This invention relates to a diesel powered system, such as a train, off highway vehicle, marine and/or stationary diesel powered system and, more particularly to a system, method, and computer software code for optimized fuel efficiency and emission output of the diesel powered system.
Diesel powered systems such as, but not limited to, off-highway vehicles, marine diesel powered propulsion plants, stationary diesel powered system and rail vehicle systems, or trains, usually are powered by a diesel power unit. With respect to rail vehicle systems, the diesel power unit is part of at least one locomotive and the train further includes a plurality of rail cars, such as freight cars. Usually more than one locomotive is provided wherein the locomotives are considered a locomotive consist. Locomotives are complex systems with numerous subsystems, with each subsystem being interdependent on other subsystems.
An operator is usually aboard a locomotive to insure the proper operation of the locomotive, and when there is a locomotive consist, the operator is usually aboard a lead locomotive. In addition to insuring proper operations of the locomotive, or locomotive consist, the operator also is responsible for determining operating speeds of the train and forces within the train that the locomotives are part of. To perform this function, the operator generally must have extensive experience with operating the locomotive and various trains over the specified terrain. This knowledge is needed to comply with prescribeable operating speeds that may vary with the train location along the track. Moreover, the operator is also responsible for assuring in-train forces remain within acceptable limits.
However, even with knowledge to assure safe operation, the operator cannot usually operate the locomotive so that the fuel consumption and emissions is minimized for each trip. For example, other factors that must be considered may include emission output, operator's environmental conditions like noise/vibration, a weighted combination of fuel consumption and emissions output, etc. This is difficult to do since, as an example, the size and loading of trains vary, locomotives and their fuel/emissions characteristics are different, and weather and traffic conditions vary.
Based on a particular train mission, when building a train, it is common practice to provide a range of locomotives in the train make-up to power the train, based in part on available locomotives with varied power and run trip mission history. This typically leads to a large variation of locomotive power available for an individual train. Additionally, for critical trains, such as Z-trains, backup power, typically backup locomotives, is typically provided to cover an event of equipment failure, and to ensure the train reaches its destination on time.
When operating a train, train operators typically call for the same notch settings when operating the train, which in turn may lead to a large variation in fuel consumption and/or emission output, such as, but not limited to, Nox, CO2, etc., depending on a number of locomotives powering the train. Thus, the operator usually cannot operate the locomotives so that the fuel consumption is minimized and emission output is minimized for each trip since the size and loading of trains vary, and locomotives and their power availability may vary by model type.
A train owner usually owns a plurality of trains wherein the trains operate over a network of railroad tracks. Because of the integration of multiple trains running concurrently within the network of railroad tracks, wherein scheduling issues must also be considered with respect to train operations, train owners would benefit from a way to optimize fuel efficiency and emission output so as to save on overall fuel consumption while minimizing emission output of multiple trains while meeting mission trip time constraints.
Likewise, owners and/or operators of off-highway vehicles, marine diesel powered propulsion plants, and/or stationary diesel powered systems would appreciate the financial benefits realized when these diesel powered system produce optimize fuel efficiency and emission output so as to save on overall fuel consumption while minimizing emission output of while meeting operating constraints, such as but not limited to mission time constraints.
Exemplary embodiments of the invention disclose a system, method and computer software code for improving overall fuel efficiency and emission output minimization of an engine through optimized power makeup. Towards this end, a method for determining the configuration of a diesel powered system having at least one diesel-fueled power generating unit is disclosed. The method includes a step for determining a minimum power required from the diesel powered system in order to accomplish a specified mission. An operating condition of the diesel-fueled power generating unit is determined such that the minimum power requirement is satisfied while yielding at least one of lower fuel consumption and lower emissions for the diesel powered system.
A method for configuring a diesel powered system having at least one diesel-fueled power generating unit is further disclosed. The method includes defining a time period during which the diesel powered system is expected to accomplish a specified mission. A load requirement for the diesel powered system is determined during the time period. A minimum required power is determined based on the load requirement. Another step involves selecting the at least one diesel-fueled power generating unit to satisfy the minimum required power while yielding at least one of improved fuel efficiency and lower emissions output for the system.
In another exemplary embodiment, a computer software code for determining an engine configuration for a train with at least one locomotive asset and a computer, an off-highway vehicle with a computer, a marine vehicle with a computer, and/or a stationary unit with a computer is disclosed. The computer software code includes a computer software module for defining a time during which the engine configuration is expected to accomplish a specified mission. A computer software module for determining an operating condition of an exhaust after treatment device is also provided. Another element is a computer software module for selecting the engine configuration to satisfy the minimum required power while yielding at least one of improved fuel efficiency and minimized emission output.
In yet another exemplary embodiment a method for determining an engine configuration for at least one of a train with at least one locomotive asset, an off-highway vehicle, a marine vehicle, and a stationary unit is disclosed. The method includes a step for defining a time during which the engine configuration is expected to accomplish a specified mission. Another step involves determining an operating condition of an exhaust after treatment device. Yet another step involves selecting the engine configuration to satisfy the minimum required power while yielding at least one of improved fuel efficiency and minimized emission output.
In yet another exemplary embodiment a computer software code for configuring a diesel powered system for a train with at least one locomotive asset with a computer, an off-highway vehicle with a computer, a marine vehicle with a computer, and/or a stationary unit with a computer is disclosed. The computer software code includes a computer software module for defining a time during which the diesel powered system is expected to accomplish a specified mission. A computer software module for determining a load requirement for the diesel powered system during the time period, and a computer software module for determining a minimum required power based on the load requirement are both also provided. A computer software module for selecting the at least one diesel-fueled power generating unit to satisfy the minimum required power while yielding at least one of improved fuel efficiency and minimized emission output is further included.
A system for determining a diesel engine configuration for at least one of a train with at least one locomotive asset, an off-highway vehicle, a marine vehicle, and a stationary unit is also disclosed. The system includes a load estimator, and a mission time determinator. A processor for calculating a minimum required power from the engine configuration based on a load determined by the load estimator and a mission time determined by the mission time determinator is further included. The processor further determines the engine configuration to satisfy the minimum required power while yielding at least one of improved fuel efficiency and minimized emission output.
In yet another exemplary embodiment a system for determining the configuration of a diesel powered system having at least one diesel-fueled power generating unit is disclosed. The system includes at least one sensor for determining an operating condition of the diesel-fueled power generating unit. A processor receiving information from the at least one sensor for determining a minimum power required from the diesel powered system in order to accomplish a specified mission is also provided. A minimum power requirement is satisfied while yielding at least one of lower fuel consumption and lower emissions for the diesel powered system.
In another exemplary embodiment a computer software code for determining the configuration of a diesel powered system having at least one diesel-fueled power generating unit is disclosed. The computer software code includes a computer software module for determining a minimum power required from the diesel powered system in order to accomplish a specified mission. A computer software module for determining an operating condition of the diesel-fueled power generating unit such that the minimum power requirement is satisfied while yielding at least one of lower fuel consumption and lower emissions for the diesel powered system is also included.
A more particular description of the invention briefly described above will be rendered by reference to specific embodiments thereof that are illustrated in the appended drawings. Understanding that these drawings depict only typical embodiments of the invention and are not therefore to be considered to be limiting of its scope, exemplary embodiments of the invention will be described and explained with additional specificity and detail through the use of the accompanying drawings in which:
Reference will now be made in detail to the embodiments consistent with the invention, examples of which are illustrated in the accompanying drawings. Wherever possible, the same reference numerals used throughout the drawings refer to the same or like parts.
Though exemplary embodiments of the present invention are described with respect to rail vehicles, specifically trains and locomotives having diesel engines, exemplary embodiments of the invention are also applicable for other uses, such as but not limited to off-highway vehicles, marine vessels, and stationary units, each which may use a diesel engine. Towards this end, when discussing a specified mission, this includes a task or requirement to be performed by the diesel powered system. Therefore, with respect to railway, marine or off-highway vehicle applications this may refer to the movement of the system from a present location to a destination. In the case of stationary applications, such as but not limited to a stationary power generating station or network of power generating stations, a specified mission may refer to an amount of wattage (e.g., MW/hr) or other parameter or requirement to be satisfied by the diesel powered system. Likewise, operating condition of the diesel-fueled power generating unit may include one or more of speed, load, fueling value, timing, etc.
In one exemplary example involving marine vessels, a plurality of tugs may be operating together where all are moving the same larger vessel, where each tug is linked in time to accomplish the mission of moving the larger vessel. In another exemplary example a single marine vessel may have a plurality of engines. Off Highway Vehicle (OHV) may involve a fleet of vehicles that have a same mission to move earth, from location A to location B, where each OHV is linked in time to accomplish the mission. With respect to a stationary power generating station, a plurality of stations may be grouped together collectively generating power for a specific location and/or purpose. In another exemplary embodiment, a single station is provided, but with a plurality of generators making up the single station.
Exemplary embodiments of the invention solves the problems in the art by providing a system, method, and computer implemented method, such as a computer software code, for improving overall fuel efficiency and emissions through optimized power makeup. With respect to locomotives, exemplary embodiments of the present invention are also operable when the locomotive consist is in distributed power operations.
Persons skilled in the art will recognize that an apparatus, such as a data processing system, including a CPU, memory, I/O, program storage, a connecting bus, and other appropriate components, could be programmed or otherwise designed to facilitate the practice of the method of the invention. Such a system would include appropriate program means for executing the method of the invention.
Also, an article of manufacture, such as a pre-recorded disk or other similar computer program product, for use with a data processing system, could include a storage medium and program means recorded thereon for directing the data processing system to facilitate the practice of the method of the invention. Such apparatus and articles of manufacture also fall within the spirit and scope of the invention.
