This application is directed, in general, to integrated circuits (ICs) and, more specifically, to a path monitor for an IC and a method of testing an IC.
When signals do not propagate through a circuit as needed, timing violations are created. To determine if timing problems exist with a particular IC, timing tests may be performed by manufacturers during chip testing. One example of a timing test is at-speed testing. At-speed testing can assist in determining timing violations for particular paths, such as critical paths, of an IC by applying a test pattern and capturing the response of the test pattern after propagating along a path. For at-speed testing, the test pattern can be a scan pattern or a functional pattern. To prevent timing violations in chips, improved timing tests would be beneficial.
One aspect provides a timing error sampling generator for determining timing violations of monitored paths. In one embodiment, the timing error sampling generator includes: (1) a hold delay element having an input and an output and configured to provide a hold violation delayed signal at the output by providing a first predetermined delay to a clock signal received at the input, the first predetermined delay corresponding to a hold violation time for a path to be monitored and (2) a hold logic element having a first input coupled to the input of the hold delay element, a second input coupled to the output of the hold delay element and an output at which the hold logic element is configured to respond to the first and second inputs to provide a clock hold signal when logic levels at the first and second inputs are at a same level.
Another aspect provides a method of performing a timing test on a path. In one embodiment, the method includes: (1) generating a comparison signal based on a data signal from the path and a clocked data signal, (2) generating a clock hold signal employing first logic circuitry and a hold delay element that provides a first predetermined delay corresponding to a hold violation time for the path and (3) providing an error hold signal based on the comparison signal and the clock hold signal to indicate a hold violation of the path.
In yet another aspect, a path monitor is provided. In one embodiment, the path monitor includes: (1) a DQ flip-flop having an input coupled to a path to monitor, a clock input coupled to a clock, and an output, (2) comparison circuitry having an output, a first input coupled to the path and a second input coupled to the DQ flip-flop output, (3) logic circuitry having a first input, a second input and an output, the first input coupled to the comparison circuitry output and (4) a timing error sampling generator having a clock input coupled to the clock and a first output coupled to the logic circuitry second input; the logic circuitry configured to respond to the first input and the second input thereof to provide a first error signal when both of the first and second inputs thereof are at a same logic level.
In a different aspect, an IC is provided. In one embodiment, the IC includes: (1) a substrate, (2) a plurality of paths located on the substrate and (3) a corresponding plurality of associated path monitors located on the substrate. At least one of the path monitors includes: (3A) a DQ flip-flop having an input coupled to a path to monitor, a clock input coupled to a clock, and an output, (3B) comparison circuitry having an output, a first input coupled to the path and a second input coupled to the DQ flip-flop output, (3C) an AND gate having a first input, a second input and an output, the first input coupled to the comparison circuitry output and (3D) a timing error sampling generator having a clock input coupled to the clock and a first output coupled to the AND gate second input, the AND gate configured to respond to the first input and the second input thereof to provide a first error signal at the output thereof when both of the first and second inputs thereof are at a same logic level. The IC also further includes: (4) error logic circuitry located on the substrate and coupled to the AND gate output of the path monitors and (5) a voltage management unit located on the substrate and configured to receive an overall error signal from an output of the error logic circuitry and control a voltage of the integrated circuit based thereon.
In still another aspect, a library of standard logic elements is provided. In one embodiment, the library includes a standard logic element corresponding to a timing error sampling generator.
Reference is now made to the following descriptions taken in conjunction with the accompanying drawings, in which:
Disclosed herein are path monitors couplable to paths of an IC to detect timing violations of a specific path. Typically, the specific path is a critical (timing critical) path of the IC. As such, the path monitor will be a critical path monitor (CPM). The timing violations may be hold violations or setup violations. A setup violation occurs when a signal propagates too slowly through a critical path. A hold violation occurs when a signal propagates too quickly through the critical path. Timing setup violations or timing hold violations (also referred herein as setup violations and hold violations) frustrate the logic of an IC and prevent the IC from performing the job it was designed to do. As such, the CPMs are used to ensure the signal propagation speed along a critical path of an IC is operating as intended.
