Vital speed profile to control a train moving along a track

Information

  • Patent Grant
  • 9168935
  • Patent Number
    9,168,935
  • Date Filed
    Monday, August 12, 2013
    11 years ago
  • Date Issued
    Tuesday, October 27, 2015
    9 years ago
Abstract
A speed profile for an entire train trip includes a maximum allowable speed at each point of the entire trip, taking into account the ability of the train to comply with speed reductions encountered during the trip. The speed profile includes a braking curve that gradually reduces from a higher speed to a lower speed starting at a point at which the train must begin braking in order to be traveling at the lower speed when the train reaches the point at which the lower speed limit begins. The speed profile is generated on multiple wayside computers, cross checked, and then vitally transmitted to an onboard locomotive control system. The onboard control system includes redundant speed sensors with redundant vital circuits, and also includes redundant speed comparators to ensure that the train doesn't exceed the speed profile. A GPS receiver may be used for greater reliability.
Description
BACKGROUND

Train safety is an important issue in the United States and throughout the world. This is true for both passenger trains and for freight trains. Although movement of a train can be directed by a computerized train system in some instances, the movement of the vast majority of trains is directed by a human operator. Reliance on a human operator necessarily creates the possibility of mistakes being made by that operator, and these mistakes can and often do lead to unsafe conditions and, in the worst case, accidents and loss of life and property.


One aspect of train safety is ensuring that trains do not exceed maximum allowable speeds. Maximum allowable speeds can include: 1) upper limits on train speed that may be applicable throughout an entire rail system; 2) permanent maximum speed limits applicable to a certain specific sections of track; and 3) temporary speed restrictions that may be applicable throughout an entire rail system (e.g., a lower speed on hot summer days when there is a possibility of track buckling) or a portion of a rail system (e.g., a restriction on a particular section of track that is undergoing repairs).


A second aspect of train safety is avoiding collisions between trains. Train operators are typically authorized by a signaling system or a dispatcher to move a train from one area (sometime referred to in the art as a “block”) to another. The operator is expected to move the train in only those areas for which the train has been authorized to travel. When an operator moves a train outside an authorized area, the possibility that the train may collide with another train that has been authorized to move in the same area arises.


Concern over operator error in complying with speed restrictions and limits on authorized movement has led to a number of systems that attempt to prevent such operator errors. Early versions of such systems, such as the cab signal system, involve the transmission of signal information into a locomotive via a signal transmitted over an electrical power line through which the train receives electrical power for movement. Such systems will take preventive action (e.g., a “penalty” brake application) when the train is moving outside the authorized area. However, this can lead to unsafe conditions because the preventive action does not occur until after the authorized movement limit has been violated.


Other, more sophisticated systems, such as the TRAIN SENTINEL™ system marketed by the assignee of this application. Quantum Engineering, Inc., anticipate when a train will violate a limit on a movement authorization or exceed a speed limit, and take preventive action prior to a violation to ensure that the limit on a movement authorization or the speed limit is not violated. However, this system requires significant onboard computing capability.


An important issue with such train control systems is whether or not they are sufficiently reliable. A relevant industry standard is the IEEE 1483 “Standard for Verification of Vital Functions in Processor-Based Systems Used in Rail Transit Control.” This standard includes a definition of what is necessary for a train control system to be considered as “vital.”





BRIEF DESCRIPTION OF THE FIGURES


FIG. 1 illustrates a vital onboard control system according to one embodiment.



FIG. 2 is a block diagram of a system including wayside equipment and a portion of the onboard control system shown in FIG. 1.





DETAILED DESCRIPTION

The present invention will be discussed with reference to preferred embodiments of end of train units. Specific details, such as types of positioning systems and time periods, are set forth in order to provide a thorough understanding of the present invention. The preferred embodiments discussed herein should not be understood to limit the invention. Furthermore, for ease of understanding, certain method steps are delineated as separate steps; however, these steps should not be construed as necessarily distinct nor order dependent in their performance.