Broadly speaking, the technical effect is an improvement of fuel efficiency and emission output through optimized power makeup. To facilitate an understanding of the exemplary embodiments of the invention, it is described hereinafter with reference to specific implementations thereof. Exemplary embodiments of the invention may be described in the general context of computer-executable instructions, such as program modules, being executed by a computer. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform particular tasks or implement particular abstract data types. For example, the software programs that underlie exemplary embodiments of the invention can be coded in different languages, for use with different platforms. In the description that follows, examples of the invention may be described in the context of a web portal that employs a web browser. It will be appreciated, however, that the principles that underlie exemplary embodiments of the invention can be implemented with other types of computer software technologies as well.
Moreover, those skilled in the art will appreciate that exemplary embodiments of the invention may be practiced with other computer system configurations, including hand-held devices, multiprocessor systems, microprocessor-based or programmable consumer electronics, minicomputers, mainframe computers, and the like. Exemplary embodiments of the invention may also be practiced in distributed computing environments where tasks are performed by remote processing devices that are linked through a communications network. In a distributed computing environment, program modules may be located in both local and remote computer storage media including memory storage devices. These local and remote computing environments may be contained entirely within the locomotive, or adjacent locomotives in consist, or off-board in wayside or central offices where wireless communication is used.
Throughout this document the term locomotive consist is used. As used herein, a locomotive consist may be described as having one or more locomotives in succession, connected together so as to provide motoring and/or braking capability. The locomotives are connected together where no train cars are in between the locomotives. The train can have more than one locomotive consists in its composition. Specifically, there can be a lead consist and more than one remote consists, such as midway in the line of cars and another remote consist at the end of the train. Each locomotive consist may have a first locomotive and trail locomotive(s). Though a first locomotive is usually viewed as the lead locomotive, those skilled in the art will readily recognize that the first locomotive in a multi locomotive consist may be physically located in a physically trailing position. Though a locomotive consist is usually viewed as successive locomotives, those skilled in the art will readily recognize that a consist group of locomotives may also be recognized as a consist even when at least a car separates the locomotives, such as when the locomotive consist is configured for distributed power operation, wherein throttle and braking commands are relayed from the lead locomotive to the remote trains by a radio link or physical cable. Towards this end, the term locomotive consist should be not be considered a limiting factor when discussing multiple locomotives within the same train.
Referring now to the drawings, embodiments of the present invention will be described. Exemplary embodiments of the invention can be implemented in numerous ways, including as a system (including a computer processing system), a method (including a computerized method), an apparatus, a computer readable medium, a computer program product, a graphical user interface, including a web portal, or a data structure tangibly fixed in a computer readable memory. Several embodiments of the invention are discussed below.
This data may be provided to the locomotive 42 in a number of ways, such as, but not limited to, an operator manually entering this data into the locomotive 42 via an onboard display, inserting a memory device such as a hard card and/or USB drive containing the data into a receptacle aboard the locomotive, and transmitting the information via wireless communication from a central or wayside location 41, such as a track signaling device and/or a wayside device, to the locomotive 42. Locomotive 42 and train 31 load characteristics (e.g., drag) may also change over the route (e.g., with altitude, ambient temperature and condition of the rails and rail-cars), and the plan may be updated to reflect such changes as needed by any of the methods discussed above and/or by real-time autonomous collection of locomotive/train conditions. This includes for example, changes in locomotive or train characteristics detected by monitoring equipment on or off board the locomotive(s) 42.
The track signal system determines the allowable speed of the train. There are many types of track signal systems and the operating rules associated with each of the signals. For example, some signals have a single light (on/off), some signals have a single lens with multiple colors, and some signals have multiple lights and colors. These signals can indicate the track is clear and the train may proceed at max allowable speed. They can also indicate a reduced speed or stop is required. This reduced speed may need to be achieved immediately, or at a certain location (e.g. prior to the next signal or crossing).
The signal status is communicated to the train and/or operator through various means. Some systems have circuits in the track and inductive pick-up coils on the locomotives. Other systems have wireless communications systems. Signal systems can also require the operator to visually inspect the signal and take the appropriate actions.
The signaling system may interface with the on-board signal system and adjust the locomotive speed according to the inputs and the appropriate operating rules. For signal systems that require the operator to visually inspect the signal status, the operator screen will present the appropriate signal options for the operator to enter based on the train's location. The type of signal systems and operating rules, as a function of location, may be stored in an onboard database 63.
Based on the specification data input into the exemplary embodiment of the present invention, an optimal plan which minimizes fuel use and/or emissions produced subject to speed limit constraints along the route with desired start and end times is computed to produce a trip profile 12. The profile contains the optimal speed and power (notch) settings the train is to follow, expressed as a function of distance and/or time, and such train operating limits, including but not limited to, the maximum notch power and brake settings, and speed limits as a function of location, and the expected fuel used and emissions generated. In an exemplary embodiment, the value for the notch setting is selected to obtain throttle change decisions about once every 10 to 30 seconds. Those skilled in the art will readily recognize that the throttle change decisions may occur at a longer or shorter duration, if needed and/or desired to follow an optimal speed profile. In a broader sense, it should be evident to ones skilled in the art that the profiles provide power settings for the train, either at the train level, consist level and/or individual train level. Power comprises braking power, motoring power, and airbrake power. In another preferred embodiment, instead of operating at the traditional discrete notch power settings, the exemplary embodiment of the present invention is able to select a continuous power setting determined as optimal for the profile selected. Thus, for example, if an optimal profile specifies a notch setting of 6.8, instead of operating at notch setting 7, the locomotive 42 can operate at 6.8. Allowing such intermediate power settings may bring additional efficiency benefits as described below.
The procedure used to compute the optimal profile can be any number of methods for computing a power sequence that drives the train 31 to minimize fuel and/or emissions subject to locomotive operating and schedule constraints, as summarized below. In some cases the required optimal profile may be close enough to one previously determined, owing to the similarity of the train configuration, route and environmental conditions. In these cases it may be sufficient to look up the driving trajectory within a database 63 and attempt to follow it. When no previously computed plan is suitable, methods to compute a new one include, but are not limited to, direct calculation of the optimal profile using differential equation models which approximate the train physics of motion. The setup involves selection of a quantitative objective function, commonly a weighted sum (integral) of model variables that correspond to rate of fuel consumption and emissions generation plus a term to penalize excessive throttle variation.
An optimal control formulation is set up to minimize the quantitative objective function subject to constraints including but not limited to, speed limits and minimum and maximum power (throttle) settings and maximum cumulative and instantaneous emissions. Depending on planning objectives at any time, the problem may be setup flexibly to minimize fuel subject to constraints on emissions and speed limits, or to minimize emissions, subject to constraints on fuel use and arrival time. It is also possible to setup, for example, a goal to minimize the total travel time without constraints on total emissions or fuel use where such relaxation of constraints would be permitted or required for the mission.
Throughout the document exemplary equations and objective functions are presented for minimizing locomotive fuel consumption. These equations and functions are for illustration only as other equations and objective functions can be employed to optimize fuel consumption or to optimize other locomotive/train operating parameters.
Mathematically, the problem to be solved may be stated more precisely. The basic physics are expressed by:
Where x is the position of the train, v its velocity and t is time (in miles, miles per hour and minutes or hours as appropriate) and u is the notch (throttle) command input. Further, D denotes the distance to be traveled, Tf the desired arrival time at distance D along the track, Te is the tractive effort produced by the locomotive consist, Ga is the gravitational drag which depends on the train length, train makeup and terrain on which the train is located, R is the net speed dependent drag of the locomotive consist and train combination. The initial and final speeds can also be specified, but without loss of generality are taken to be zero here (train stopped at beginning and end). Finally, the model is readily modified to include other important dynamics such the lag between a change in throttle, u, and the resulting tractive effort or braking. Using this model, an optimal control formulation is set up to minimize the quantitative objective function subject to constraints including but not limited to, speed limits and minimum and maximum power (throttle) settings. Depending on planning objectives at any time, the problem may be setup flexibly to minimize fuel subject to constraints on emissions and speed limits, or to minimize emissions, subject to constraints on fuel use and arrival time.
It is also possible to setup, for example, a goal to minimize the total travel time without constraints on total emissions or fuel use where such relaxation of constraints would be permitted or required for the mission. All these performance measures can be expressed as a linear combination of any of the following:
Replace the fuel term F in (1) with a term corresponding to emissions production. For example for emissions
—Minimize total emissions consumption. In this equation E is the quantity of emissions in gm/hphr for each of the notches (or power settings). In addition a minimization could be done based on a weighted total of fuel and emissions.
A commonly used and representative objective function is thus
The coefficients of the linear combination depend on the importance (weight) given to each of the terms. Note that in equation (OP), u(t) is the optimizing variable that is the continuous notch position. If discrete notch is required, e.g. for older locomotives, the solution to equation (OP) is discretized, which may result in lower fuel savings. Finding a minimum time solution (α1 set to zero and α2 set to zero or a relatively small value) is used to find a lower bound for the achievable travel time (Tf=Tfmin). In this case, both u(t) and Tf are optimizing variables. The preferred embodiment solves the equation (OP) for various values of Tf with Tf>Tfmin with α3 set to zero. In this latter case, Tf is treated as a constraint.
For those familiar with solutions to such optimal problems, it may be necessary to adjoin constraints, e.g. the speed limits along the path:
0≦v≦SL(x) i.
Or when using minimum time as the objective, that an end point constraint must hold, e.g. total fuel consumed must be less than what is in the tank, e.g. via:
Where WF is the fuel remaining in the tank at Tf. Those skilled in the art will readily recognize that equation (OP) can be in other forms as well and that what is presented above is an exemplary equation for use in the exemplary embodiment of the present invention.
