in the accommodation space 121. The side wall member 120 has a plurality of windows 122 through which the accommodation space 121 and the outside communicate with each other, and a region corresponding to the side of the ferrite core stacked body 140 accommodated in the accommodation space 121 through the plurality of windows 122 is exposed to the outside. The first finishing member 130a is coupled to the open upper end of the sidewall member 120, and the second finishing member 130b is coupled to the open lower end of the sidewall member 120.
The first finishing member 130a is coupled to the open upper end of the side wall member 120 through a fastening unit such as screwing. The first finishing member 130a has substantially the same shape as the ferrite core 145, and the first finishing member 130a has a first A-opening 131a communicating with the first passage portion 142a of the ferrite core stacked body 140 and a second A-opening 132a communicating with the second passage portion 132a of the ferrite core stacked body 140. A plurality of screw holes 133a for screwing with the side wall member 120 are formed in the first finishing member 130a. In addition, a plurality of screw holes 135a for screwing with the coupling rods 190 are formed on the side of the first finishing member 130a. The first finishing member 130a is in close contact with the uppermost ferrite core 145 of the ferrite core stacked body 140 in a state in which the ferrite core stacked body 140 is accommodated in the accommodation space 121.
The second finishing member 130b is coupled to the open lower end of the sidewall member 120 through a fastening unit such as screwing. The second finishing member 130b has substantially the same shape as the ferrite core 145, and the second finishing member 130b has a first B-opening portion 131b communicating with the first passage portion 142a of the ferrite core stacked body 140 and a second B-opening portion 132b communicating with the second passage portion 132a of the ferrite core stacked body 140. A plurality of screw holes 133b for screwing with the side wall member 120 are formed in the second finishing member 130b. In addition, a plurality of screw holes 135b for screwing with the coupling rods 190 are formed on the side of the second finishing member 133b. The second finishing member 130b is in close contact with the lowermost ferrite core 145 of the ferrite core stacked body 140 in a state in which the ferrite core stacked body 140 is accommodated in the accommodation space 121.
A plurality of ferrite cores 145 are accommodated in the accommodation space 121 through the open upper end of the side wall member 120 and stacked after the second finishing member 130b is coupled to the side wall member 120, and the first finishing member 130a is coupled to the open upper end of the sidewall member 120 so that the ferrite core assembly 110 may be completed.
Referring to
The first chamber body 160a includes a first base portion 161a, and a first A-extension pipe 165a and a second A-extension pipe 167a extending from the first base portion 161a.
The first base portion 161a provides a first internal space 162a therein, and a gas inlet 164a which communicates with the first internal space 162a and through which gas to be processed is introduced, is formed in the first base portion 161a. The first internal space 162a communicates with the first A-extension pipe 165a and the second A-extension pipe 167a. The first base portion 161a is in close contact with the first finishing member 130a of the ferrite core assembly 110. Each of a plurality of first igniters (not shown) is inserted and installed in the first base portion 161a. A plurality of first screw coupling holes 166a through which the plurality of coupling rods 190 are screwed to each other, are formed on side surfaces of the first base portion 161a. In addition, a plurality of first screw through holes 163a through which the plurality of coupling rods 195 are screwed to each other, are formed on the first base portion 161a.
The first A-extension pipe 165a and the second A-extension pipe 167a are formed to extend parallel to each other from the first base portion 161a. The first A-extension pipe 165a and the second A-extension pipe 167a communicate with the first internal space 162a of the first base portion 161a, and the end of the first A-extension pipe 165a and the end of the second A-extension pipe 167a are open. The first A-extension pipe 165a is accommodated in the first passage portion 142a of the ferrite core assembly 110, and the second A-extension pipe 167a is accommodated in the second passage portion 142b of the ferrite core assembly 110. The open end of the first A-extension pipe 165a and the open end of the second A-extension pipe 167a are connected to the second chamber unit 150b. The first chamber body 160a and the second chamber body 160b are connected to form a toroidal-shaped chamber.
Each of the plurality of first igniters (not shown) is installed at an appropriate position of the first base portion 161a of the first chamber body 160a.
The second chamber unit 150b includes a second chamber body 160b and a plurality of second igniters (not shown) installed in the second chamber body 160b. The second chamber unit 150b is structurally coupled to the first chamber unit 150a by a plurality of coupling rods 190 and 195.
The second chamber body 160b has substantially the same structure as the first chamber body 160a, and includes a second base portion 161b, a first B-extension pipe 165b and a second B-extension pipe 167b extending from the second base portion 161b.
The second base portion 161b provides a second internal space (not shown) therein, and a gas outlet (not shown) which communicates with the second internal space (not shown) and through which the processed gas is discharged to the outside, is formed in the second base portion 161b. The second internal space (not shown) communicates with the second A-extension pipe 165b and the second B-extension pipe 167b. The second base portion 161b is in close contact with the second finishing member 130b of the ferrite core assembly 110. Each of a plurality of second igniters (not shown) is inserted and installed in the second base portion 161b. A plurality of second screw coupling holes 166b through which the plurality of coupling rods 190 are screwed to each other, are formed on side surfaces of the second base portion 161b. In addition, a plurality of second screw through holes 163b through which the plurality of coupling rods 195 are screwed to each other, are formed on the second bae portion 161b.