In one aspect of the invention, a speed profile is constructed for an entire train trip. The speed profile includes a maximum allowable speed at which the train is allowed to travel at each point of the entire trip, taking into account the ability of the train to comply with speed reductions encountered during the trip. At points in the trip in which the train's speed must be reduced (e.g., at the end point of the trip or at a point in the trip at which a temporary speed restriction results in a decrease of the maximum allowable speed), the speed profile does not simply make a sharp transition at the point in which reduced speed becomes effective. Rather, the speed in the speed profile gradually reduces from the higher speed to the lower speed starting at a point at which the train must begin braking in order to be traveling at the lower speed when the train reaches the point at which the lower speed limit becomes effective. The speed profile may also be lower than a maximum allowable speed in areas of track corresponding to steep downhill grades where a train's brakes may not have sufficient capacity to prevent a train traveling at a maximum allowable speed on an upper portion of a downhill grade from accelerating above the maximum allowable speed on a lower portion of the downhill grade. At the end of the trip, the speed profile gradually decreases to zero to ensure that the train is at zero speed (i.e., the train is stopped) prior to reaching the limit of its authority.


The braking curves (the portions of the speed profile during which the speed is gradually reduced from a higher speed to a lower speed) may be calculated using any method known in the art. In some embodiments, a worst case assumption is made for the weight and speed of the train, the number of cars on the train, the types of brakes on the cars, and the elevation and the grade of the track on which the train is traveling. In other embodiments, one or more sensors are used in order to determine more accurate values for these braking curve parameters. The weight of the train may be entered by the operator at the start of the trip. The speed of the train may be determined through use of a rotation sensor/tachometer attached to an axle or wheel of the train. The grade of the track may be determined through use of a GPS system or rotation sensor dead reckoning system to determine the location of the train coupled with a track database that uses position as an index to return a track grade corresponding to the index.


At a point in the trip at which the maximum allowable speed increases, the speed profile makes a sharp change in some embodiments, which allows the train to accelerate at its maximum allowable rate. In other embodiments, the speed profile may rise gradually from the lower speed to the higher speed, which in effect limits the rate at which the operator can accelerate the train. One reason for doing this is to encourage the operator to conserve fuel by avoiding rapid accelerations.


It is important to ensure that the speed profile is vital. There are several methods that can be used to accomplish this. One method, which is particularly useful in embodiments in which the computing power of the control system onboard the locomotive is limited, is to generate the speed profile on multiple wayside computers, cross check the speed profiles generated on these multiple computers with each other, and then transmitting the verified speed profile to the control system on the locomotive in a vital manner.


In addition to ensuring that the speed profile is vital, it is also necessary to ensure that a vital control system is in place to enforce compliance with the speed profile. In a preferred embodiment, the control system utilizes vital circuits such as those described in U.S. Pat. Nos. 4,368,440 and 3,527,986 to ensure that a signal from a respective axle drive speed sensor is functioning correctly. The speed sensors provide a signal that is indicative of a speed of the train, which can be compared to a maximum allowable speed as indicated by the flight plan discussed above. Preferably, two separate axle drive speed sensors are utilized, each on a different axle.


The results from the axle drives are correlated to each other and against a speed indicated by or derived from a GPS receiver using two redundant speed comparators. The GPS receiver signal is preferably determined to be vital using one or more of the methods described in co-pending U.S. patent application Ser. No. 11/835,050, filed Aug. 7, 2007 and entitled “METHODS AND SYSTEMS FOR MAKING A GPS SIGNAL VITAL,” which is incorporated in its entirety by reference herein.