Reference to emissions in the context of the exemplary embodiment of the present invention is actually directed towards cumulative emissions produced in the form of oxides of nitrogen (NOx), carbon oxides (COx), unburned hydrocarbons (HC), and particulate matter (PM), etc. However, other emissions may include, but not be limited to a maximum value of electromagnetic emission, such as a limit on radio frequency (RF) power output, measured in watts, for respective frequencies emitted by the locomotive. Yet another form of emission is the noise produced by the locomotive, typically measured in decibels (dB). An emission requirement may be variable based on a time of day, a time of year, and/or atmospheric conditions such as weather or pollutant level in the atmosphere. Emission regulations may vary geographically across a railroad system. For example, an operating area such as a city or state may have specified emission objectives, and an adjacent area may have different emission objectives, for example a lower amount of allowed emissions or a higher fee charged for a given level of emissions.
Accordingly, an emission profile for a certain geographic area may be tailored to include maximum emission values for each of the regulated emissions including in the profile to meet a predetermined emission objective required for that area. Typically, for a locomotive, these emission parameters are determined by, but not limited to, the power (Notch) setting, ambient conditions, engine control method, etc. By design, every locomotive must be compliant with EPA emission standards, and thus in an embodiment of the present invention that optimizes emissions this may refer to mission-total emissions, for which there is no current EPA specification. Operation of the locomotive according to the optimized trip plan is at all times compliant with EPA emission standards. Those skilled in the art will readily recognize that because diesel engines are used in other applications, other regulations may also be applicable. For example, CO2 emissions are considered in international treaties.
If a key objective during a trip mission is to reduce emissions, the optimal control formulation, equation (OP), would be amended to consider this trip objective. A key flexibility in the optimization setup is that any or all of the trip objectives can vary by geographic region or mission. For example, for a high priority train, minimum time may be the only objective on one route because it is high priority traffic. In another example emission output could vary from state to state along the planned train route.
To solve the resulting optimization problem, in an exemplary embodiment the present invention transcribes a dynamic optimal control problem in the time domain to an equivalent static mathematical programming problem with N decision variables, where the number ‘N’ depends on the frequency at which throttle and braking adjustments are made and the duration of the trip. For typical problems, this N can be in the thousands. For example in an exemplary embodiment, suppose a train is traveling a 172-mile stretch of track in the southwest United States. Utilizing the exemplary embodiment of the present invention, an exemplary 7.6% saving in fuel used may be realized when comparing a trip determined and followed using the exemplary embodiment of the present invention versus an actual driver throttle/speed history where the trip was determined by an operator. The improved savings is realized because the optimization realized by using the exemplary embodiment of the present invention produces a driving strategy with both less drag loss and little or no braking loss compared to the trip plan of the operator.
To make the optimization described above computationally tractable, a simplified model of the train may be employed, such as illustrated in
Referring back to
In some cases, the model used in the optimization may differ significantly from the actual train. This can occur for many reasons, including but not limited to, extra cargo pickups or setouts, locomotives that fail in route, and errors in the initial database 63 or data entry by the operator. For these reasons a monitoring system is in place that uses real-time train data to estimate locomotive and/or train parameters in real time 20. The estimated parameters are then compared to the assumed parameters used when the trip was initially created 22. Based on any differences in the assumed and estimated values, the trip may be re-planned 24, should large enough savings accrue from a new plan.
Other reasons a trip may be re-planned include directives from a remote location, such as dispatch and/or the operator requesting a change in objectives to be consistent with more global movement planning objectives. More global movement planning objectives may include, but are not limited to, other train schedules, allowing exhaust to dissipate from a tunnel, maintenance operations, etc. Another reason may be due to an onboard failure of a component. Strategies for re-planning may be grouped into incremental and major adjustments depending on the severity of the disruption, as discussed in more detail below. In general, a “new” plan must be derived from a solution to the optimization problem equation (OP) described above, but frequently faster approximate solutions can be found, as described herein.
In operation, the locomotive 42 will continuously monitor system efficiency and continuously update the trip plan based on the actual efficiency measured, whenever such an update would improve trip performance. Re-planning computations may be carried out entirely within the locomotive(s) or fully or partially moved to a remote location, such as dispatch or wayside processing facilities where wireless technology is used to communicate the plans to the locomotive 42. The exemplary embodiment of the present invention may also generate efficiency trends that can be used to develop locomotive fleet data regarding efficiency transfer functions. The fleet-wide data may be used when determining the initial trip plan, and may be used for network-wide optimization tradeoff when considering locations of a plurality of trains. For example, the travel-time fuel use tradeoff curve as illustrated in
Many events in daily operations can lead to a need to generate or modify a currently executing plan, where it desired to keep the same trip objectives, for when a train is not on schedule for planned meet or pass with another train and it needs to make up time. Using the actual speed, power and location of the locomotive, a comparison is made between a planned arrival time and the currently estimated (predicted) arrival time 25. Based on a difference in the times, as well as the difference in parameters (detected or changed by dispatch or the operator), the plan is adjusted 26. This adjustment may be made automatically following a railroad company's desire for how such departures from plan should be handled or manually propose alternatives for the on-board operator and dispatcher to jointly decide the best way to get back on plan. Whenever a plan is updated but where the original objectives, such as but not limited to arrival time remain the same, additional changes may be factored in concurrently, e.g. new future speed limit changes, which could affect the feasibility of ever recovering the original plan. In such instances if the original trip plan cannot be maintained, or in other words the train is unable to meet the original trip plan objectives, as discussed herein other trip plan(s) may be presented to the operator and/or remote facility, or dispatch.
A re-plan may also be made when it is desired to change the original objectives. Such re-planning can be done at either fixed preplanned times, manually at the discretion of the operator or dispatcher, or autonomously when predefined limits, such a train operating limits, are exceeded. For example, if the current plan execution is running late by more than a specified threshold, such as thirty minutes, the exemplary embodiment of the present invention can re-plan the trip to accommodate the delay at expense of increased fuel as described above or to alert the operator and dispatcher how much of the time can be made up at all (i.e. what minimum time to go or the maximum fuel that can be saved within a time constraint). Other triggers for re-plan can also be envisioned based on fuel consumed or the health of the power consist, including but not limited time of arrival, loss of horsepower due to equipment failure and/or equipment temporary malfunction (such as operating too hot or too cold), and/or detection of gross setup errors, such in the assumed train load. That is, if the change reflects impairment in the locomotive performance for the current trip, these may be factored into the models and/or equations used in the optimization.
Changes in plan objectives can also arise from a need to coordinate events where the plan for one train compromises the ability of another train to meet objectives and arbitration at a different level, e.g. the dispatch office is required. For example, the coordination of meets and passes may be further optimized through train-to-train communications. Thus, as an example, if a train knows that it is behind in reaching a location for a meet and/or pass, communications from the other train can notify the late train (and/or dispatch). The operator can then enter information pertaining to being late into the exemplary embodiment of the present invention wherein the exemplary embodiment will recalculate the train's trip plan. The exemplary embodiment of the present invention can also be used at a high level, or network-level, to allow a dispatch to determine which train should slow down or speed up should a scheduled meet and/or pass time constraint may not be met. As discussed herein, this is accomplished by trains transmitting data to the dispatch to prioritize how each train should change its planning objective. A choice could depend either from schedule or fuel saving benefits, depending on the situation.
For any of the manually or automatically initiated re-plans, exemplary embodiments of the present invention may present more than one trip plan to the operator. In an exemplary embodiment the present invention will present different profiles to the operator, allowing the operator to select the arrival time and understand the corresponding fuel and/or emission impact. Such information can also be provided to the dispatch for similar consideration, either as a simple list of alternatives or as a plurality of tradeoff curves such as illustrated in
The exemplary embodiment of the present invention has the ability of learning and adapting to key changes in the train and power consist which can be incorporated either in the current plan and/or for future plans. For example, one of the triggers discussed above is loss of horsepower. When building up horsepower over time, either after a loss of horsepower or when beginning a trip, transition logic is utilized to determine when desired horsepower is achieved. This information can be saved in the locomotive database 61 for use in optimizing either future trips or the current trip should loss of horsepower occur again.
A track characterization element 33 to provide information about a track, principally grade and elevation and curvature information, is also provided. The track characterization element 33 may include an on-board track integrity database 36. Sensors 38 are used to measure a tractive effort 40 being hauled by the locomotive consist 42, throttle setting of the locomotive consist 42, locomotive consist 42 configuration information, speed of the locomotive consist 42, individual locomotive configuration, individual locomotive capability, etc. In an exemplary embodiment the locomotive consist 42 configuration information may be loaded without the use of a sensor 38, but is input by other approaches as discussed above. Furthermore, the health of the locomotives in the consist may also be considered. For example, if one locomotive in the consist is unable to operate above power notch level 5, this information is used when optimizing the trip plan.
Information from the locator element may also be used to determine an appropriate arrival time of the train 31. For example, if there is a train 31 moving along a track 34 towards a destination and no train is following behind it, and the train has no fixed arrival deadline to adhere to, the locator element, including but not limited to radio frequency automatic equipment identification (RF AEI) Tags, dispatch, and/or video determination, may be used to gage the exact location of the train 31. Furthermore, inputs from these signaling systems may be used to adjust the train speed. Using the on-board track database, discussed below, and the locator element, such as GPS, the exemplary embodiment of the present invention can adjust the operator interface to reflect the signaling system state at the given locomotive location. In a situation where signal states would indicate restrictive speeds ahead, the planner may elect to slow the train to conserve fuel consumption.
Information from the locator element 30 may also be used to change planning objectives as a function of distance to destination. For example, owing to inevitable uncertainties about congestion along the route, “faster” time objectives on the early part of a route may be employed as hedge against delays that statistically occur later. If it happens on a particular trip that delays do not occur, the objectives on a latter part of the journey can be modified to exploit the built-in slack time that was banked earlier, and thereby recover some fuel efficiency. A similar strategy could be invoked with respect to emissions restrictive objectives, e.g. approaching an urban area.