The CPMs can be used in timing test circuits to provide robust and effective timing test to detect setup and hold violations and the defects that cause at-speed failures. As such, the disclosed CPMs can be used for timing tests of ICs to catch timing violations during chip testing. As disclosed herein, the CPMs can also be used during native mode of operation.
The disclosed CPMs provide error signals indicating a timing violation. In one embodiment discussed herein, a CPM is provided that detects only hold violations during testing or native mode of operation. Additionally, a hybrid CPM design is disclosed that can detect both hold and setup violations during testing or native mode of operation. Thus, the hybrid CPM design can distinguish between hold violations and setup violations. The disclosed CPMs, therefore, can be used to identify if timing errors have occurred, determine the type of timing violation, a setup violation or a hold violation, and allow the timing violation to be caught during chip testing to allow corrections.
The CPMs can be used for at-speed testing in conjunction with scan patterns or functional patterns. When used during the native mode of operation, the CPMs can be used for power optimization where the voltage or frequency is adjusted to save power. In other words, IC components are run at an optimal voltage to minimize power while there are no errors, (i.e., setup and hold violations). If an error is detected by a CPM, then the voltages/frequencies can be corrected to eliminate the error.
Also disclosed herein are circuits, referred to as a timing error sampling generator, for generating clock hold signals and setup hold signals for the disclosed CPMs. The clock hold and setup signals correspond to hold violations and setup violations, respectively, of a circuit with respect to the clock speed of the circuit.
In a step 110, a comparison signal is generated based on a data signal from the critical path and a clocked data signal. Comparison circuitry, such as an exclusive NOR gate, may be employed to generate the comparison signal. A scan pattern may be used to generate the data signal and the clock signal. A clock hold signal is generated in a step 520 employing first logic circuitry and a hold delay element that provides a first predetermined delay corresponding to a hold violation time for the critical path. The first logic circuitry may be a AND gate.
Additionally, a clock setup signal is generated in a step 130 employing second logic circuitry and a setup delay element that provides a second predetermined delay corresponding to a setup violation time for the path. The second logic circuitry may be a AND gate.
An error hold signal is provided in a step 140 based on the comparison signal and the clock hold signal to indicate a hold violation of the path. An AND gate may be used to generate the error hold signal. In one embodiment, the error hold signal is provided when the comparison signal and the clock hold signal are at a high logic level. In one embodiment the error hold signal may be provided only when the comparison signal and the clock hold signal are at the same logic level.
In a step 150, an error setup signal is provided based on the comparison signal and the clock setup signal to indicate a setup violation of the path. An AND gate may be used to generate the error hold signal. In one embodiment, the error setup signal is provided when the comparison signal and the clock setup signal are at a high logic level. In some embodiments, the error setup signal may be provided only when the comparison signal and the clock setup signal are at the same logic level.
Additionally, only a single logic element may be employed when providing the clock hold signal. Similarly, only a single logic element may be employed when providing the clock setup signal. As noted above, each of the single logic elements may be an AND gate.
Based on the error hold signal and the error setup signal, a type of timing violation can be identified in a step 160. The type of timing violation can be provided as an output in a step 170. The type of timing violation can be provided to the ATE for a designer to review. With this knowledge, alterations can be made to the IC to correct the timing violation. The method 100 then ends in a step 180.
The DQ flip-flop 210 is a clocked flip-flop having a D input that receives data from the critical path being monitored and a clocked input that receives a clock signal to drive the DQ flip-flop 210. The DQ flip-flop 210 also includes a Q output that provides ‘clocked data signal’ based on the received data and a transition of the clock signal.
The comparison circuitry 220 has a first input, a second input and an output. The first input of the comparison circuitry 220 is coupled to the D input of the DQ flip-flop 210 and the second input is coupled to the Q output of the DQ flip-flop 210. Like the D input of the DQ flip-flop 210, the first input of the comparison circuitry 220 receives the data from the critical path being monitored. At the second input, the comparison circuitry 220 receives the clocked data signal from the Q output after the DQ flip-flop 210 has been triggered. The output of the comparison circuitry 220 is configured to provide a ‘comparison signal’ based on the data signal and the clocked data signal. In the illustrated embodiment, the comparison signal is a low logic level signal when both the data signal and the clocked data signal are at a high logic level. In the illustrated embodiment, the comparison circuitry 220 is an unclocked logic element that produces an asynchronous comparison signal.
