Throughout this application, various publications are referenced in parentheses by first author and year. Full citations for these references may be found at the end of the specification immediately preceding the claims. The disclosures of these publications in their entireties are hereby incorporated by reference into this application to more fully describe the state of the art to which this invention pertains.
The PTEN tumor suppressor (see WO98/34624 which is hereby incorporated by reference in its entirety) is a cytoplasmic phosphatase which dephosphorylates the important second messenger phosphatidylinositol 3,4,5-triphosphate (Maehama and Dixon 1998). This activity downregulates the many oncogenic signals initiated by PIP3 activation of Akt including anti-apoptotic pathways, cell cycle progression and increasing cell metabolism (Sulis and Parsons 2003). The role of PTEN in cancer is evident from its frequent loss, either genetically or functionally, in many different tumor types (Bonneau and Longy 2000). Originally discovered as deleted in glial cancers, it has since been implicated in tumorigenesis of the prostate, breast, endometrium, melanocytes, kidneys and lungs. Germline mutations in PTEN were also linked to inherited cancer predisposition syndromes such as Cowden's Syndrome (Eng 2003). Mouse models of PTEN loss have recapitulated its role as an tumor suppressor both in the heterozygous mouse and tissue specific knockouts in many different tissue types (Di Cristofano, Pesce et al. 1998; Kwabi-Addo, Giri et al. 2001; Petrocelli and Slingerland 2001; You, Castrillon et al. 2002; Fraser, Zhu et al. 2004).
The PTEN protein contains an N-terminal dual specificity phosphatase domain, and a C-terminal C2 phospholipid binding domain, followed by an unstructured tail of regulatory importance because of the phosphorylation sites found within (Lee, Yang et al. 1999; Vazquez, Ramaswamy et al. 2000; Torres and Pulido 2001; Vazquez, Grossman et al. 2001). PTEN protein is mostly cytoplasmic however there is increasing evidence for a PTEN presence in the nucleus, a localization which is regulated by the monoubiquitination of the protein by NEDD4-1 (Baker 2007; Wang, Trotman et al. 2007).
Ribosome scanning of the 5′UTR precedes translation initiation which occurs at the start codon, AUG. Though the actual means by which the ribosome decides the proper start codon remains incompletely understood, there are certain properties of both the mRNA itself and the sequence which will dictate where the pre-initiation complex will slow its scanning and start to translate. The classic “Kozak sequence” CCACCATGG, where the underlined ATG is the initiation codon, has been shown to be the most favorable sequence context for initiation (Kozak 1991). mRNA secondary structure also promotes initiation probably by an actual slowing of the scanning of the pre-initiation complex which requires a helicase to melt secondary structures prior to reading (Kozak 1990).
In certain transcripts, translation initiation can occur from non-AUG codons. This usually comprises only a minor percentage of the total protein translated from a transcript and the result is a mixed species of proteins varying at their N-termini. Kozak delineated the efficiencies of translation initiation from non-AUG codons and found that GUG and CUG were both capable of initiating translation in vitro however far less efficiently (Kozak 1989). Further research has shown that the availability of methionine can alter the promiscuity of translation initiation through a mechanism that remains unclear, but probably involves the phosphorylation of eIF2, a component of the 43S pre-initiation complex, by a nutrient sensitive kinase (Hershey 1991; Hann 1994).
A number of proteins have been shown to be translated from alternate initiation codons. The transcription factor, c-myc, has an alternate upstream CUG initiation codon which when translated, adds 14 amino acids to the N-terminus of the protein (Hann and Eisenman 1984). This alternate isoform has been shown to be selectively disrupted in Burkitt's lymphoma (Hann, King et al. 1988). In tissue culture the longer form of myc is predominantly transcribed at high cell densities when methionine is at a low concentration (Hann, Sloan-Brown et al. 1992). Further studies have revealed that the longer form of c-myc is growth inhibitory and has a different set of transcriptional targets than the classic c-myc protein (Hann, Dixit et al. 1994). (Florkiewicz and Sommer 1989) (Prats, Kaghad et al. 1989).
Additionally, it is known that the actual subcellular localization of a protein can be dictated by alternate initiation codons. In the case of the mouse proto-oncogene int-2 alternate initiation from an upstream CUG codon encodes a nuclear localization while the AUG codon encodes a signal peptide for localization to the secretory pathway (Acland, Dixon et al. 1990). A similar phenomenon was described in the human FGF3, in which the protein translated from AUG is destined for the secretory pathway while the protein translated from an upstream CUG is localized to the nucleus (Kiefer, Acland et al. 1994). Furthermore, in some eukaryotic proteins, such as TEF-1 and PRPS-3, the protein is completely initiated from a CUG codon (Taira, Iizasa et al. 1990; Xiao, Davidson et al. 1991).
Proteins that are destined for secretion are targeted to the endoplasmic reticulum by a stretch of hydrophobic amino acids called a signal peptide (Blobel, Walter et al. 1979). Usually found at the N-termini of proteins, the signal peptide binds the signal recognition particle (SRP) upon translation and causes the ribosome to halt and translocate to the rough endoplasmic reticulum where it binds the SRP receptor. Once the ribosome docks, the SRP-SRP receptor complex is released and translation resumes through the lumen of the ER through the Sec61 translocon. The signal peptide is then cleaved off in the case of soluble proteins releasing the protein from the Sec translocon. In the case of proteins spanning a membrane, the transmembrane helix serves as a signal peptide for ER translocation. These proteins are modified extensively by glycosylation in the golgi and are shuttled to the plasma membrane in secretory vesicles (Alberts 2002).
There are a number of secreted proteins that have been shown to be important in cancer. The Wnt signaling pathway for example has been shown to be altered in lung cancer. Wnt is a secreted ligand for the family of Frizzled receptors. Wnt activation of frizzled causes disheveled to dissociate the □-catenin degradation complex, which includes APC, allowing for levels of □-catenin to rise and translocate to the nucleus where it can interact and transactivate the TCF transcription factor. Inactivating mutations in APC and activating mutations in □-catenin have been detailed in both inherited and sporadic colon cancer. Additionally, a number of extracellular ligand antagonists such as SFRP and Wnt-5a compete for the same Frizzled receptors as Wnt. Both have been shown to be tumor suppressors; the SFRP knockout mouse develops lymphoid tumors and epigenetic silencing of Wnt-5a has been detected in melanomas.
As disclosed herein, the leader sequence of a novel differentially translated protein, named PTEN-long, is able to act as a cell penetrating peptide akin to HIV TAT.
A composition comprising (i) a peptide comprising consecutive amino acid residues 22-173 of the sequence set forth in SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, for the transport of a cargo molecule across a biological membrane and (ii) the cargo molecule, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4.
A method for delivering a cargo molecule into a cell, comprising contacting the cell with a composition comprising (i) a peptide comprising consecutive amino acid residues 22-173 of the sequence set forth in SEQ ID NO: 1, or a portion of the amino acid residues set forth in SEQ ID NO:1, for the transport of the cargo molecule across a biological membrane and (ii) the cargo molecule, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO 4, under conditions permitting the entry of the cargo molecule into the cell.