As an example of the hedging strategy, if a trip is planned from New York to Chicago, the system may have an option to operate the train slower at either the beginning of the trip or at the middle of the trip or at the end of the trip. The exemplary embodiment of the present invention would optimize the trip plan to allow for slower operation at the end of the trip since unknown constraints, such as but not limited to weather conditions, track maintenance, etc., may develop and become known during the trip. As another consideration, if traditionally congested areas are known, the plan is developed with an option to have more flexibility around these traditionally congested regions. Therefore, the exemplary embodiment of the present invention may also consider weighting/penalty as a function of time/distance into the future and/or based on known/past experience. Those skilled in the art will readily recognize that such planning and re-planning to take into consideration weather conditions, track conditions, other trains on the track, etc., may be taking into consideration at any time during the trip wherein the trip plan is adjust accordingly.
A requirement of the exemplary embodiment of the present invention is the ability to initially create and quickly modify on the fly any plan that is being executed. This includes creating the initial plan when a long distance is involved, owing to the complexity of the plan optimization algorithm. When a total length of a trip profile exceeds a given distance, an algorithm 46 may be used to segment the mission wherein the mission may be divided by waypoints. Though only a single algorithm 46 is discussed, those skilled in the art will readily recognize that more than one algorithm may be used where the algorithms may be connected together. The waypoint may include natural locations where the train 31 stops, such as, but not limited to, sidings where a meet with opposing traffic, or pass with a train behind the current train is scheduled to occur on single-track rail, or at yard sidings or industry where cars are to be picked up and set out, and locations of planned work. At such waypoints, the train 31 may be required to be at the location at a scheduled time and be stopped or moving with speed in a specified range. The time duration from arrival to departure at waypoints is called dwell time.
In an exemplary embodiment, the present invention is able to break down a longer trip into smaller segments in a special systematic way. Each segment can be somewhat arbitrary in length, but is typically picked at a natural location such as a stop or significant speed restriction, or at key mileposts that define junctions with other routes. Given a partition, or segment, selected in this way, a driving profile is created for each segment of track as a function of travel time taken as an independent variable, such as shown in
Once a trip plan is created as discussed above, a trajectory of speed and power versus distance is used to reach a destination with minimum fuel and/or emissions at the required trip time. There are several ways in which to execute the trip plan. As provided below in more detail, in an exemplary embodiment, when in a coaching mode information is displayed to the operator for the operator to follow to achieve the required power and speed determined according to the optimal trip plan. In this mode, the operating information is suggested operating conditions that the operator should use. In another exemplary embodiment, acceleration and maintaining a constant speed are performed. However, when the train 31 must be slowed, the operator is responsible for applying a braking system 52. In another exemplary embodiment of the present invention commands for powering and braking are provided as required to follow the desired speed-distance path.
Feedback control strategies are used to provide corrections to the power control sequence in the profile to correct for such events as, but not limited to, train load variations caused by fluctuating head winds and/or tail winds. Another such error may be caused by an error in train parameters, such as, but not limited to, train mass and/or drag, when compared to assumptions in the optimized trip plan. A third type of error may occur with information contained in the track database 36. Another possible error may involve un-modeled performance differences due to the locomotive engine, traction motor thermal deration and/or other factors. Feedback control strategies compare the actual speed as a function of position to the speed in the desired optimal profile. Based on this difference, a correction to the optimal power profile is added to drive the actual velocity toward the optimal profile. To assure stable regulation, a compensation algorithm may be provided which filters the feedback speeds into power corrections to assure closed-performance stability is assured. Compensation may include standard dynamic compensation as used by those skilled in the art of control system design to meet performance objectives.
Exemplary embodiments of the present invention allow the simplest and therefore fastest means to accommodate changes in trip objectives, which is the rule, rather than the exception in railroad operations. In an exemplary embodiment to determine the fuel-optimal trip from point A to point B where there are stops along the way, and for updating the trip for the remainder of the trip once the trip has begun, a sub-optimal decomposition method is usable for finding an optimal trip profile. Using modeling methods the computation method can find the trip plan with specified travel time and initial and final speeds, so as to satisfy all the speed limits and locomotive capability constraints when there are stops. Though the following discussion is directed towards optimizing fuel use, it can also be applied to optimize other factors, such as, but not limited to, emissions, schedule, crew comfort, and load impact. The method may be used at the outset in developing a trip plan, and more importantly to adapting to changes in objectives after initiating a trip.
As discussed herein, exemplary embodiments of the present invention may employ a setup as illustrated in the exemplary flow chart depicted in
Using the optimal control setup described previously, the present computation method can find the trip plan with specified travel time and initial and final speeds, so as to satisfy all the speed limits and locomotive capability constraints when there are stops. Though the following detailed discussion is directed towards optimizing fuel use, it can also be applied to optimize other factors as discussed herein, such as, but not limited to, emissions. A key flexibility is to accommodate desired dwell time at stops and to consider constraints on earliest arrival and departure at a location as may be required, for example, in single-track operations where the time to be in or get by a siding is critical.
Exemplary embodiments of the present invention find a fuel-optimal trip from distance D0 to DM, traveled in time T, with M−1 intermediate stops at D1, . . . , DM-1, and with the arrival and departure times at these stops constrained by
tmin(i)≦tarr(Di)≦tmax(i)−Δti
tarr(Di)+Δti≦tdep(Di)≦tmax(i)i=1, . . . ,M−1
where tarr(Di), tdep(Di), and Δti are the arrival, departure, and minimum stop time at the ith stop, respectively. Assuming that fuel-optimality implies minimizing stop time, therefore tdep(Di)=tarr(Di)+Δti which eliminates the second inequality above. Suppose for each i=1, . . . , M, the fuel-optimal trip from Di-1 to Di for travel time t, Tmin(i)≦t≦Tmax(i), is known. Let Fi(t) be the fuel-use corresponding to this trip. If the travel time from Dj-1 to Dj is denoted Tj, then the arrival time at Di is given by
where Δt0 is defined to be zero. The fuel-optimal trip from D0 to DM for travel time T is then obtained by finding Ti, i=1, . . . , M, which minimize
subject to
Once a trip is underway, the issue is re-determining the fuel-optimal solution for the remainder of a trip (originally from D0 to DM in time T) as the trip is traveled, but where disturbances preclude following the fuel-optimal solution. Let the current distance and speed be x and v, respectively, where Di-1<x≦Di. Also, let the current time since the beginning of the trip be tact. Then the fuel-optimal solution for the remainder of the trip from x to DM, which retains the original arrival time at DM, is obtained by finding {tilde over (T)}i, Tj, j=i+1, . . . M, which minimize
subject to
Here, {tilde over (F)}i(t,x,v) is the fuel-used of the optimal trip from x to Di, traveled in time t, with initial speed at x of v.
As discussed above, an exemplary way to enable more efficient re-planning is to construct the optimal solution for a stop-to-stop trip from partitioned segments. For the trip from Di-1 to Di, with travel time Ti, choose a set of intermediate points Dij, j=1, . . . , Ni−1. Let Di0=Di-1 and DiN
where fij(t,vi,j-1,vij) is the fuel-use for the optimal trip from Di,j-1 to Dij, traveled in time t, with initial and final speeds of vi,j-1 and vij. Furthermore, tij is the time in the optimal trip corresponding to distance Dij. By definition, tiN
The above expression enables the function Fi(t) to be alternatively determined by first determining the functions fij(•),1≦j≦Ni, then finding τij,1≦j≦Ni and vij,1≦j<Ni, which minimize
subject to
By choosing Dij (e.g., at speed restrictions or meeting points), vmax(i,j)−vmin(i,j) can be minimized, thus minimizing the domain over which fij( ) needs to be known.
Based on the partitioning above, a simpler suboptimal re-planning approach than that described above is to restrict re-planning to times when the train is at distance points Dij,1≦i≦M,1≦j≦Ni. At point Dij, the new optimal trip from Dij to DM can be determined by finding τik,j<k≦Ni, vik,j<k<Ni, and τmn,i<m≦M,1≦n≦Nm, vmn,i<m≦M,1≦n<Nm, which minimize
subject to
where
A further simplification is obtained by waiting on the re-computation of Tm,i<m≦M, until distance point Di is reached. In this way, at points Dij between Di-1 and Di, the minimization above needs only be performed over τik,j<k≦Ni, vik,j<k<Ni. Ti is increased as needed to accommodate any longer actual travel time from Di-1 to Dij than planned. This increase is later compensated, if possible, by the re-computation of Tm,i<m≦M, at distance point Di.
With respect to the closed-loop configuration disclosed above, the total input energy required to move a train 31 from point A to point B consists of the sum of four components, specifically difference in kinetic energy between points A and B; difference in potential energy between points A and B; energy loss due to friction and other drag losses; and energy dissipated by the application of brakes. Assuming the start and end speeds to be equal (e.g., stationary), the first component is zero. Furthermore, the second component is independent of driving strategy. Thus, it suffices to minimize the sum of the last two components.
Following a constant speed profile minimizes drag loss. Following a constant speed profile also minimizes total energy input when braking is not needed to maintain constant speed. However, if braking is required to maintain constant speed, applying braking just to maintain constant speed will most likely increase total required energy because of the need to replenish the energy dissipated by the brakes. A possibility exists that some braking may actually reduce total energy usage if the additional brake loss is more than offset by the resultant decrease in drag loss caused by braking, by reducing speed variation.
After completing a re-plan from the collection of events described above, the new optimal notch/speed plan can be followed using the closed loop control described herein. However, in some situations there may not be enough time to carry out the segment decomposed planning described above, and particularly when there are critical speed restrictions that must be respected, an alternative is needed. Exemplary embodiments of the present invention accomplish this with an algorithm referred to as “smart cruise control”. The smart cruise control algorithm is an efficient way to generate, on the fly, an energy-efficient (hence fuel-efficient) sub-optimal prescription for driving the train 31 over a known terrain. This algorithm assumes knowledge of the position of the train 31 along the track 34 at all times, as well as knowledge of the grade and curvature of the track versus position. The method relies on a point-mass model for the motion of the train 31, whose parameters may be adaptively estimated from online measurements of train motion as described earlier.