The first B-extension pipe 165b and the second B-extension pipe 167b are formed to extend parallel to each other from the second base portion 161b. The first B-extension pipe 165b and the second B-extension pipe 167b communicate with the second internal space (not shown) of the first base portion 161b, and the end of the first B-extension pipe 165b and the end of the second B-extension pipe 167b are open. The first B-extension pipe 165b is accommodated in the first passage portion 142a of the ferrite core assembly 110, and the second B-extension pipe 167b is accommodated in the second passage portion 142b of the ferrite core assembly 110. The first
B-extension pipe 165b is connected to and communicates with the first A-extension pipe 165a, and the second B-extension pipe 167b is connected to and communicates with the second A-extension pipe 167a, and although not shown, a DC breaker (not shown) is positioned between the end of the first A-extension pipe 165a and the end of the first B-extension pipe 165b and between the end of the second A-extension pipe 167a and the end of the second B-extension pipe 167b.
Each of the plurality of second igniters (not shown) is installed at an appropriate position of the second base portion 161b of the second chamber body 160b.
The plurality of coupling rod members 190 and 195 are connected between the first chamber unit 150a and the second chamber unit 150b to couple the two chamber units 150a and 150b.
The plurality of coupling rod members 190 and 195 include a plurality of first coupling rod members 190 and a plurality of second coupling rod members 195.
The plurality of first coupling rod members 190 have a generally rectangular rod shape, and one side of both ends thereof is screwed to a side surface of the first base portion 161a of the first chamber body 160a, a side surface of the first finishing member 130a of the ferrite core assembly 140, a side surface of the second base portion 161b of the second chamber body 160b, and a side surface of the second finishing member 130b of the ferrite core assembly 140. To this end, a plurality of screw through holes 192 are formed on the side surfaces of the first coupling rod member 190. That is, the first coupling rod member 190 includes a first screw coupling hole 166a formed on the first base portion 161a, a second screw coupling hole 166b formed on the second base portion 161b, a first screw hole 135a formed in the first finishing member 130a, and a second screw hole 135b formed in the second finishing member 130b. To this end, female screws are formed in the first and second screw coupling holes 166a and 166b and the first and second screw holes 135a and 135b.
The plurality of second coupling rod members 190 have a generally circular rod shape, and are screwed to each other while being inserted between the first base portion 161a and the second base portion 161b. Female screw holes 196 are formed at both ends of the second coupling rod members 190. Male screws to be inserted into the first screw hole 163a formed in the first base portion 161a and the second screw hole 163b formed in the second base portion 161b are coupled to the female screw holes 196 of the second coupling rod members 190.
In the preparing of the ferrite core assembly (S11), the ferrite core assembly 110 having the configuration shown in
In the preparing of the first chamber (S15), the first chamber body 160a having the configuration shown in
In the preparing of the second chamber (S18), the second chamber body 160b having the configuration shown in
In the pre-assembling (S20), the ferrite core assembly 110 prepared through the preparing of the ferrite core assembly (S11), the first chamber body 160a prepared through the preparing of the first chamber (S15), and the second chamber body 160b prepared through the preparing of the second chamber (S18) are pre-assembled.
Specifically, in the pre-assembling (S20), the first-A extension pipe 165a of the first chamber body 160a and the first B-extension pipe 165a of the second chamber body 160b are inserted to face each other and connected through the first passage portion 142a of the ferrite core assembly 110, and the second A-extension pipe 167a of the first chamber body 160a and the second B-extension pipe 167b of the second chamber body 160b are inserted to face each other and connected through the second passage portion 142b of the ferrite core assembly 110.
In the coupling (S30), the ferrite core assembly 1100, the first chamber body 160a, and the second chamber body 160b pre-assembled through the pre-assembling (S20) are screwed to each other using a plurality of combining rods 190 and 195.
In the assembling of igniters (S40), a plurality of first igniters (not shown) are installed on the first chamber body 160a, and a plurality of second igniters (not shown) are installed on the second chamber body 160b.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it will be understood by those of ordinary skill in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the following claims.
Number | Date | Country | Kind |
---|---|---|---|
10-2020-0058137 | May 2020 | KR | national |
This application is a continuation application of U.S. patent application Ser. No. 17/918,103 filed on Oct. 10, 2022, which under 35 U.S.C. § 120, which is the 35 U.S.C. § 371 national stage of PCT International Patent Application No. PCT/KR2021/005044 filed on Apr. 21, 2021, under 35 U.S.C. § 371, which claims priority to Korean Patent Application No. 10-2020-0058137 filed on May 15, 2020 which is hereby incorporated by reference in its entirety.
Number | Date | Country | |
---|---|---|---|
Parent | 17918103 | Oct 2022 | US |
Child | 18766571 | US |