A method for treating a tumor in a subject comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4 in an amount effective to treat the tumor in the subject.
A method for treating cancer in a subject comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a to a cargo molecule, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4 in an amount effective to treat the cancer in the subject.
A method for treating a metabolic disorder in a subject, wherein the metabolic disorder is characterized by a deficiency in a metabolic enzyme comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to the metabolic enzyme in an amount effective to treat the metabolic disorder in the subject.
A method for treating diabetes in a subject comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule in an amount effective to treat the diabetes in the subject.
A method for treating a cardiovascular disease in a subject comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule in an amount effective to treat the cardiovascular disease in the subject.
A composition comprising (i) a peptide comprising consecutive amino acid residues 22-173 of the sequence set forth in SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, for the transport of a cargo molecule across a biological membrane and (ii) the cargo molecule, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4.
In an embodiment the peptide is covalently attached to the cargo molecule. In an embodiment the peptide is covalently attached to the cargo molecule via a disulfide bond. In an embodiment the peptide is non-covalently attached to the cargo molecule.
In an embodiment the cargo molecule is a peptide, a polypeptide, a protein, a nanoparticle, a liposome, a phage, a viral vector, plasmid DNA, a nucleic acid, a peptide nucleic acid, or a morpholino compound. In an embodiment the cargo molecule is a peptide, polypeptide or protein and wherein the peptide for the transport of the cargo molecule is covalently attached to the cargo molecule via a peptide bond. In an embodiment the cargo molecule is a nucleic acid and is a DNA. In an embodiment the cargo molecule is a nucleic acid and is a RNA. In an embodiment the cargo molecule is a nucleic acid and is a siRNA or an antisense oligonucleotide. In an embodiment the cargo molecule is a nucleic acid and encodes a human p53 protein. In an embodiment the cargo molecule is a nucleic acid and encodes a tumor suppressor protein. In an embodiment the tumor suppressor protein is p16. In an embodiment the tumor suppressor protein is ARF. In an embodiment the tumor suppressor protein is VHL. In an embodiment the tumor suppressor protein is SMAD4. In an embodiment the tumor suppressor protein is ARID1A. In an embodiment the tumor suppressor protein is BAF180. In an embodiment the tumor suppressor protein is BRCA1. In an embodiment the tumor suppressor protein is BRCA2. In an embodiment the tumor suppressor protein is RB. In an embodiment the tumor suppressor protein is LKB1. In an embodiment the cargo molecule is a protein and is a human p53 protein. In an embodiment the cargo molecule is a protein and is a tumor suppressor protein. In an embodiment the tumor suppressor protein is p16. In an embodiment the tumor suppressor protein is ARF. In an embodiment the tumor suppressor protein is VHL. In an embodiment the tumor suppressor protein is SMAD4. In an embodiment the tumor suppressor protein is ARID1A. In an embodiment the tumor suppressor protein is BAF180. In an embodiment the tumor suppressor protein is BRCA1. In an embodiment the tumor suppressor protein is BRCA2. In an embodiment the tumor suppressor protein is RB. In an embodiment the tumor suppressor protein is LKB1. In an embodiment the cargo molecule is a protein and is an enzyme. In an embodiment the enzyme is a metabolic enzyme. In an embodiment the cargo molecule is a polypeptide or a protein and is an antigen. In an embodiment the cargo molecule is a botulinum toxin or a fragment thereof. In an embodiment the cargo molecule is BCL2 or thioredoxin.
In an embodiment the cargo molecule is a diagnostic agent. In an embodiment the diagnostic agent is a radio-opaque contrast agent, a paramagnetic contrast agent, a superparamagnetic contrast agent, a fluorophore, or a computer tomography contrast agent.
In an embodiment the cargo molecule is a therapeutic agent. In an embodiment the therapeutic agent is a biologically active small molecule. In an embodiment the therapeutic agent is a cytotoxic molecule or a chemotherapeutic agent or a radiotheraputic agent.
In an embodiment the cargo molecule is attached to the peptide for transport via a polymeric linker. In an embodiment the polymeric linker is polyethylene glycol.
In an embodiment the cargo molecule is a nucleic acid. In an embodiment the cargo molecule is a protein and has a molecular weight of up to 160 kDa.
In an embodiment the peptide comprising consecutive amino acid residues having the sequence set forth in SEQ ID NO 1 for the transport of a cargo molecule across a biological membrane is derivatized. In an embodiment the peptide comprises consecutive amino acid residues having the sequence set forth in SEQ ID NO 1.
In an embodiment the composition comprises consecutive amino acid residues having the sequence set forth in SEQ ID NO:8.
A method for delivering a cargo molecule into a cell, comprising contacting the cell with a composition comprising (i) a peptide comprising consecutive amino acid residues 22-173 of the sequence set forth in SEQ ID NO:1, or a portion of the amino acid residues set forth in SEQ ID NO:1, for the transport of the cargo molecule across a biological membrane and (ii) the cargo molecule, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO 4, under conditions permitting the entry of the cargo molecule into the cell.
In an embodiment the peptide is covalently attached to the cargo molecule. In an embodiment the peptide is covalently attached to the cargo molecule via a peptide bond. In an embodiment the peptide is covalently attached to the cargo molecule via a disulfide bond. In an embodiment the peptide is non-covalently attached to the cargo molecule.
In an embodiment the cargo molecule is a peptide, a polypeptide, a protein, a nanoparticle, a liposome, a phage, a viral vector, plasmid DNA, a nucleic acid, a peptide nucleic acid, or a morpholino compound. In an embodiment the cargo molecule is a peptide, polypeptide or protein and wherein the peptide for the transport of the cargo molecule is covalently attached to the cargo molecule via a peptide bond. In an embodiment the cargo molecule is a nucleic acid and is a DNA. In an embodiment the cargo molecule is a nucleic acid and is a RNA. In an embodiment the cargo molecule is a nucleic acid and is a siRNA or an antisense oligonucleotide. In an embodiment the cargo molecule is a nucleic acid and encodes a human p53 protein. In an embodiment the cargo molecule is a nucleic acid and encodes a tumor suppressor protein. In an embodiment the tumor suppressor protein is p16. In an embodiment the tumor suppressor protein is ARF. In an embodiment the tumor suppressor protein is VHL. In an embodiment the tumor suppressor protein is SMAD4. In an embodiment the tumor suppressor protein is ARID1A. In an embodiment the tumor suppressor protein is BAF180. In an embodiment the tumor suppressor protein is BRCA1. In an embodiment the tumor suppressor protein is BRCA2. In an embodiment the tumor suppressor protein is RB. In an embodiment the tumor suppressor protein is LKB1. In an embodiment the cargo molecule is a protein and is a human p53 protein. In an embodiment the cargo molecule is a protein and is an enzyme. In an embodiment the enzyme is a metabolic enzyme. In an embodiment the cargo molecule is a protein and is a tumor suppressor protein. In an embodiment the tumor suppressor protein is p16. In an embodiment the tumor suppressor protein is ARF. In an embodiment the tumor suppressor protein is VHL. In an embodiment the tumor suppressor protein is SMAD4. In an embodiment the tumor suppressor protein is ARID1A. In an embodiment the tumor suppressor protein is BAF180. In an embodiment the tumor suppressor protein is BRCA1. In an embodiment the tumor suppressor protein is BRCA2. In an embodiment the tumor suppressor protein is RB. In an embodiment the tumor suppressor protein is LKB1. In an embodiment the cargo molecule is a polypeptide or a protein and is an antigen. In an embodiment the cargo molecule is a botulinum toxin or a fragment thereof. In an embodiment the cargo molecule is BCL2. In an embodiment the cargo molecule is thioredoxin.