The smart cruise control algorithm has three principal components, specifically a modified speed limit profile that serves as an energy-efficient (and/or emissions efficient or any other objective function) guide around speed limit reductions; an ideal throttle or dynamic brake setting profile that attempts to balance between minimizing speed variation and braking; and a mechanism for combining the latter two components to produce a notch command, employing a speed feedback loop to compensate for mismatches of modeled parameters when compared to reality parameters. Smart cruise control can accommodate strategies in exemplary embodiments of the present invention that do no active braking (i.e. the driver is signaled and assumed to provide the requisite braking) or a variant that does active braking.
With respect to the cruise control algorithm that does not control dynamic braking, the three exemplary components are a modified speed limit profile that serves as an energy-efficient guide around speed limit reductions, a notification signal directed to notify the operator when braking should be applied, an ideal throttle profile that attempts to balance between minimizing speed variations and notifying the operator to apply braking, a mechanism employing a feedback loop to compensate for mismatches of model parameters to reality parameters.
Also included in exemplary embodiments of the present invention is an approach to identify key parameter values of the train 31. For example, with respect to estimating train mass, a Kalman filter and a recursive least-squares approach may be utilized to detect errors that may develop over time.
As discussed above, the driving advisor 51 can automatically set a notch power, either a pre-established notch setting or an optimum continuous notch power. In addition to supplying a speed command to the locomotive 31, a display 68 is provided so that the operator can view what the planner has recommended. The operator also has access to a control panel 69. Through the control panel 69 the operator can decide whether to apply the notch power recommended. Towards this end, the operator may limit a targeted or recommended power. That is, at any time the operator always has final authority over what power setting the locomotive consist will operate at. This includes deciding whether to apply braking if the trip plan recommends slowing the train 31. For example, if operating in dark territory, or where information from wayside equipment cannot electronically transmit information to a train and instead the operator views visual signals from the wayside equipment, the operator inputs commands based on information contained in track database and visual signals from the wayside equipment. Based on how the train 31 is functioning, information regarding fuel measurement is supplied to the fuel rate estimator 64. Since direct measurement of fuel flows is not typically available in a locomotive consist, all information on fuel consumed so far within a trip and projections into the future following optimal plans is carried out using calibrated physics models such as those used in developing the optimal plans. For example, such predictions may include but are not limited to, the use of measured gross horse-power and known fuel characteristics and emissions characteristics to derive the cumulative fuel used and emissions generated.
The train 31 also has a locator device 30 such as a GPS sensor, as discussed above. Information is supplied to the train parameters estimator 65. Such information may include, but is not limited to, GPS sensor data, tractive/braking effort data, braking status data, speed and any changes in speed data. With information regarding grade and speed limit information, train weight and drag coefficients information is supplied to the executive control element 62.
Exemplary embodiments of the present invention may also allow for the use of continuously variable power throughout the optimization planning and closed loop control implementation. In a conventional locomotive, power is typically quantized to eight discrete levels. Modern locomotives can realize continuous variation in horsepower which may be incorporated into the previously described optimization methods. With continuous power, the locomotive 42 can further optimize operating conditions, e.g., by minimizing auxiliary loads and power transmission losses, and fine tuning engine horsepower regions of optimum efficiency, or to points of increased emissions margins. Example include, but are not limited to, minimizing cooling system losses, adjusting alternator voltages, adjusting engine speeds, and reducing number of powered axles. Further, the locomotive 42 may use the on-board track database 36 and the forecasted performance requirements to minimize auxiliary loads and power transmission losses to provide optimum efficiency for the target fuel consumption/emissions. Examples include, but are not limited to, reducing a number of powered axles on flat terrain and pre-cooling the locomotive engine prior to entering a tunnel.
Exemplary embodiments of the present invention may also use the on-board track database 36 and the forecasted performance to adjust the locomotive performance, such as to insure that the train has sufficient speed as it approaches a hill and/or tunnel. For example, this could be expressed as a speed constraint at a particular location that becomes part of the optimal plan generation created solving the equation (OP). Additionally, exemplary embodiments of the present invention may incorporate train-handling rules, such as, but not limited to, tractive effort ramp rates, maximum braking effort ramp rates. These may incorporated directly into the formulation for optimum trip profile or alternatively incorporated into the closed loop regulator used to control power application to achieve the target speed.
In a preferred embodiment the present invention is only installed on a lead locomotive of the train consist. Even though exemplary embodiments of the present invention are not dependent on data or interactions with other locomotives, it may be integrated with a consist manager, as disclosed in U.S. Pat. No. 6,691,957 and patent application Ser. No. 10/429,596 (owned by the Assignee and both incorporated by reference), functionality and/or a consist optimizer functionality to improve efficiency. Interaction with multiple trains is not precluded as illustrated by the example of dispatch arbitrating two “independently optimized” trains described herein.
Trains with distributed power systems can be operated in different modes. One mode is where all locomotives in the train operate at the same notch command. So if the lead locomotive is commanding motoring—N8, all units in the train will be commanded to generate motoring—N8 power. Another mode of operation is “independent” control. In this mode, locomotives or sets of locomotives distributed throughout the train can be operated at different motoring or braking powers. For example, as a train crests a mountaintop, the lead locomotives (on the down slope of mountain) may be placed in braking, while the locomotives in the middle or at the end of the train (on the up slope of mountain) may be in motoring. This is done to minimize tensile forces on the mechanical couplers that connect the railcars and locomotives. Traditionally, operating the distributed power system in “independent” mode required the operator to manually command each remote locomotive or set of locomotives via a display in the lead locomotive. Using the physics based planning model, train set-up information, on-board track database, on-board operating rules, location determination system, real-time closed loop power/brake control, and sensor feedback, the system shall automatically operate the distributed power system in “independent” mode.
When operating in distributed power, the operator in a lead locomotive can control operating functions of remote locomotives in the remote consists via a control system, such as a distributed power control element. Thus when operating in distributed power, the operator can command each locomotive consist to operate at a different notch power level (or one consist could be in motoring and other could be in braking) wherein each individual locomotive in the locomotive consist operates at the same notch power. In an exemplary embodiment, with an exemplary embodiment of the present invention installed on the train, preferably in communication with the distributed power control element, when a notch power level for a remote locomotive consist is desired as recommended by the optimized trip plan, the exemplary embodiment of the present invention will communicate this power setting to the remote locomotive consists for implementation. As discussed below, the same is true regarding braking.
Exemplary embodiments of the present invention may be used with consists in which the locomotives are not contiguous, e.g., with 1 or more locomotives up front, others in the middle and at the rear for train. Such configurations are called distributed power wherein the standard connection between the locomotives is replaced by radio link or auxiliary cable to link the locomotives externally. When operating in distributed power, the operator in a lead locomotive can control operating functions of remote locomotives in the consist via a control system, such as a distributed power control element. In particular, when operating in distributed power, the operator can command each locomotive consist to operate at a different notch power level (or one consist could be in motoring and other could be in braking) wherein each individual in the locomotive consist operates at the same notch power.
In an exemplary embodiment, with an exemplary embodiment of the present invention installed on the train, preferably in communication with the distributed power control element, when a notch power level for a remote locomotive consist is desired as recommended by the optimized trip plan, the exemplary embodiment of the present invention will communicate this power setting to the remote locomotive consists for implementation. As discussed below, the same is true regarding braking. When operating with distributed power, the optimization problem previously described can be enhanced to allow additional degrees of freedom, in that each of the remote units can be independently controlled from the lead unit. The value of this is that additional objectives or constraints relating to in-train forces may be incorporated into the performance function, assuming the model to reflect the in-train forces is also included. Thus exemplary embodiments of the present invention may include the use of multiple throttle controls to better manage in-train forces as well as fuel consumption and emissions.
In a train utilizing a consist manager, the lead locomotive in a locomotive consist may operate at a different notch power setting than other locomotives in that consist. The other locomotives in the consist operate at the same notch power setting. Exemplary embodiments of the present invention may be utilized in conjunction with the consist manager to command notch power settings for the locomotives in the consist. Thus based on exemplary embodiments of the present invention, since the consist manager divides a locomotive consist into two groups, lead locomotive and trail units, the lead locomotive will be commanded to operate at a certain notch power and the trail locomotives are commanded to operate at another certain notch power. In an exemplary embodiment the distributed power control element may be the system and/or apparatus where this operation is housed.
Likewise, when a consist optimizer is used with a locomotive consist, exemplary embodiments of the present invention can be used in conjunction with the consist optimizer to determine notch power for each locomotive in the locomotive consist. For example, suppose that a trip plan recommends a notch power setting of 4 for the locomotive consist. Based on the location of the train, the consist optimizer will take this information and then determine the notch power setting for each locomotive in the consist In this implementation, the efficiency of setting notch power settings over intra-train communication channels is improved. Furthermore, as discussed above, implementation of this configuration may be performed utilizing the distributed control system.
Furthermore, as discussed previously, exemplary embodiment of the present invention may be used for continuous corrections and re-planning with respect to when the train consist uses braking based on upcoming items of interest, such as but not limited to railroad crossings, grade changes, approaching sidings, approaching depot yards, and approaching fuel stations where each locomotive in the consist may require a different braking option. For example, if the train is coming over a hill, the lead locomotive may have to enter a braking condition whereas the remote locomotives, having not reached the peak of the hill may have to remain in a motoring state.
As illustrated in
The strip chart provides a look-ahead to changes in speed required to follow the optimal plan, which is useful in manual control, and monitors plan versus actual during automatic control. As discussed herein, such as when in the coaching mode, the operator can either follow the notch or speed suggested by exemplary embodiments of the present invention. The vertical bar gives a graphic of desired and actual notch, which are also displayed digitally below the strip chart. When continuous notch power is utilized, as discussed above, the display will simply round to closest discrete equivalent, the display may be an analog display so that an analog equivalent or a percentage or actual horse power/tractive effort is displayed.