If the speed of the train is determined to exceed the speed profile, corrective action is taken. This corrective action can include warnings to the operator and, if the operator does not act in response to the warnings, can also include an emergency brake activation. An emergency brake activation may be accomplished using, for example, a P2A valve as is known in the art. Such valves are vital in that electrical power must be applied to the valve in order to keep the valve closed to prevent an emergency brake application. In this manner, any disruption to the power supply to the P2A valve results in an emergency brake application. In some embodiments, a voltage not in use elsewhere on the train is used to supply power to the P2A valve. The power supply may be under control of redundant watchdog timers configured such that the absence of a signal from the speed comparator circuits prior to the expiration of a timeout period will result in the disabling of the power supply, which in turn will deenergize the P2A valve thereby triggering an emergency brake application.



FIG. 1 illustrates a vital train control circuit 10 according to one embodiment. The vital circuit 10 includes two axle drive sensors (also sometimes referred to as tachometers and/or revolution counters) 100, 200. The sensors 100, 200 may be of the type known as axle generators that output an alternating current signal whose frequency varies in proportion with the speed of the train. In other embodiments, other types of circuits such as optical tachometers and other devices known to those of skill in the art may be used. Each of the axle drive sensors 100, 200 is preferably associated with a different axle on the train.


Each of the axle drive sensors 100, 200 is preferably connected to a respective vital circuit 101, 201. The function of the vital circuits 101, 201 is to ensure to the extent possible that the sensors are operating correctly. The primary concern with the sensors 100, 200 is that they do not erroneously indicate a zero speed or a speed lower than the true speed. Indications of speeds in excess of the true speed are undesirable because they may result in unnecessary emergency brake applications or may require the train operator to operate the train more slowly than necessary, but false indications of speeds in excess of the true speed are tolerable because they will not result in an unsafe situation as would false zero speeds. In embodiments in which the sensors 100, 200 are of the axle generator type, vital circuits such as those described in U.S. Pat. No. 4,368,440, 4,384,250, or 3,527,986, or other vital circuits may be used (those of skill in the art will recognize that other types of circuits are used with other types of sensors such as the optical sensors discussed above). Such circuits pass an alternating current signal from an oscillator through the stator of the axle drive generator to determine whether the axle drive stator is good. These circuits cannot ensure that the mechanical connections from the sensor to the axle and from the axle to the wheel are intact, but this is accounted for by the use of two separate axle sensors on two different axles and by correlation of the axle sensor signals with the additional vital GPS signal as discussed above.


The speeds indicated by the sensors 100, 200 are each input to each of two redundant speed comparators 300, 301. The speed comparators 300, 301 are preferably implemented using microprocessors or other data processing elements. The microprocessor in speed comparator 300 is preferably of a different type, and preferably from a different manufacturer, than the microprocessor in speed comparator 301. Also input to the speed comparators 300 and 301 is a vital GPS signal from GPS vitality circuit 500. The GPS vitality circuit 500 is connected to two GPS receivers 501 and 502. The GPS vitality circuit 500 may be implemented using a microprocessor or other data processing circuit, and may include a memory for storing a track database as described in the above-referenced co-pending commonly owned U.S. patent application Ser. No. 11/835,050. The GPS vitality circuit 500 may be a implemented on the same microprocessor as one of the speed comparator circuits 300, 301 or may be implemented on a separate microprocessor. A memory (e.g., a magnetic disk storage device or other memory, preferably but not necessarily non-volatile) 400 with the speed profile is also connected to each of the speed comparators 300, 301.


The speed comparators 300, 301 ensure that the speeds indicated by each of the axle sensors 100, 200 and the speed from the GPS vitality circuit 500 are correlated. In some embodiments, this is done by simply comparing the speeds and ensuring that they are within an acceptable error of each other. In other embodiments, more sophisticated methods are used. These methods may include accounting for areas in which wheel slippage may occur (e.g., where the grade of the track is significant) such that excessive speeds from one of the axle sensors 100, 200 do not trigger an error. If the speeds from any of the three speed inputs do not correlate, corrective action is taken. In some embodiments, the corrective action may include warning the operator that there is an apparent malfunction and, if the operator does not respond, initiating an emergency brake application. For example, warning may be presented to the operator via a display 800. Other forms of corrective action may also be used, and some embodiments include track databases that indicate areas in which the GPS receiver is unable to receive transmissions from the GPS satellites.