The AND gate 230 is also an unclocked logic element. The AND gate 230 is configured to produce an error signal based on the comparison signal and a clock hold signal generated by the timing error sampling generator 240. The clock hold signal can be used to mark the interval during which the comparison signal is signaled. The AND gate 230 includes a first input, a second input and an output. The first input of the AND gate 230 is coupled to the output of the comparison circuitry 220 and receives the comparison signal therefrom. The second input of the AND gate 230 is coupled to the timing error sampling generator 240 and receives the clock hold signal therefrom. The output of the AND gate 230 is configured to respond to the comparison signal and the clock hold signal and provide an error hold signal when both the comparison signal and the clock hold signal are at the same logic level (which is a high logic level in the illustrated embodiment). As such, the AND gate 230 can be considered a timing violation signal generator. The error hold signal can be provided as an output during chip testing to allow for modifications to the path or IC to correct the hold violation or to mark the path. The error hold signal can also be provided to a voltage management unit (VMU) via error logic circuitry as illustrated in and discussed with respect to
The timing error sampling generator 240 is configured to provide the clock hold signal. The clock hold signal represents the amount of hold time needed to prevent a timing hold violation in the critical path being monitored. The timing error sampling generator 240 is a clocked circuit that employs the same clock as the DQ flip-flop 210. The clock may be a clock of the IC. The timing error sampling generator 240 includes a clock input that receives the clock signal and an output that provides the clock hold signal to the second input of the AND gate 230. The timing error sampling generator 240 may be the circuit illustrated in
The critical path monitor 300 further includes a timing error sampling generator 340. In addition to providing a clock hold signal as provided by the timing error sampling generator 240 of
Unlike the critical path monitor 200, the critical path monitor 300 also includes third logic circuitry 350 configured to respond to the comparison signal and the clock setup signal to provide an error setup signal. Like the AND gate 230, the AND gate 350 may also be referred to as a timing violation signal generator. The third logic circuitry 350 may be an AND gate. As such, the third logic circuitry 350 will be referred to herein as the AND gate 350.
The AND gate 350 is an unclocked logic element in the illustrated embodiment. The AND gate 350 is configured to produce an error setup signal based on the comparison signal from the output of the comparison circuitry 220 and the clock setup signal provided by the second output of the timing error sampling generator 350. The AND gate 350 includes a first input, a second input and an output. The first input is coupled to the output of the comparison circuitry 220 and receives the comparison signal therefrom. The second input is coupled to the timing error sampling generator 340 and receives the clock setup signal therefrom. The output of the AND gate 350 is configured to respond to the comparison signal and the clock setup signal and provide an error setup signal when both the comparison signal and the clock hold signal are at the same logic level (which is a high logic level in the illustrated embodiment). The error signal can be provided as an output during chip testing. The error signal can also be provided to a VMU via error logic circuitry as illustrated in and discussed with respect to
The timing error sampling generator 400 includes an inverter 410, a setup delay element 420, a hold delay element 430 and a setup logic element and a hold logic element represented by a setup AND gate 440 and a hold AND gate 450. The inverter 410 has an input and an output. The inverter 410 receives a clock signal at the input and provides an inverted clock signal at the output.
The setup delay element 420 is configured to provide a predetermined delay D1 that corresponds to a desired setup violation time for a particular path to be monitored. The setup delay element 420 has an input coupled to the output of the inverter 410 and an output coupled to a second input of the setup AND gate 440. The setup delay element 420 receives the inverted clock signal at its input and provides a setup violation delayed signal at its output.
The hold delay element 430 is configured to provide a predetermined delay D2 that corresponds to a desired hold violation time for a particular path to be monitored. The hold delay element 430 has an input coupled to the output of the inverter 410 and an output coupled to a second input of the hold AND gate 450. The hold delay element 430 receives the inverted clock signal at its input and provides a hold violation delayed signal at its output.