Critical information on trip status is displayed on the screen, and shows the current grade the train is encountering 88, either by the lead locomotive, a location elsewhere along the train or an average over the train length. A distance traveled so far in the plan 90, cumulative fuel used 92, where or the distance away the next stop is planned 94, current and projected arrival time 96 expected time to be at next stop are also disclosed. The display 68 also shows the maximum possible time to destination possible with the computed plans available. If a later arrival was required, a re-plan would be carried out. Delta plan data shows status for fuel and schedule ahead or behind the current optimal plan. Negative numbers mean less fuel or early compared to plan, positive numbers mean more fuel or late compared to plan, and typically trade-off in opposite directions (slowing down to save fuel makes the train late and conversely).
At all times these displays 68 gives the operator a snapshot of where he stands with respect to the currently instituted driving plan. This display is for illustrative purpose only as there are many other ways of displaying/conveying this information to the operator and/or dispatch. Towards this end, the information disclosed above could be intermixed to provide a display different than the ones disclosed.
Other features that may be included in exemplary embodiments of the present invention include, but are not limited to, allowing for the generating of data logs and reports. This information may be stored on the train and downloaded to an off-board system at some point in time. The downloads may occur via manual and/or wireless transmission. This information may also be viewable by the operator via the locomotive display. The data may include such information as, but not limited to, operator inputs, time system is operational, fuel saved, fuel imbalance across locomotives in the train, train journey off course, system diagnostic issues such as if GPS sensor is malfunctioning.
Since trip plans must also take into consideration allowable crew operation time, exemplary embodiments of the present invention may take such information into consideration as a trip is planned. For example, if the maximum time a crew may operate is eight hours, then the trip shall be fashioned to include stopping location for a new crew to take the place of the present crew. Such specified stopping locations may include, but are not limited to rail yards, meet/pass locations, etc. If, as the trip progresses, the trip time may be exceeded, exemplary embodiments of the present invention may be overridden by the operator to meet criteria as determined by the operator. Ultimately, regardless of the operating conditions of the train, such as but not limited to high load, low speed, train stretch conditions, etc., the operator remains in control to command a speed and/or operating condition of the train.
Using exemplary embodiments of the present invention, the train may operate in a plurality of operations. In one operational concept, an exemplary embodiment of the present invention may provide commands for commanding propulsion and/or dynamic braking. The operator then handles all other train functions. In another operational concept, an exemplary embodiment of the present invention may provide commands for commanding propulsion only. The operator then handles dynamic braking and all other train functions. In yet another operational concept, an exemplary embodiment of the present invention may provide commands for commanding propulsion, dynamic braking and application of the airbrake. The operator then handles all other train functions.
Exemplary embodiments of the present invention may also be used by notify the operator of upcoming items of interest of actions to be taken. Specifically, the forecasting logic of exemplary embodiments of the present invention, the continuous corrections and re-planning to the optimized trip plan, the track database, the operator can be notified of upcoming crossings, signals, grade changes, brake actions, sidings, rail yards, fuel stations, etc. This notification may occur audibly and/or through the operator interface.
Specifically using the physics based planning model, train set-up information, on-board track database, on-board operating rules, location determination system, real-time closed loop power/brake control, and sensor feedback, the system shall present and/or notify the operator of required actions. The notification can be visual and/or audible. Examples include notifying of crossings that require the operator activate the locomotive horn and/or bell, notifying of “silent” crossings that do not require the operator activate the locomotive horn or bell.
In another exemplary embodiment, using the physics based planning model discussed above, train set-up information, on-board track database, on-board operating rules, location determination system, real-time closed power/brake control, and sensor feedback, exemplary embodiments of the present invention may present the operator information (e.g. a gauge on display) that allows the operator to see when the train will arrive at various locations as illustrated in
However as discussed below, the processor 245 may be located on the train 235, 236, 237 or aboard another train wherein train setup may be accomplished using inputs from the other train. For example, if a train has recently completed a mission over the same tracks, input from that train's mission may be supplied to the current train as it either is performing and/or is about to begin its mission. Thus configuring the train may occur at train run time, and even during the run time. For example, real time configuration data may be utilized to configure the train locomotives. One such example is provided above with respect to using data from another train. Another exemplary example entails using other data associated with trip optimization of the train as discussed above. Additionally the train setup may be performed using input from a plurality of sources, such as, but not limited to, a dispatch system, a wayside system 270, an operator, an off-line real time system, an external setup, a distributed network, a local network, and/or a centralized network.
As illustrated, one step in the flow chart 500 provides for determining a train load, step 510. When the engine is used in other applications, the load is determined based on the engine configuration. The train load may be determined with a load, or train load, estimator 560, as illustrated in
Another step includes identifying a mission time and/or duration for the diesel power system, step 520. With respect to engines used in other applications, this step equates to defining the mission time which the engine configuration is expected to accomplish the mission. A determination is made about a minimum total amount of power required based on the train load, step 530. The locomotive is selected to satisfy the minimum required power while yielding improved fuel efficiency and/or minimized emission output, step 540. The locomotive may be selected based on a type of locomotive (based on its engine) needed and/or a number of locomotives (based on a number of engines) needed. Similarly, with respect to diesel engines used in other power applications, such as but not limited to marine, OHV, and stationary power stations, where multiple units of each are used to accomplish an intended mission unique for the specific application.
Towards this end, a trip mission time determinator 570, as illustrated in
In another exemplary embodiment, the selection of locomotives may not be based solely on reducing a number of locomotives used in a train. For example, if the total power requirement is minimally met by five of the available locomotives when compared to also meeting the power requirement by the use of three of the available locomotives, the five locomotives are used instead of the three. In view of these options, those skilled in the art will readily recognize that minimum number of locomotives may be selected from a sequential (and random) set of available locomotives. Such an approach may be used when the train 235, 236, 237 is already compiled and a decision is being made at run time and/or during a mission wherein the remaining locomotives are not used to power the train 235, 236, 237, as discussed in further detail below.
While compiling the train 235, 236, 237, if the train 235, 236, 237 requires backup power, incremental locomotive 255, or locomotives, may be added. However this additional locomotive 255 is isolated to minimize fuel use, emission output, and power variation, but may be used to provide backup power in case an operating locomotive fails, and/or to provide additional power to accomplish the trip within an established mission time. The isolated locomotive 255 may be put into an AESS mode to minimize fuel use and having the locomotive available when needed. In an exemplary embodiment, if a backup, or isolated, locomotive 255 is provided, its dimensions, such as weight, may be taken into consideration when determining the train load.
Thus, as discussed above in more detail, determining minimum power needed to power the train 235, 236, 237 may occur at train run time and/or during a run (or mission). In this instance once a determination is made as to optimized train power and the locomotives or locomotive consists 42 in the train 235, 236, 237 are identified to provide the requisite power needed, the additional locomotive(s) 255 not identified for use are put in the idle, or AESS, mode.
In an exemplary embodiment, the total mission run may be broken into a plurality of sections, or segments, such as but not limited to at least 2 segments, such as segment A and segment B as illustrated in
Thus in operation, the lead locomotive may put the locomotive 255 provided for incremental power into an isolate mode until the power is needed. This may be accomplished by use of wired or wireless modems or communications from the operator, usually on the lead locomotive, to the isolated locomotive 255. In another exemplary embodiment the locomotives operate in a distributed power configuration and the isolated locomotive 255 is already integrated in the distributed power configuration, but is idle, and is switched on when the additional power is required. In yet another embodiment the operator puts the isolated locomotive 255 into the appropriate mode.
In an exemplary embodiment the initial setup of the locomotives, based on train load and mission time, is updated by the trip optimizer, as disclosed in above, and adjustments to the number and type of powered locomotives are made. As an exemplary illustration, consider a locomotive consist 42 of 3 locomotives having relative available maximum power of 1, 1.5 and 0.75, respectively. Relative available power is relative to a reference locomotive; railroads use ‘reference’ locomotives to determine the total consist power; this could be a ‘3000HP’ reference locomotive; hence, in this example the first locomotive has 3000 HP, the second 4500 HP and the third 2250 HP). Suppose that the mission is broken into seven segments. Given the above scenario the following combinations are available and can be matched to the track section load, 0.75, 1, 1.5, 1.75, 2.25, 2.5, 3.25, which is the combination of maximum relative HP settings for the consist. Thus for each respective relative HP setting mentioned above, for 0.75 the third locomotive is on and the first and second are off, for 1 the first locomotive is on and the second and third are off, etc. In a preferred embodiment the trip optimizer selects the maximum required load and adjusts via notch calls while minimizing an overlap of power settings. Hence, if a segment calls for between 2 and 2.5 (times 3000 HP) then locomotive 1 and locomotive 2 are used while locomotive 3 is in either idle or in standby mode, depending on the time it is in this segment and the restart time of the locomotive.
In another exemplary embodiment, an analysis may be performed to determine a trade off between emission output and locomotive power settings to maximize higher notch operation where the emissions from the exhaust after treatment devices are more optimal. This analysis may also take into consideration one of the other parameters discussed above regarding train operation optimization. This analysis may be performed for an entire mission run, segments of a mission run, and/or combinations of both.
The trip mission time determinator 570 may segment the mission into a plurality of mission segments, such as but not limited to segment A and segment B, as discussed above. The total amount of power may then be individually determined for each segment of the mission. As further discussed above, an additional locomotive 255 is part of the train 235, 236, 237 and is provided for back up power. The power from the back-up locomotive 255 may be used incrementally as a required is identified, such as but not limited to providing power to get the train 235, 236, 237 back on schedule for a particular trip segment. In this situation, the train 235, 236, 237 is operated to achieve and/or meet the trip mission time.