In an embodiment the cargo molecule is a diagnostic agent. In an embodiment the diagnostic agent is a radio-opaque contrast agent, a paramagnetic contrast agent, a superparamagnetic contrast agent, a fluorophore, or a computer tomography contrast agent.
In an embodiment the cargo molecule is a therapeutic agent. In an embodiment the therapeutic agent is a biologically active small molecule. In an embodiment the therapeutic agent is a cytotoxic molecule or a chemotherapeutic agent or a radiotheraputic agent.
In an embodiment the peptide comprises consecutive amino acid residues having the sequence set forth in SEQ ID NO 1. In an embodiment the cell is a tumor cell. In an embodiment the cell is in a human subject.
In an embodiment the composition comprises consecutive amino acid residues having the sequence set forth in SEQ ID NO:8.
A method for treating a tumor in a subject comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4 in an amount effective to treat the tumor in the subject.
A composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule, for treating a tumor in a subject, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4 in an amount effective to treat the tumor in the subject.
In an embodiment the cargo molecule is a tumor suppressor protein. In an embodiment the tumor suppressor protein is p53. In an embodiment the tumor suppressor protein is p16. In an embodiment the tumor suppressor protein is ARF. In an embodiment the tumor suppressor protein is VHL. In an embodiment the tumor suppressor protein is SMAD4. In an embodiment the tumor suppressor protein is ARID1A. In an embodiment the tumor suppressor protein is BAF180. In an embodiment the tumor suppressor protein is BRCA1. In an embodiment the tumor suppressor protein is BRCA2. In an embodiment the tumor suppressor protein is RB. In an embodiment the tumor suppressor protein is LKB1.
In an embodiment the tumor suppressor protein is p53 and the composition comprises consecutive amino acids, the sequence of which is set forth in SEQ ID NO:8.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule via a peptide bond. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule via a disulfide bond.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is non-covalently attached to the cargo molecule.
A method for treating cancer in a subject comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a to a cargo molecule, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4 in an amount effective to treat the cancer in the subject.
A composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule, for treating cancer in a subject, wherein the cargo molecule is not a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4 in an amount effective to treat the tumor in the subject.
In an embodiment the cargo molecule is a tumor suppressor protein. In an embodiment the tumor suppressor protein is p53. In an embodiment the tumor suppressor protein is p16. In an embodiment the tumor suppressor protein is ARF. In an embodiment the tumor suppressor protein is VHL. In an embodiment the tumor suppressor protein is SMAD4. In an embodiment the tumor suppressor protein is ARID1A. In an embodiment the tumor suppressor protein is BAF180. In an embodiment the tumor suppressor protein is BRCA1. In an embodiment the tumor suppressor protein is BRCA2. In an embodiment the tumor suppressor protein is RB. In an embodiment the tumor suppressor protein is LKB1.
In an embodiment the tumor suppressor protein is p53 and the composition comprises consecutive amino acids, the sequence of which is set forth in SEQ ID NO:8.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule via a peptide bond. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule via a disulfide bond.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is non-covalently attached to the cargo molecule.
A method for treating a metabolic disorder in a subject, wherein the metabolic disorder is characterized by a deficiency in a metabolic enzyme comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to the metabolic enzyme in an amount effective to treat the metabolic disorder in the subject.
A composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a metabolic enzyme for treating a metabolic disorder in a subject, wherein the metabolic disorder is characterized by a deficiency in the metabolic enzyme.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the metabolic enzyme. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO: 1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the metabolic enzyme via a peptide bond. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the metabolic enzyme via a disulfide bond.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is non-covalently attached to the metabolic enzyme.
A method for treating diabetes in a subject comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO: 1, conjugated to a cargo molecule in an amount effective to treat the diabetes in the subject.
A composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule for treating diabetes in a subject.
In one embodiment the cargo molecule is a peptide, a polypeptide, a protein, a nanoparticle, a liposome, a phage, a viral vector, plasmid DNA, a nucleic acid, a peptide nucleic acid, or a morpholino compound.
In one embodiment the cargo molecule is a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4. In an embodiment the composition comprises consecutive amino acids, the sequence of which is set forth in SEQ ID NO:6.
In an embodiment the cargo molecule is a protein and the protein is a tumor suppressor protein. In an embodiment the tumor suppressor protein is p53. In an embodiment the tumor suppressor protein is p16. In an embodiment the tumor suppressor protein is ARF. In an embodiment the tumor suppressor protein is VHL. In an embodiment the tumor suppressor protein is SMAD4. In an embodiment the tumor suppressor protein is ARID1A. In an embodiment the tumor suppressor protein is BAF180. In an embodiment the tumor suppressor protein is BRCA1. In an embodiment the tumor suppressor protein is BRCA2. In an embodiment the tumor suppressor protein is RB. In an embodiment the tumor suppressor protein is LKB1. In an embodiment the tumor suppressor protein is p53 and the composition comprises consecutive amino acids, the sequence of which is set forth in SEQ ID NO:8.
In an embodiment the cargo molecule is BCL2. In an embodiment the cargo molecule is thioredoxin.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule via a peptide bond. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO: 1, is covalently attached to the cargo molecule via a disulfide bond.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, is non-covalently attached to the cargo molecule.
A method for treating a cardiovascular disease in a subject comprising administering to the subject an amount of a composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule in an amount effective to treat the cardiovascular disease in the subject.
A composition comprising a peptide comprising amino acid residues 22-173 of SEQ ID NO: 1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, conjugated to a cargo molecule for treating a cardiovascular disease in subject.
In an embodiment the cargo molecule is a peptide, a polypeptide, a protein, a nanoparticle, a liposome, a phage, a viral vector, plasmid DNA, a nucleic acid, a peptide nucleic acid, or a morpholino compound.
In an embodiment the cargo molecule is a peptide comprising amino acid residues having the sequence set forth in SEQ ID NO:4. In an embodiment the composition comprises consecutive amino acids, the sequence of which is set forth in SEQ ID NO:6.
In an embodiment the cargo molecule is a protein and the protein is a tumor suppressor protein. In an embodiment the tumor suppressor protein is p53. In an embodiment the tumor suppressor protein is p16. In an embodiment the tumor suppressor protein is ARF. In an embodiment the tumor suppressor protein is VHL. In an embodiment the tumor suppressor protein is SMAD4. In an embodiment the tumor suppressor protein is ARID1A. In an embodiment the tumor suppressor protein is BAF180. In an embodiment the tumor suppressor protein is BRCA1. In an embodiment the tumor suppressor protein is BRCA2.