The speed comparators 300, 301 also determine a calculated train speed using the inputs from the axle sensors 100, 200 and the GPS vitality circuit 500 and compare this calculated train speed to the speed profile in the memory 400. If the calculated train speed exceeds the speed from the speed profile corresponding to the present position of the train, corrective action is taken. The present position of the train may be determined in any number of ways, including by using the position reported by the GPS receivers 501, 502, by integrating speed from the axle sensors 100, 200, through the use of a transponder system, or any combination of the foregoing. The aforementioned U.S. patent application Ser. No. 11/835,050 includes several methods that may be utilized to determine train position accurately.) In some embodiments, the corrective action includes warning the operator and, if the train speed is not reduced below the corresponding speed in the speed profile, an emergency brake application is triggered as described below.


The speed comparators 300, 301 must each send a periodic reset to a corresponding one of two watchdog timers 302, 303 to prevent them from timing out. The watchdog timers 302, 303 may be implemented as simple counters in some embodiments. This message is preferably transmitted at short intervals, such as every 10 milliseconds. If either of the watchdog timers 302, 303 fails to receive one of these periodic reset pulses from the corresponding speed comparators 300, 301, a timeout occurs resulting in an interruption of power from the power supply 705 to the P2A valve 600, thereby triggering an emergency brake application. In the event that one of the speed comparators 300, 301 determines that the operator has failed to reduce the speed of the train to a speed below the corresponding speed from the speed profile, the speed comparator 300, 301 initiates an emergency brake application by not sending a reset pulse to the corresponding watchdog timer 302, 303.


Each of the watchdog timers 302, 303 is connected to a power supply 705. If either of the watchdog timers 302, 303 signals the power supply that it has timed out (which may be due to a failure of one of the speed comparators 300, 301 or may be because the operator has not reduced the speed of the train to the allowable speed indicated by the speed profile), the power supply 705 is configured to interrupt the supply of power to the P2A valve 600 to cause an emergency brake application. In some embodiments, the power supply 705 is configured to produce a unique voltage not used elsewhere on the train to reduce the possibility that a short results in the unintended application of power to the P2A valve 600.


As discussed above, the speed profile is stored in the memory 400. Calculating the speed profile and storing it in the memory is accomplished in a number of different ways in various embodiments, one of which is illustrated in the system 20 of FIG. 2. The system 20 includes both wayside and onboard equipment. Located along the wayside are a pair of redundant wayside processors 450, 460. Each of the wayside processors 450, 460 is responsible for calculating a speed profile for at least a portion of the train trip taking into account elevation, curvature, authority limits, temporary and permanent speed restrictions. In some embodiments, there are multiple pairs of wayside processors along a train's route, and each pair is responsible for calculating the speed profile for an assigned track segment. In other embodiments, the processors are staggered such that there are always two processors responsible for calculating a speed profile for any particular point on the track, but each processor calculates a speed profile for a portion of track that corresponds in a first part to a first other processor and in a second part to a second other processor. The first alternative will be discussed in further detail below.


As discussed above, the speed profile includes a maximum allowable speed for the train along each point of the trip, and this maximum allowable speed may be less than the posted maximum allowable speed. Preferably, the wayside processors 450, 460 are manufactured by different manufacturers and are preferably running different software. The speed profiles calculated by each of the two wayside processors 450, 460 are compared to each other by the wayside integration processor 470. If the two speed profiles do not match, an error is declared. If the two speed profiles do match, one of the speed profiles is transmitted in a message via the wayside transceiver 480 to a transceiver 420 onboard the train. The message received by the onboard transceiver 420 is processed by an onboard processor 410. This processing includes, at a minimum, verifying that the checksum for the message is correct by an onboard processor 410 (which may be a separate processor or may be performed by one of the other processors discussed above in connection with FIG. 1, such as one of the speed comparators 300, 301). If the speed profile message is correct, the speed profile is stored in the speed profile memory 400 for use by the speed comparators 300, 301 as described above.