The train load estimator 560 may estimate the train load based on information contained in the train makeup docket 480, historical data, a rule of thumb estimation, and/or table data. Furthermore, the processor 245 may determine a trade off between emission output and locomotive power settings to maximize higher notch operation where the emissions from the exhaust after-treatment devices are optimized.
When selecting the diesel-fueled power generating unit, such factors considered include a type of engine needed and/or a number of engines needed. Furthermore, when selecting, the mission may be segmented into a plurality of mission segments and an engine configuration is selected for each mission segment. Additionally, when selecting the engine configuration information from a number of sources may be considered, such as but not limited to, a dispatch system, a wayside system, an operator, an off-line real time system, an external setup, a distributed network, a local network, and a centralized network. When determining a load, the load may be determined based on information contained in a load makeup docket, historical data, rule of thumb estimation, and/or table data. Engine configuration requirements may be further determined based on emission limits. Similarly, engine configuration may be based on a desired fuel efficiency and/or a desired emission output.
While exemplary embodiment of the invention has been described with reference to an exemplary embodiment, it will be understood by those skilled in the art that various changes, omissions and/or additions may be made and equivalents may be substituted for elements thereof without departing from the spirit and scope of the invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the invention without departing from the scope thereof. Therefore, it is intended that the invention not be limited to the particular embodiment disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope of the appended claims. Moreover, unless specifically stated any use of the terms first, second, etc. do not denote any order or importance, but rather the terms first, second, etc. are used to distinguish one element from another.
This application claims priority to and is a Continuation-In-Part of U.S. application Ser. No. 11/385,354 filed Mar. 20, 2006, which is incorporated herein by reference. This application also claims priority to U.S. Provisional Application No. 60/849,100 filed Oct. 2, 2006, and U.S. Provisional Application No. 60/850,885 filed Oct. 10, 2006.
Number | Name | Date | Kind |
---|---|---|---|
2104652 | Inman | Jan 1938 | A |
2601634 | Rivette | Jun 1952 | A |
2927711 | Naggiar | Mar 1960 | A |
3519805 | Thorne-Booth | Jul 1970 | A |
3650216 | Harwick et al. | Mar 1972 | A |
3655962 | Koch | Apr 1972 | A |
3781139 | Lohse | Dec 1973 | A |
3794833 | Blazek et al. | Feb 1974 | A |
3865042 | DePaola et al. | Feb 1975 | A |
3886870 | Pelabon | Jun 1975 | A |
3948314 | Creswick et al. | Apr 1976 | A |
4005838 | Grundy | Feb 1977 | A |
4041283 | Mosier | Aug 1977 | A |
4042810 | Mosher | Aug 1977 | A |
4136432 | Melley, Jr. | Jan 1979 | A |
4181943 | Mercer et al. | Jan 1980 | A |
4253399 | Spigarelli | Mar 1981 | A |
4279395 | Boggio | Jul 1981 | A |
4344364 | Nickles et al. | Aug 1982 | A |
4401035 | Spigarelli et al. | Aug 1983 | A |
4548164 | Ylonen et al. | Oct 1985 | A |
4561057 | Haley et al. | Dec 1985 | A |
4602335 | Perlmutter | Jul 1986 | A |
4617627 | Yasunobu et al. | Oct 1986 | A |
4644705 | Saccomani et al. | Feb 1987 | A |
4663713 | Cornell et al. | May 1987 | A |
4711418 | Aver et al. | Dec 1987 | A |
4735385 | Nickles et al. | Apr 1988 | A |
4794548 | Lynch et al. | Dec 1988 | A |
4827438 | Nickles et al. | May 1989 | A |
4843575 | Crane | Jun 1989 | A |
4853883 | Nickles et al. | Aug 1989 | A |
5109343 | Budway | Apr 1992 | A |
5181541 | Bodenheimer | Jan 1993 | A |
5187945 | Dixon | Feb 1993 | A |
5197627 | Disabato et al. | Mar 1993 | A |
5239472 | Long et al. | Aug 1993 | A |
5240416 | Bennington | Aug 1993 | A |
5253153 | Mathews et al. | Oct 1993 | A |
5316174 | Schutz | May 1994 | A |
5363787 | Konopasek et al. | Nov 1994 | A |
5388034 | Allen et al. | Feb 1995 | A |
5398894 | Pascoe | Mar 1995 | A |
5437422 | Newman | Aug 1995 | A |
5440489 | Newman | Aug 1995 | A |
5460013 | Thomsen | Oct 1995 | A |
5487516 | Murata | Jan 1996 | A |
5623413 | Matheson | Apr 1997 | A |
5642827 | Madsen | Jul 1997 | A |
5651330 | Jewett | Jul 1997 | A |
5676059 | Alt | Oct 1997 | A |
5744707 | Kull | Apr 1998 | A |
5755349 | Brundle | May 1998 | A |
5758299 | Sandborg et al. | May 1998 | A |
5785392 | Hart | Jul 1998 | A |
5794172 | Matheson et al. | Aug 1998 | A |
5803411 | Ackerman et al. | Sep 1998 | A |
5828979 | Polivka et al. | Oct 1998 | A |
5950967 | Montgomery | Sep 1999 | A |
5957571 | Koster et al. | Sep 1999 | A |
5998915 | Scholz et al. | Dec 1999 | A |
6092021 | Ehlbeck et al. | Jul 2000 | A |
6112142 | Shockley et al. | Aug 2000 | A |
6123111 | Nathan et al. | Sep 2000 | A |
6125311 | Lo | Sep 2000 | A |
6129025 | Minakami et al. | Oct 2000 | A |
6144901 | Nickles et al. | Nov 2000 | A |
6198993 | Higashi et al. | Mar 2001 | B1 |
6230668 | McKenney et al. | May 2001 | B1 |
6243694 | Bonissone et al. | Jun 2001 | B1 |
6263266 | Hawthorne | Jul 2001 | B1 |
6269034 | Shibuya | Jul 2001 | B1 |
6270040 | Katzer et al. | Aug 2001 | B1 |
6308117 | Ryland et al. | Oct 2001 | B1 |
6325050 | DIllen et al. | Dec 2001 | B1 |
6332106 | Hawthorne et al. | Dec 2001 | B1 |
6363331 | Kyrtos et al. | Mar 2002 | B1 |
6380639 | Soucy et al. | Apr 2002 | B1 |
6404129 | Hendricx et al. | Jun 2002 | B1 |
6434452 | Gray et al. | Aug 2002 | B1 |
6459964 | Vu et al. | Oct 2002 | B1 |
6487488 | Peterson et al. | Nov 2002 | B1 |
6505103 | Howell et al. | Jan 2003 | B1 |
6516727 | Kraft | Feb 2003 | B2 |
6520124 | Hawkins et al. | Feb 2003 | B2 |
6549803 | Raghavan et al. | Apr 2003 | B1 |
6591758 | Kumar | Jul 2003 | B2 |
6609049 | Kane et al. | Aug 2003 | B1 |
6612245 | Kumar et al. | Sep 2003 | B2 |
6612246 | Kumar | Sep 2003 | B2 |
6615118 | Kumar | Sep 2003 | B2 |
6647328 | Huang et al. | Nov 2003 | B2 |
6676089 | Katzer et al. | Jan 2004 | B1 |
6691957 | Hess, Jr. et al. | Feb 2004 | B2 |
6694231 | Rezk | Feb 2004 | B1 |
6698913 | Yamamoto et al. | Mar 2004 | B2 |
6702235 | Katzer et al. | Mar 2004 | B2 |
6732023 | Sugita et al. | May 2004 | B2 |
6763291 | Houpt et al. | Jul 2004 | B1 |
6789005 | Hawthorne | Sep 2004 | B2 |
6810312 | Jammu et al. | Oct 2004 | B2 |
6824110 | Kane et al. | Nov 2004 | B2 |
6845953 | Kane et al. | Jan 2005 | B2 |
6853888 | Kane et al. | Feb 2005 | B2 |
6856865 | Hawthorne | Feb 2005 | B2 |
6863246 | Kane et al. | Mar 2005 | B2 |
6865454 | Kane et al. | Mar 2005 | B2 |
6873888 | Nakajima et al. | Mar 2005 | B2 |
6903658 | Kane et al. | Jun 2005 | B2 |
6910792 | Takada et al. | Jun 2005 | B2 |
6915191 | Kane et al. | Jul 2005 | B2 |
6922619 | Baig et al. | Jul 2005 | B2 |
6948837 | Suzuki | Sep 2005 | B2 |
6953272 | Hayakawa et al. | Oct 2005 | B2 |
6957131 | Kane et al. | Oct 2005 | B2 |
6973947 | Penaloza et al. | Dec 2005 | B2 |
6978195 | Kane et al. | Dec 2005 | B2 |
6980894 | Gordon et al. | Dec 2005 | B1 |
6996461 | Kane et al. | Feb 2006 | B2 |
7021588 | Hess et al. | Apr 2006 | B2 |
7021589 | Hess et al. | Apr 2006 | B2 |
7024289 | Kane et al. | Apr 2006 | B2 |
7036774 | Kane et al. | May 2006 | B2 |
7072747 | Armbruster et al. | Jul 2006 | B2 |
7073753 | Root et al. | Jul 2006 | B2 |
7079926 | Kane et al. | Jul 2006 | B2 |