In an embodiment the tumor suppressor protein is RB. In an embodiment the tumor suppressor protein is LKB1. In an embodiment the tumor suppressor protein is p53 and the composition comprises consecutive amino acids, the sequence of which is set forth in SEQ ID NO:8.
In an embodiment the cargo molecule is BCL2. In an embodiment the cargo molecule is thioredoxin.
In an embodiment the cardiovascular disease is selected from the group consisting of arteriosclerosis, atherosclerosis, cardiomyopathies, coronary artery disease, peripheral vascular diseases, congestive heart failure, myocardial infarction, and ischemia/re-perfusion injury. In an embodiment the cardiovascular disease is atherosclerosis.
In an embodiment the cardiovascular disease is myocardial infarction. In an embodiment the cardiovascular disease is myocardial infarction and the composition is administered during the myocardial infarction. In an embodiment the composition is administered in an amount effective to prevent cell death.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, is covalently attached to the cargo molecule. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acids 22-173 of SEQ ID NO: 1, is covalently attached to the cargo molecule via a peptide bond. In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or portion of amino acid residues 22-173 of SEQ ID NO: 1, is covalently attached to the cargo molecule via a disulfide bond.
In an embodiment the peptide comprising amino acid residues 22-173 of SEQ ID NO:1, or a portion of amino acid residues 22-173 of SEQ ID NO:1, is non-covalently attached to the cargo molecule.
A peptide “for the transport of a cargo molecule”, as used herein, is a peptide which acts as a cell penetrating peptide, i.e. a peptide which mediates transport of a molecule attached thereto (the “cargo molecule”) across a biological membrane.
A “cargo molecule” as used herein is a molecule of interest to be transported across a biological membrane, e.g. from the extracellular space to an intracellular space, which is attached covalently or non-covalently to one of the transporting peptides described herein. In the embodiment of the cargo molecule being a peptide, polypeptide or protein, the transporting peptide can be covalently attached through a peptide bond to the cargo molecule so as to form a fusion protein. The PTEN polypeptide as set forth in SEQ ID NO:4 is specifically excluded from the definition of cargo molecule.
As used herein “siRNA” is a double-stranded (ds) RNA, usually about 19-25 nucleotides long, often with 3′ overhangs (2 nucleotides) at each end. One method of covalently attaching the siRNA to the peptide for transport of a cargo molecule is via a disulfide bond at the 5′ end of an siRNA sense strand.
As used herein, “cardiovascular disease” means a pathological state affecting the normal physiological functioning of a mammalian heart and/or the cardiac blood supply and/or other vascular components including arteriosclerosis, atherosclerosis, cardiomyopathies, coronary artery disease, peripheral vascular diseases, congestive heart failure, myocardial infarction, and ischemia/re-perfusion injury.
A “chemotherapeutic agent”, as used herein, is an alkylating agent, anti-metabolite, anthracycline, plant alkaloid, topoisomerase inhibitor, or tyrosine kinase inhibitor used in the art to treat cancer.
A “radiotherapeutic agent”, as used herein, is a radioisotope used in the art to treat cancer.
A “small molecule”, as used herein, is a low molecular weight organic compound which is not a polymer and which has a molecular weight of less than 1 kDa and more usually less than 800 Da.
In embodiments, the tumor is a cancerous cell. In further embodiments, the cancerous tumor is a tumor of the subject's glial cells, prostate, ovaries, uterus, endometrium, breast, melanocyte, kidney, lung, colon, head, neck, or pancreas.
In an embodiment, the cargo molecule is a tumor suppressor protein. A “tumor suppressor protein” as used herein is a protein, encoded by a tumor-suppressor gene, which has a dampening or repressive effect on the regulation of the cell cycle or promote apoptosis, or sometimes both. Non limiting examples of tumor suppressor proteins include p53. p16, ARF, VHL, SMAD4, ARID1A, BAF180, BRCA1, BRCA2, RB and LKB1.
In an embodiment the cargo molecule is a p53 protein or a p53 encoding nucleic acid (TP53 tumor protein p53, Homo sapiens—Entrez Gene GeneID: 7157) or an active fragment thereof, or single nucleotide polymorphism thereof or fragment thereof.
The peptide sequences described herein for transport of cargo molecules are, generically, cell penetrating peptides, although cell penetrating peptides are typically 30 amino acids or less. Delivery of RNA (including siRNA) into cells using a cell penetrating peptide is described in Mathupala et al., Expert Opin Ther Pat. 2009 February; 19(2): 137-140, which is hereby incorporated by reference in its entirety. Delivery of vaccines using a cell penetrating peptide is described in Brook et al., Biochim Biophys Acta. 2010 January; 1805(1):25-34, which is hereby incorporated by reference in its entirety. Delivery of delivery of nanoparticles, liposomes, and other nanocarriers is described in Juliano et al. Wiley Interdiscip Rev Nanomed Nanobiotechnol. 2009 May; 1(3):324-35, which is hereby incorporated by reference in its entirety. Delivery of chemotherapeutic agents and anti-cancer agents using a cell penetrating peptide is described in Bitler et al., Recent Pat Anticancer Drug Discov. 2009 Dec. 2., Epub, which is hereby incorporated by reference in its entirety.
“Treating” a disorder/disease shall mean slowing, stopping or reversing the disorder's progression, and/or ameliorating, lessening, or removing symptoms of the disorder. Thus treating a disorder encompasses reversing the disorder's progression, including up to the point of eliminating the disorder itself.
In an embodiment of the methods described herein the method is used to deliver a prophylactically effective amount of the cargo molecule to a subject. As used herein, a “prophylactically effective” amount of a substance is an amount effective to prevent or to delay the onset of a given pathological condition in a subject to which the substance is administered. In an embodiment of the methods described herein the method is used to deliver a therapeutically effective amount of the cargo molecule to a subject. As used herein, a “therapeutically effective” amount of a substance is an amount effective to treat, ameliorate or lessen a symptom or cause of a given pathological condition in a subject suffering therefrom to which subject the substance is administered.
In one embodiment, the therapeutically or prophylactically effective amount is from about 1 mg of agent/subject to about 1 g of agent/subject per dosing. In another embodiment, the therapeutically or prophylactically effective amount is from about 10 mg of agent/subject to 500 mg of agent/subject. In a further embodiment, the therapeutically or prophylactically effective amount is from about 50 mg of agent/subject to 200 mg of agent/subject. In a further embodiment, the therapeutically or prophylactically effective amount is about 100 mg of agent/subject. In still a further embodiment, the therapeutically or prophylactically effective amount is selected from 50 mg of agent/subject, 100 mg of agent/subject, 150 mg of agent/subject, 200 mg of agent/subject, 250 mg of agent/subject, 300 mg of agent/subject, 400 mg of agent/subject and 500 mg of agent/subject.
In an embodiment of the methods described herein the composition comprising the peptide and cargo molecule is administered to a subject using any of the various methods and delivery systems known to those skilled in the art. The administering can be, for example, intravenous, oral, nasal, intraperitoneal, via the cerebrospinal fluid, via implant, transmucosal, transdermal, intramuscular, intravascular, intra-arterial, intracoronary, intramyocardial or subcutaneous.