The setup AND gate 440 is configured to provide a clock setup signal that can be used to detect setup violations. The setup AND gate 440 includes a first input, a second input and an output. The first input of the setup AND gate 440 is coupled to the output of the inverter 410 and the second input is coupled to the output of the setup delay element 420. The output of the setup AND gate 440 responds to the inverted clock signal received at the first input and the setup violation delayed signal received at the second input to provide the clock setup signal. In the illustrated embodiment, the setup AND gate 440 will produce a clock setup signal at a high logic level when the inverted clock signal and the setup violation delayed signal are at a high logic level.
The hold AND gate 450 is configured to provide a clock hold signal that can be used to detect hold violations. The hold AND gate 450 includes a first input, a second input and an output. The first input of the hold AND gate 450 is coupled to the output of the inverter 410 and the second input is coupled to the output of the hold delay element 420. The output of the hold AND gate 450 responds to the inverted clock signal received at the first input and the hold violation delayed signal received at the second input to provide the clock hold signal. In the illustrated embodiment, the hold AND gate 450 will produce a clock hold signal at a high logic level when the inverted clock signal and the hold violation delayed signal are at a high logic level.
A plurality of paths is located on the substrate.
A corresponding plurality of associated CPMs is also located on the substrate. In particular, a CPM 530a is associated with the path a, a CPM 530b is associated with the path b, a CPM 530c is associated with the path c, and a CPM 530n is associated with the path n. Each CPM 530a, 530b, 530c, 530n provides a corresponding error signal ea, eb, ec, en. As discussed with respect to
Error logic circuitry 540 is located on the substrate and is coupled to each output of each of the plurality of the CPMs 530a, 530b, 530c, 530n. The error logic circuitry 540 is configured to indicate timing violations to a VMU 550 located on the substrate in response to the received error signals ea, eb, ec, en. The error logic circuitry 540 may provide an overall error signal E to the VMU 550 based on the received error signals ea, eb, ec, en. The error logic circuitry 540 may interact with the VMU 550 and include an unclocked (inclusive) OR gate and a DQ flip-flop as discussed in U.S. patent application Ser. No. 12/247,992, filed on Oct. 8, 2008, by Sreejit Chakravarty, entitled “CRITICAL PATH MONITOR FOR AN INTEGRATED CIRCUIT AND METHOD OF OPERATION THEREOF,” which is incorporated herein by reference in its entirety. In some embodiments, the overall error signal E may reflect the type of timing violation, setup or hold, based on the received error signals ea, eb, ec, en. As such, the error logic circuitry 540 may include two sets of an unclocked OR gate and a DQ flip-flop, one set to receive error hold signals and one set to receive error setup signals, to indicate to the VMU 550 the type of timing violation. The two sets may be in parallel to process the different timing violation indicators. Other logic configurations may be employed to indicate the type of timing errors to the VMU 550.
The VMU 550 is located on the substrate and is configured to receive the overall error signal E via the error logic circuitry 540 when an error is detected. The VMU 550 is configured to control one or more supply voltages associated with the one or more clock domains in the IC 500 based on the overall error signal E. The VMU 550 can also reset the overall error signal E by providing a reset signal to the error logic circuitry 540. The VMU 550 may increase or decrease the supply voltage based on if the overall error signal E indicates a hold violation or a setup violation. In addition to responding to setup and hold violations indicated by the error signals, the VMU 550 may also operate as the VMU described in Chakravarty which is incorporated herein. As such, the VMU 550 may be used for Adaptive Voltage Scaling (AVS) to monitor and control supply voltages of multiple clock domains in the IC 500. Therefore, the overall power consumption of the IC 500 is probably substantially less compared to if the supply voltages not to be so controlled.
Those skilled in the art to which this application relates will appreciate that other and further additions, deletions, substitutions and modifications may be made to the described embodiments.
Number | Name | Date | Kind |
---|---|---|---|
7138829 | Dalvi | Nov 2006 | B1 |
7944319 | Kerr et al. | May 2011 | B2 |
20070124634 | Shibuya | May 2007 | A1 |
20070164787 | Grochowski et al. | Jul 2007 | A1 |
Number | Date | Country | |
---|---|---|---|
20100153895 A1 | Jun 2010 | US |