7092800 | Kane et al. | Aug 2006 | B2 |
7092801 | Kane et al. | Aug 2006 | B2 |
7092894 | Crone | Aug 2006 | B1 |
7096171 | Hawthorne et al. | Aug 2006 | B2 |
7127336 | Houpt et al. | Oct 2006 | B2 |
7131403 | Banga et al. | Nov 2006 | B1 |
7164975 | Bidaud | Jan 2007 | B2 |
7222083 | Matheson et al. | May 2007 | B2 |
7302895 | Kumar et al. | Dec 2007 | B2 |
7340328 | Matheson et al. | Mar 2008 | B2 |
7343314 | Matheson et al. | Mar 2008 | B2 |
7347168 | Reckels et al. | Mar 2008 | B2 |
7349797 | Donnelly et al. | Mar 2008 | B2 |
7497201 | Hollenbeck | Mar 2009 | B2 |
7500436 | Kumar et al. | Mar 2009 | B2 |
7509193 | Kustosch | Mar 2009 | B2 |
7522990 | Daum et al. | Apr 2009 | B2 |
7539624 | Matheson et al. | May 2009 | B2 |
7558740 | Matheson et al. | Jul 2009 | B2 |
7618011 | Oleski et al. | Nov 2009 | B2 |
7667611 | Lindsey et al. | Feb 2010 | B2 |
7960855 | King et al. | Jun 2011 | B2 |
20010029411 | Hawthorne | Oct 2001 | A1 |
20010047241 | Khavakh et al. | Nov 2001 | A1 |
20020059075 | Schick et al. | May 2002 | A1 |
20020072833 | Gray | Jun 2002 | A1 |
20020093201 | Soucy | Jul 2002 | A1 |
20020096801 | Puniello et al. | Jul 2002 | A1 |
20020107618 | Deguchi et al. | Aug 2002 | A1 |
20020174653 | Uzkan | Nov 2002 | A1 |
20030001050 | Katzer | Jan 2003 | A1 |
20030034423 | Hess et al. | Feb 2003 | A1 |
20030076221 | Akiyama et al. | Apr 2003 | A1 |
20030091017 | Davenport et al. | May 2003 | A1 |
20030104899 | Keller | Jun 2003 | A1 |
20030105561 | Nickles et al. | Jun 2003 | A1 |
20030120400 | Baig et al. | Jun 2003 | A1 |
20030158640 | Pillar et al. | Aug 2003 | A1 |
20030183729 | Root et al. | Oct 2003 | A1 |
20030213875 | Hess et al. | Nov 2003 | A1 |
20030222981 | Kisak et al. | Dec 2003 | A1 |
20030229446 | Boscamp et al. | Dec 2003 | A1 |
20030233959 | Kumar | Dec 2003 | A1 |
20040010432 | Matheson et al. | Jan 2004 | A1 |
20040034556 | Matheson et al. | Feb 2004 | A1 |
20040068359 | Neiss et al. | Apr 2004 | A1 |
20040093245 | Matheson et al. | May 2004 | A1 |
20040098142 | Warren et al. | May 2004 | A1 |
20040104312 | Hess et al. | Jun 2004 | A1 |
20040108814 | Tsuda et al. | Jun 2004 | A1 |
20040111309 | Matheson et al. | Jun 2004 | A1 |
20040122569 | Bidaud | Jun 2004 | A1 |
20040129289 | Hafemann | Jul 2004 | A1 |
20040133315 | Kumar et al. | Jul 2004 | A1 |
20040172175 | Julich et al. | Sep 2004 | A1 |
20040174121 | Tsuda et al. | Sep 2004 | A1 |
20040245410 | Kisak et al. | Dec 2004 | A1 |
20050007020 | Tsuda et al. | Jan 2005 | A1 |
20050055287 | Schmidtberg et al. | Mar 2005 | A1 |
20050065674 | Houpt et al. | Mar 2005 | A1 |
20050085961 | Kane et al. | Apr 2005 | A1 |
20050109882 | Armbruster et al. | May 2005 | A1 |
20050120904 | Kumar et al. | Jun 2005 | A1 |
20050121005 | Edwards | Jun 2005 | A1 |
20050171655 | Flynn et al. | Aug 2005 | A1 |
20050171657 | Kumar | Aug 2005 | A1 |
20050188745 | Stephanos et al. | Sep 2005 | A1 |
20050196737 | Mann | Sep 2005 | A1 |
20050205719 | Hendrickson et al. | Sep 2005 | A1 |
20050234757 | Matheson et al. | Oct 2005 | A1 |
20050251299 | Donnelly et al. | Nov 2005 | A1 |
20050288832 | Smith et al. | Dec 2005 | A1 |
20060041341 | Kane et al. | Feb 2006 | A1 |
20060047379 | Schullian et al. | Mar 2006 | A1 |
20060060345 | Flik et al. | Mar 2006 | A1 |
20060085103 | Smith et al. | Apr 2006 | A1 |
20060085363 | Cheng et al. | Apr 2006 | A1 |
20060116789 | Subramanian et al. | Jun 2006 | A1 |
20060116795 | Abe et al. | Jun 2006 | A1 |
20060122737 | Tani et al. | Jun 2006 | A1 |
20060155434 | Kane et al. | Jul 2006 | A1 |
20060162973 | Harris et al. | Jul 2006 | A1 |
20060212188 | Kickbusch et al. | Sep 2006 | A1 |
20060277906 | Burk et al. | Dec 2006 | A1 |
20060282199 | Daum et al. | Dec 2006 | A1 |
20070061053 | Zeitzew | Mar 2007 | A1 |
20070112475 | Koebler et al. | May 2007 | A1 |
20070219680 | Kumar et al. | Sep 2007 | A1 |
20070219681 | Kumar et al. | Sep 2007 | A1 |
20070219683 | Daum et al. | Sep 2007 | A1 |
20070233364 | Kumar | Oct 2007 | A1 |
20070260369 | Philp et al. | Nov 2007 | A1 |
20070261648 | Reckels et al. | Nov 2007 | A1 |
20080004721 | Huff et al. | Jan 2008 | A1 |
20080128563 | Kumar et al. | Jun 2008 | A1 |
20080147256 | Liberatore | Jun 2008 | A1 |
20080208393 | Schricker | Aug 2008 | A1 |
20090063045 | Figueroa et al. | Mar 2009 | A1 |
20090140574 | Gorman et al. | Jun 2009 | A1 |
20090177345 | Severinsky et al. | Jul 2009 | A1 |
20090254239 | Daum et al. | Oct 2009 | A1 |
20090319092 | Piche | Dec 2009 | A1 |
20100152998 | Schwarzmann | Jun 2010 | A1 |
Number | Date | Country |
---|---|---|
197 26 542 | Nov 1998 | DE |
199 35 349 | Feb 2001 | DE |
199 35 353 | Feb 2001 | DE |
19935353 | Feb 2001 | DE |
100 45 921 | Mar 2012 | DE |
0 428 113 | May 1991 | EP |
0 445 047 | Sep 1991 | EP |
0 485 978 | May 1992 | EP |
0 554 983 | Aug 1993 | EP |
0 594 226 | Apr 1994 | EP |
1 136 969 | Jul 2002 | EP |
1 297 982 | Feb 2003 | EP |
1 297 982 | Apr 2003 | EP |
1 466 803 | Oct 2004 | EP |
1 253 059 | Aug 2006 | EP |
2 558 806 | Aug 1985 | FR |
2 129 215 | Oct 1992 | FR |
2 767 770 | Mar 1999 | FR |
482 625 | Dec 1936 | GB |
60 028153 | Feb 1985 | JP |
50-32733 | Sep 1993 | JP |
06-108869 | Apr 1994 | JP |
2001-065360 | Sep 1995 | JP |
WO 9525053 | Sep 1995 | WO |
WO 9914093 | Mar 1999 | WO |
WO 03097424 | Nov 2003 | WO |
WO 2004023517 | Mar 2004 | WO |
WO 2004051699 | Jun 2004 | WO |
WO 2004051700 | Jun 2004 | WO |
WO 2004052755 | Jun 2004 | WO |
WO 2004059446 | Jul 2004 | WO |
WO 2005061300 | Jul 2005 | WO |
WO 2007027130 | Mar 2007 | WO |
WO 2007091270 | Aug 2007 | WO |
Entry |
---|
Hoyt et al., “Assessing the effects of several variable on freigt train fuel consumption and performance using a train performance simulator”, Jan. 1, 1990; Transportation Research, pp. 99-112. |
ISR and WO pertaining to International application No. PCT/US2007/078340 dated Sep. 13, 2007. |
ISR and WO pertaining to International application No. PCT/US2008/083526 dated Nov. 14, 2008. |
ISR and WO pertaining to International application No. PCT/US2008/063193 dated May 9, 2008. |
ISR and WO pertaining to International application No. PCT/US2009/031740 dated Jan. 23, 2009. |
ISR and WO pertaining to International application No. PCT/US2009/032933 dated Feb. 3, 2009. |
ISR and WO pertaining to International application No. PCT/US2009/037293 dated Mar. 16, 2009. |
ISR and WO pertaining to International application No. PCT/US2009/045004 dated May 22, 2009. |
ISR pertaining to International application No. PCT/US2010/035058 dated May 17, 2010. |
ISR pertaining to International application No. PCT/US2010/047251 dated Aug. 31, 2010. |
ISR and WO pertaining to International application No. PCT US2006/032893 dated Aug. 24, 2006. |
ISR and WO pertaining to International application No. PCT/US2007/001428 dated Jan. 18, 2007. |
ISR and WO pertaining to International application No. PCT/US2007/066697 dated Apr. 16, 2007. |
ISR and WO pertaining to International application No. PCT/US2007/076699 dated Aug. 24, 2007. |
ISR and WO pertaining to International application No. PCT/US2007/078001 dated Sep. 10, 2007. |
ISR and WO pertaining to International application No. PCT/US2007/078016 dated Sep. 10, 2007. |
ISR and WO pertaining to International application No. PCT/US2007/078118 dated Sep. 11, 2007. |
Number | Date | Country | |
---|---|---|---|
20070219683 A1 | Sep 2007 | US |
Number | Date | Country | |
---|---|---|---|
60849100 | Oct 2006 | US | |
60850885 | Oct 2006 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 11385354 | Mar 2006 | US |
Child | 11669364 | US |