In an embodiment of the methods described herein the composition is administered to the subject by direct introduction into the tumor. In an embodiment of the methods described herein the composition is injected into solid tumor. In an embodiment of the methods described herein the composition is directly introduced into the tumor by a catheter. In an embodiment of the methods described herein the composition is administered to the subject by direct introduction into a blood vessel supplying the tumor. In an embodiment of the methods described herein the composition is injected into the blood vessel supplying the tumor. In an embodiment of the methods described herein the composition is directly introduced by a catheter into the blood vessel supplying the tumor. In an embodiment of the methods described herein the composition is administered to the subject intravenously. In an embodiment of the methods described herein the composition is administered to the subject subcutaneously.
The term PTEN refers to the polypeptide defined by SEQ ID NO:4.
PTEN-long has otherwise sometimes been referred to as PTEN-beta, PTEN-β, PTEN-S.
Injectable drug delivery systems for the compositions described herein, include solutions, suspensions, gels, microspheres and polymeric injectables, and can comprise excipients such as solubility-altering agents (e.g., ethanol, propylene glycol and sucrose) and polymers (e.g., polycaprylactones and PLGA's). Implantable systems include rods and discs, and can contain excipients such as the non limiting examples PLGA and polycaprylactone.
Oral delivery systems for the compositions of the invention include tablets and capsules. These can contain excipients such as binders (e.g., hydroxypropylmethylcellulose, polyvinyl pyrilodone, other cellulosic materials and starch), diluents (e.g., lactose and other sugars, starch, dicalcium phosphate and cellulosic materials), disintegrating agents (e.g., starch polymers and cellulosic materials) and lubricating agents (e.g., stearates and talc).
Transmucosal delivery systems for the compositions of the invention include patches, tablets, suppositories, pessaries, gels and creams, and can contain excipients such as solubilizers and enhancers (e.g., propylene glycol, bile salts and amino acids), and other vehicles (e.g., polyethylene glycol, fatty acid esters and derivatives, and hydrophilic polymers such as hydroxypropylmethylcellulose and hyaluronic acid).
Dermal delivery systems for the compositions of the invention include, for example, aqueous and nonaqueous gels, creams, multiple emulsions, microemulsions, liposomes, ointments, aqueous and nonaqueous solutions, lotions, aerosols, hydrocarbon bases and powders, and can contain excipients such as solubilizers, permeation enhancers (e.g., fatty acids, fatty acid esters, fatty alcohols and amino acids), and hydrophilic polymers (e.g., polycarbophil and polyvinylpyrolidone). In one embodiment, the pharmaceutically acceptable carrier is a liposome or a transdermal enhancer.
Solutions, suspensions and powders for reconstitutable delivery systems for the compositions of the invention include vehicles such as suspending agents (e.g., gums, zanthans, cellulosics and sugars), humectants (e.g., sorbitol), solubilizers (e.g., ethanol, water, PEG and propylene glycol), surfactants (e.g., sodium lauryl sulfate, Spans, Tweens, and cetyl pyridine), preservatives and antioxidants (e.g., parabens, vitamins E and C, and ascorbic acid), anti-caking agents, coating agents, and chelating agents (e.g., EDTA).
As used herein, “5′ATR” is the 5′ alternately translated region as described in the Experimental section herein below.
In an embodiment, the compositions described herein further comprise a pharmaceutical carrier. As used herein, a “pharmaceutical carrier” is a pharmaceutically acceptable solvent, suspending agent or vehicle, for delivering the instant compositions to the animal or human. The carrier may be liquid, aerosol, gel or solid and is selected with the planned manner of administration in mind.
In an embodiment of the methods described herein the cell is a tumor cell which is a solid tumor cell. “Solid Tumor” as used herein includes cancerous and non-cancerous solid tumors. Cancerous solid tumors include, without limitation, biliary tract cancer; brain cancer, including glioblastomas and medulloblastomas; breast cancer; cervical cancer; choriocarcinoma; colon cancer; endometrial cancer; esophageal cancer; gastric cancer; intraepithelial neoplasms, including Bowen's disease and Paget's disease; liver cancer; lung cancer; lymphomas, including Hodgkin's disease and lymphocytic lymphomas; neuroblastomas; oral cancer, including squamous cell carcinoma; ovarian cancer, including those arising from epithelial cells, stromal cells, germ cells and mesenchymal cells; pancreas cancer; prostate cancer; colorectal cancer; sarcomas, including leiomyosarcoma, rhabdomyosarcoma, liposarcoma, fibrosarcoma and osteosarcoma; skin cancer, including melanoma, Kaposi's sarcoma, basocellular cancer and squamous cell cancer; testicular cancer, including germinal tumors (seminoma, non-seminoma [teratomas, choriocarcinomas]), stromal tumors and germ cell tumors; thyroid cancer, including thyroid adenocarcinoma and medullar carcinoma; and renal cancer including adenocarcinoma and Wilms tumor, but excludes tumors of non-solid tissues such as leukemias and other hematological neoplasms, including acute lymphocytic and myelogenous leukemia; multiple myeloma; AIDS associated leukemias and adult T-cell leukemia lymphoma.
SEQ ID NO:1 of the sequence listing is the leader sequence and signal sequence (residues 1-21) of PTEN-long protein.
SEQ ID NO:2 of the sequence listing is an analogue of the leader sequence and signal sequence (residues 1-21) of PTEN-long protein. In any of the embodiments of the methods and compositions described herein, SEQ ID NO:2 can be used in place of SEQ ID NO:1 where SEQ ID NO:1 is recited.
SEQ ID NO:3 is an epitope on PTEN-long.
SEQ ID NO:4 is the polypeptide of PTEN (i.e. not PTEN-long).
SEQ ID NO:6 is the MSES PTEN-long.
SEQ ID NO:8 is a PTEN-long-p53 fusion protein. In any of the embodiments of the methods and compositions described herein, amino acids 1-153 of SEQ ID NO:8 can be used in place of SEQ ID NO:1 where SEQ ID NO:1 is recited.
In an embodiment of any of the above described methods, the peptide comprising amino acids 22-173 of SEQ ID NO:1, or a portion of SEQ ID NO:1, is a peptide comprising a portion of amino acids 22-173 of SEQ ID NO:1 which retains the ability to transport a cargo molecule across a biological membrane.
Where a range is given in the specification it is understood that the range includes all integers and 0.1 units within that range, and any sub-range thereof. For example, a range of 77 to 90% includes 77.0%, 77.1%, 77.2%, 77.3%, 77.4%, 77.5%, 77.6%, 77.7%, 77.8%, 77.9%, 80.0%, 80.1%, 80.2%, 80.3%, 80.4%, 80.5%, 80.6%, 80.7%, 80.8%, 80.9%, and 90.0%, as well as the range 80% to 81.5% etc.
All combinations of the various elements described herein are within the scope of the invention.
This invention will be better understood by reference to the Experimental Details which follow, but those skilled in the art will readily appreciate that the specific experiments detailed are only illustrative of the invention as described more fully in the claims which follow thereafter.
First Series of Experiments The PTEN tumor suppressor is one of the most commonly altered genes in cancer. It functions as a lipid phosphatase of phosphatidylinositol 3,4,5-triphosphate which in turn suppresses oncogenic signaling from phosphatidylinositol 3-kinase (PI3K) and Akt. Inspection of PTEN mRNA revealed that the 5′ untranslated region (UTR) is in frame with the open reading frame (ORF) of PTEN for 770 bp. Within this UTR ORF, there is an alternate CUG start codon within a weak Kozak sequence at 513 base pairs upstream of the canonical AUG start codon. While expression of the canonical PTEN ORF generates a protein which migrates at approximately 55 kDa, expression of PTEN cDNA containing the 5′UTR is able to generate a second protein at 70 kDa called PTEN-long. Mutation of the start sites indicated that the 55 kDa PTEN is generated from translation at the canonical start codon while PTEN-long is initiated from the upstream alternate start site. Immunoblotting with different PTEN antibodies demonstrated the endogenous presence of PTEN-long in multiple cells lines. Knockdown and knockout studies in mouse ES cells confirmed that this larger protein was indeed PTEN. The added N-terminal protein sequence encoded a signal peptide and cleavage site, indicating that PTEN-long enters the secretory pathway. PTEN-long preferentially binds the lectin concanavalin A, demonstrating that it is glycosylated. Furthermore, PTEN-long can be purified from conditioned media by affinity purification using both an antibody to PTEN as well as heparan sulfate. PTEN-long is also sensitive to degradation in an in vivo protease protection assay while normal PTEN is not, indicating that PTEN-long is located on the outside of the cell membrane.
Reagents, Cell Lines and Antibodies
Proteinase K and concanavalin-A were purchased from Sigma (St. Louis, Mo.). Heparin sepharose and HiTrap Heparin HP columns were purchased from Amersham (Piscataway, N.J.). Antibodies to PTEN were purchased from Cell Signaling (Danvers Mass.) and Cascade (Winchester Mass.). Akt antibody was obtained from Cell Signaling (Danvers Mass.) and E cadhein antibody from Upstate Millipore (Billerica, Ma). A polyclonal affinity purified antibody raised against the epitope PRHQQLLPSLSSFFFSHRLPD (SEQ ID NO:3), found in the novel translation of PTEN, was performed by Zymed Laboratories (South San Francisco, Calif.). Secondary antibodies were purchased from Pierce (Rockford, Ill.). HEK293, ZR-75-1, SKBR-3, MDAMB-361, BT549, and PC3 were obtained from ATCC (Manassas, Va.) and grown according to supplied guidelines.
Plasmids and Contructs
pCEP4-PTEN, encoding the full open reading frame of PTEN and 5′-untranslated region was generated as previously reported by cloning PTEN cDNA (deposited in NCBI as U90351) into the NotI site of pCEP4 (Invitrogen) (Li, Simpson et al. 1998). The 5′UTR was further extended on this plasmid by ligating an adaptor encoding sequence upstream of the original NotI restriction site used for cloning. The adaptor encoded up to 10 base pairs upstream of the first possible alternate CTG start codon located at −513 of the canonical start site. An adaptor in which the putative alternate start site was mutated to ATG was also used to create a second set of expression constructs in which the long form would be efficiently expressed. Furthermore mutagenesis of the canonical start codon to ATA was also performed, yielding in total 4 different constructs (
Protease Protection Assay
HEK293 cells were collected in ice-cold PBS without trypsin and 5×105 cell aliquots were incubated for 30 minutes with increasing concentrations of Proteinase K, from 0.5 ug/ml to 10 ug/ml. A control with Triton 0.1% was included to verify the ability of Proteinase K to degrade the indicated proteins. The reaction was stopped with 5 mM PMSF. Cells were lysed in 2× Laemmli sample buffer (125 nM Tris pH 6.8, 20% glycerol, 0.05% bromophenol blue, 4% SDS, 10% 2-mercaptoethanol) and immunoblotted for PTEN, Akt and E cadherin.
PTEN Purification from Mouse Livers
Livers from C57BL6 mice were snap frozen in liquid nitrogen, pulverized, and resuspended in TNN buffer (50 mM Tris pH 7.4, 150 mM NaCl, 0.5% NP-40, 5 mM EDTA, 3% glycerol, 1 mM DTT, 1× Mammalian Protease Cocktail Inhibitors [Sigma]). The suspension was homogenized with a mortar and centrifuged at 40,000 RPM at 4 degrees for 1 hour. Supernatant was filtered successively with 0.45 micron and 0.22 micron filters. A sephacryl 200 size exclusion column (Amersham) was pre-equilibrated with TNN and the sample was applied at a rate of 0.3 ml/hr, followed by buffer. 2 ml fractions were collected and the low molecular weight samples were pooled and applied to a pre-equilibrated HiTrap Hepain HP column (Amersham). The column was washed with three column volumes of TNN and protein was eluted with stepwise 3× column volumes of 0.3M, 0.5M and 1M NaCl TNN solutions. Fractions were collected in 0.5 ml increments and immunoblotted for PTEN.
PTEN Heparin Purification from Media
HEK293 cells were grown to confluency in 10% FBS DMEM in 15 cm dishes. The cells were incubated overnight with 15 ml of DMEM without EBS. The media from 20 plates was collected and filtered through a 0.45 micron filter. A 1 ml Heparin HP column was equilibrated with DMEM using AktaPrime (AmershamBioscience) using a flow of 4 ml/min at 4° C. Conditioned media was then passed through the column at 1 ml/min. The column was washed with 10 volumes of BC200 (200 mM Nacl, 50 mMT Tris pH7.4, 1 mM EDTA, 0.2% Triton X-100). Proteins were eluted with 5 ml of 1M NaCl at 1 ml/min in 1 ml fractions. The protein concentration of each fraction was determines by OD at 280 nm. Half of each fraction was precipitated with 20% with trichloroacetic acid, washed with cold acetone dried under vacuum. Protein was reconstituted in 20 ul Laemmli lysis buffer and immunoblotted using an antibody to PTEN and PTEN-long.
PTEN Purification from Serum
Human serum from AB plasma was obtained from Sigma. 1 ml of serum was filtered through a 0.45 micron filter and precleared of antibodies using Protein A/G agarose for 1 hour incubation. Heparin-agarose was incubated with the precleared serum overnight along with a sepharose control and washed the next day with BC150 (150 mM NaCl, 25 mM Tris pH7.4, 1% NP-40, 0.25% Na Deoxycholate, 1 mM EDTA). Proteins were eluted with laemmli sample buffer and immunoblotted for PTEN or secondary only for heavy chain contamination.
Concanavalin A Pulldown
HEK293 cells were lysed at subconfluency with BC500 (500 mM NaCl, 20 mM Tris pH 7.4, 1% Triton X-100, 1 mM MnCl2, 1 mM CaCl2, 1× Protease Inhibitor Cocktail). The cell lysate was centrifuged and filtered. Pulldowns were performed with 20 microliters of concanavalin A sepharose (Sigma) for 1 hour at 4° C. The resin was washed with BC500 and protein was eluted with Laemmli sample buffer.
PTEN mRNA has an Upstream Alternate Initiation Start Site
PTEN mRNA deposited into NCBI (Li and Sun 1997; Steck, Pershouse et al. 1997) contains an extensive 5′UTR. Approximately 770 bp of contiguous sequence in the 5′UTR region is in frame with the start codon. No methionines are encoded in this region; however, there are several alternate initiation CUG codons beginning at −519 from the canonical start codon. Translation of this sequence revealed no identifiable domains according to scansite (scansite.mit.edu) and prosite (www.ebi.ac.uk/ppsearch). Translation of this entire region would add 173 amino acids to PTEN increasing its molecular mass to approximately 70 kilodaltons (
Alignment of other PTEN orthologs revealed that the translated sequence of the Homo sapiens UTR can be found in the open reading frames of PTEN from various species. Pan troglodytes, Bos Taurus, Apis mellifera and Caenorhabditis elegans all contain protein sequence homologous to the translated product of the Homo sapiens 5′UTR (
PTEN mRNA can Initiate Translation from an Alternate Upstream Site.
Overexpression of the PTEN ORF generated a single protein band at 55 kDa. Inclusion of the 5′UTR resulted in a second larger protein band of approximately 70 kDa. A larger protein band in PTEN immunoblots was also present in a number of cell lines endogenously and was detectable by different monoclonal antibodies (
Expression of a plasmid encoding the ORF of PTEN in the PTEN null PC3 cell line resulted in the generation of a 55 kDa protein. When plasmids that also encoded the 5′UTR were overexpressed, a 70 kDa protein was produced. Mutation of the upstream putative initiation codon from CTG to ATG (
Thus, the 5′ UTR was sufficient to initiate translation of a longer form of PTEN. Accordingly, the 5′ UTR was named 5′ATR for Alternately Translated Region and larger protein detected was named “PTEN-long”.
An affinity purified polyclonal antibody was generated against amino acids translated from the 5′ATR and it was used to confirm the production of recombinant PTEN-long in overexpression studies as well as the endogenous form in HEK293 cells (
The N-terminal sequence of PTEN-long contains a long stretch of alanines which could be indicative of either a transmembrane sequence or a signal peptide. Analysis of the translated sequence using SignalIP 3.0 predicted with a high degree of probability (>95%) that the sequence contains a signal peptide (
One of the hallmarks of secreted and extracellular proteins is the addition of complex sugar moieties in the golgi apparatus, a process known as glycosylation. Sugars can be added to asparagines at the consensus sequence N-X-S/T (X cannot be proline) via N-glycosylation (Gupta and Brunak 2002); the hydroxyl groups of serines, threonines and tyrosines can also be the target of what has been termed O-glycosylation (Julenius, Molgaard et al. 2005). PTEN has multiple O-glycosylation sites, but only one N-glycosylation site. Lectin concanavalin-A, which binds sugar moieties, was used in a pull-down assay to determine whether a portion of the PTEN complement in HEK293 cells was glycosylated. A mixture of PTEN that was approximately 50% PTEN-long (
PTEN bound a number of proteoglycans, such as syndecans and glypicans, which are found attached to the outer leaflet of the membrane. These proteoglycans are two of the most heparanated extracellular molecules (Blero, Zhang et al. 2005). PTEN has previously been shown to have high affinity for highly negatively charged species, a property of PTEN which leads to its preference of the highly anionic PIP3 (Das, Dixon et al. 2003). As heparan is one of the most negatively charged biological molecules, it was possible that heparan could mediate the binding of PTEN to the extracellular matrix. Using protein extracts from mouse livers, it was discovered that PTEN bound heparan with high affinity. Furthermore, continuous elution of PTEN from a heparin agarose column using 1M NaCl, also eluted PTEN-long (
PTEN-long stuck to the external surface of a cell membrane, should be sensitive to protease degradation. In the protease protection assay, live cells are incubated with a protease and only extracellular proteins are degraded as the lipid membrane is impermeable to the protease and serves to protect all intracellular proteins. HEK293 cells were removed from adherent culture by gentle agitation with PBS and suspended with increasing concentrations of Proteinase K. The reaction was stopped with PMSF and cells were lysed with laemlli buffer. PTEN-long displayed sensitivity to treatment with Proteinase K along with E-cadherin, which is a known extracellular protein (
Soluble PTEN-Long is Secreted into Media.
The presence of PTEN-long on the cell surface does not exclude the possibility that a portion of the protein is soluble and released into the cellular environment. Heparin sepharose was used to affinity purify PTEN-long from serum free media conditioned on HEK293 cells. Elution of the column revealed the presence of PTEN in the media migrating at a molecular weight of 50 kDa (
Secretion of PTEN into the media was further confirmed by overexpressing PTEN-long in HEK293 cells transfected with the ATG/ATG construct. These cells were used to produce serum free conditioned media overnight and the PTEN monoclonal antibody 6H2.1 was used to immunoprecipitate PTEN from 1 ml of media. The larger PTEN band was successfully immunoprecipitated from media along with the lower 55 kDa band. Because the protein was overexpressed, proper processing of the protein probably did not occur which resulted in the secretion of the full size 70 kDa PTEN.
One of the best sources of physiological secreted material is serum. Heparin sepharose was used to affinity purify PTEN from human serum. Human serum was spun down and filtered to remove particulate matter. It was then diluted 1:5 in BC150 and precleared extensively with protein A/G to remove IgG. The serum was batch incubated with a small amount of heparin sepharose. The heparin sepharose was eluted with laemmli buffer and the eluate was blotted for PTEN and for just secondary antibody alone to rule out heavy chain contamination. PTEN and PTEN-long were both found in human serum (
The anti-angiogenic role of PTEN-long is shown by the following: (1) PTEN-long is normally weakly expressed in the developing retina of the mouse but high level expression is seen in blood vessels undergoing involution/cell death during neonatal development (
Staining for PTEN-long and Blood vessels in the p7 murine retina revealed that PTEN-long selectively stained hyaloid vessels which are beginning to regress at this point in murine retinal vascular development. The antibody to PTEN-long was directed against the epitope: N-PRHQQLLPSLSSFFFSHRLPD-C (SEQ ID NO:3). Vessel staining was with BS1-lectin.
In one method for purification of PTEN-long 293 cells were transfected with ATG/ATG PTEN-long and cell lysate was passed over a Ni+ affinity column. PTEN-long was consistently purified using a Ni+ column on the AKTA Purifier using imidazole elution buffer.
Xenografts of U87 cells transfected prior to injection with either PTEN (orf 403 amino acid) or PTEN-long. At 7 days post injection there is a reduction in the mammary blood vessels in the PTEN-long over-expressing cohort as compared to the PTEN over-expressing cohort (n=4 of 4). This suggests that PTEN-long can affect the tumor environment.
A cargo molecule peptide is covalently attached via a peptide bond to a second peptide which comprises consecutive amino acid residues having the sequence set forth in residues 22-173 of SEQ ID NO 1. On contacting a cell membrane with this composition, the cargo molecule peptide is transported across the cell membrane and delivered into the cell.
A cargo molecule protein is covalently attached via a peptide bond to a peptide which comprises consecutive amino acid residues having the sequence set forth in residues 22-173 of SEQ ID NO 1. On contacting a cell membrane with this composition, the cargo molecule protein is transported across the cell membrane and delivered into the cell. The cargo molecule protein can be human p53, or an active fragment or active variant thereof.
A cargo molecule peptide is covalently attached to a nucleic acid which comprises consecutive amino acid residues having the sequence set forth in residues 22-173 of SEQ ID NO 1. On contacting a cell membrane with this composition, the cargo molecule nucleic acid is transported across the cell membrane and delivered into the cell. The nucleic acid can be covalently attached to the peptide via a disulfide bond. The nucleic acid can be an siRNA.
A second larger protein band in PTEN immunoblots from cell lysates and tissue was regularly observed. Evidence confirming that the larger band is PTEN includes: the larger protein bands were detected by different PTEN monoclonal antibodies; the larger protein is absent when cells are treated with siRNA against PTEN or the PTEN locus is knocked out in mice. The 5′UTR of PTEN was observed to be in frame for more than 700 base pairs with the classic start codon of PTEN. Furthermore, there is a CUG codon 522 base pairs upstream of PTEN, which, if translated, could account for the size of the larger protein band in PTEN immunoblots. Though it is not associated with a strong Kozak sequence, it does retain the −1 cytosine and +1 guanosine sequence. When translated and added to the PTEN ORF, a protein of approximately 70 kDa should be created, which is the molecular mass of the larger PTEN band that has been observed.
The translation of this sequence already existed in a number of PTEN orthologs within their actual coding sequence. The mouse 5′UTR was also inspected because a similar band in mouse tissue lysates had been observed. The mouse 5′UTR nucleotide sequence was highly homologous to the Homo sapiens 5′UTR and similarly in frame with the start codon. Two potential alternate start codons exist at −522 and −516 and translation of this sequence from those sites reveals amino acid sequence 90%+ homologous to the Homo sapiens sequence. The conservation of this putative protein is remarkable and demonstrated an evolutionary importance to this sequence. In order to better describe this sequence, it was renamed the 5′ATR or alternately translated region of PTEN to describe its potential for translation.
A plasmid was constructed in which the open reading frame of PTEN was cloned together with the 5′ATR and the expression of this recombinant PTEN was compared to the canonical 403 amino acid-producing open reading frame alone. The inclusion of the 5′ATR generated a second, higher PTEN protein band which migrated at approximately 70 kDa as compared to expression plasmids containing just the canonical ORF of PTEN, which created a single band migrating at 55 kDa. The larger protein accounted for only a minor portion of the total protein translated; however, mutation of the putative start site to ATG shifted the protein ratio to predominantly the larger form.
The conservation of protein sequence from the 5′ATR indicated that it was more than an artifact of evolution. The N-terminus contained a stretch of aliphatic amino acids which were predicted to be a transmembrane sequence. Use of Prosite and Signal 3.0IP predicted that the N-terminus of PTEN-long was a signal peptide with a protease cleavage site directly following it.
An in vivo protease protection assay was used to test if PTEN-long was located on the extracellular surface of the cells. PTEN-long showed progressive degradation with increasing amounts of extracellular protease, while PTEN did not, indicating that at least some of PTEN-long is extracelluar and at least in part attached to outer leaflet of the cell membrane. This is a most intriguing result given the implication of an active lipid phosphatase on the outer leaflet of the cell membrane. Two families of outer membrane bound proteoglycans, glypicans and syndecans, were previously identified in a PTEN protein complex.
The presence of PTEN on the cell surface does not exclude the possibility of a soluble secreted PTEN. Syndecans and glypicans are two of the most heavily heparanated proteoglycans. Heparan is a highly negatively charged glycosaminoglycan and PTEN has been shown to have an affinity for anions, in part explaining the choice of the highly negatively charged PIP3 as its substrate. Optimization experiments of PTEN purification from mouse liver revealed that both PTEN and PTEN-long could be purified using a heparin sepharose column. Furthermore, a protein of approximately 50 kDa was purified, from serum free media conditioned on HEK293 cells, using a heparin sepharose column. The purified protein was recognized by a monoclonal antibody specific against PTEN and a polyclonal antibody against unique amino acid residues present in PTEN-long. Previously the PTEN-long antibody only recognized a protein band around 70 kDa. The observation that both antibodies could recognize the one band indicates that proteolytic processing is probably occurring and that the protein observed by immunoblot is a fragment of PTEN which retained the epitopes of both antibodies. Both PTEN and PTEN-long could also be purified from human serum using heparin affinity purification.
A body of literature over the past 10 years has accumulated assuming the sequence of PTEN. Here proof for the existence of a novel form of PTEN which is translated from an alternate site and is secreted to both the outer leaflet as well as extracellular spaces.
The in vivo results show that PTEN-long is a novel anti-tumor compound that is normally present in human serum and which has anti-angiogenic and pro-apoptotic properties.
For the purpose of purification in e. coli, the PTEN-Long open reading frame was altered to delete the first 21 amino acids to remove the eukaryotic signal peptide sequence, which was termed the MSES version based upon its first four amino acids (
Purified MSES PTEN-long wild type or R6 mutant protein was added to media of MDA-MB-468 human cells grown in culture at a concentration of 1 microgram/ml. Under parallel identical conditions, cells were also treated with the original 403 amino acid PTEN lacking the alternatively translated region or a mock treatment prepared from cells expressing only the RFP protein. Cells were incubated at 37 degrees for 30 minutes before isolation of cells for cell fractionation. We isolated cytoplasmic and nuclear fractions. Effectiveness of fractionation was measured by western blotting with tubulin and BAF180 to control for cytoplasmic and nuclear fractions, respectively. Only wild-type PTEN-Long entered the cell and was present in the cytoplasm and nucleus. Importantly neither PTEN nor PTEN-Long deleted for R6 was able to enter the cell. These data indicate that the R6 sequence is required for efficient cell entry and that the initial 21 amino acids is not.
The above studies suggested that the first 153 amino acids of the construct in
PL-p53 fusion protein was induced in e. coli using IPTG and purified from bacterial lysates using nickel and heparin affinity columns. PL-p53 protein was incubated with MDA-MB-468 or H1299 human cancer cells for 1 hr before collecting cells for fractionation to determine if the fusion protein could enter cells. Increased p53 could be detected in the nucleus of treated but not mock treated H1299 cells and MDA-MB-468 cells and was associated with an increase in the expression of PUMA and p21, both targets of the p53 transcription factor (
Glucose Tolerance Test in Mice Treat with Bacterially Expressed MSES PTEN-Long
Mice were treated with bacterially expressed MSES PTEN-long (Long), RFP (red fluorescent protein mock control). IgG control, and anit-PTEN antibody 138G6 that blocks uptake into cells. PTEN-long reduced glucose level versus other treatments, while the anti-PTEN antibody 138G6 increased glucose relative to IgG control (
This application claims priority of U.S. Provisional Application No. 61/338,377, filed Feb. 17, 2010 the entire contents of which are hereby incorporated by reference.
The work disclosed herein was made with government support under grant no. CA082783 from the National Cancer Institute. Accordingly, the U.S. Government has certain rights in this invention.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/US2011/025312 | 2/17/2011 | WO | 00 | 3/20/2013 |
Number | Date | Country | |
---|---|---|---|
61338377 | Feb 2010 | US |