A particular embodiment of a vital system for ensuring that a train does not exceed a maximum allowable speed as it moves along a track has been shown above. Those of skill in the art will recognize that numerous variations on the embodiment shown above are possible. Such variations include using less than all of the redundancy discussed above. For example, alternative embodiments may use a single GPS receiver rather than two GPS receivers, or a single axle sensor rather than two axle sensors. Different types of components may also be used (e.g., inertial navigation systems rather than GPS receivers, or optical axle sensors rather than electromagnetic axle drive generators). A single watchdog timer driven be each of the speed comparator circuits is employed in some embodiments. In yet other embodiments, a single speed comparator is utilized. It will be apparent to those of skill in the art that numerous other variations in addition to those discussed above are also possible. Therefore, while the invention has been described with respect to certain specific embodiments, it will be appreciated that many modifications and changes may be made by those skilled in the art without departing from the spirit of the invention. It is intended therefore, by the appended claims to cover all such modifications and changes as fall within the true spirit and scope of the invention.


Furthermore, the purpose of the Abstract is to enable the U.S. Patent and Trademark Office and the public generally, and especially the scientists, engineers and practitioners in the art who are not familiar with patent or legal terms or phraseology, to determine quickly from a cursory inspection the nature and essence of the technical disclosure of the application. The Abstract is not intended to be limiting as to the scope of the present invention in any way.

Claims
  • 1. A system for controlling a train, the system comprising: a first processor, the first processor being configured to calculate a first speed profile for the train along a first portion of track associated with the first processor, the first speed profile including a maximum allowable speed of the train for each point along the first portion of track, the first speed profile including a braking curve corresponding to a portion of the track in which the maximum allowable speed transitions from a higher speed to a lower speed;a second processor, the second processor being configured to calculate a second speed profile for the train along a second portion of track associated with the second processor, the second speed profile including a maximum allowable speed of the train for each point along the second portion of track, the second speed profile including a braking curve corresponding to a portion of the track in which the maximum allowable speed transitions from a higher speed to a lower speed, at least part of the second portion of track associated with the second processor overlapping the first portion of track associated with the first processor;a transmitter; andan integration processor connected to the transmitter and connected to receive the first speed profile from the first processor and the second speed profile from the second processor, the integration processor being configured to compare the part of the second speed profile overlapping the first speed profile to the first speed profile and, if the parts of the first speed profile and the second speed profile match, to transmit the part of the speed profile matching the part of the second speed profile to a receiver located onboard a train via the transmitter;a receiver located onboard the train, the receiver being configured for communication with the transmitter;an onboard processor located onboard the train and connected to the receiver; anda memory located onboard the train and connected to the onboard processor;wherein the onboard processor is configured to store a speed profile received from the integration processor via the receiver in the memory and to control the train such that the speed of the train does not exceed the speed profile.
  • 2. The system of claim 1, wherein the first processor and the second processor are manufactured by different manufacturers.
  • 3. The system of claim 1, wherein the first processor and the second processor are configured to execute code corresponding to different source code.
  • 4. The system of claim 1, further comprising: at least two axle sensors, each axle sensor being configured for connection to a different axle on a train; anda pair of vital circuits connected to the onboard processor, each vital circuit in the pair being connected to a respective axle sensor, each vital circuit being configured to confirm that at least some portion of the respective axle sensor to which the vital circuit is connected is functioning properly.
  • 5. The system of claim 1, wherein the entire second portion of the tack associated with the second processor overlaps the first portion of the track associated with the first processor.
  • 6. The system of claim 1, wherein the first and second speed profile includes a portion in which the maximum allowable speed rises gradually from a lower speed to a higher speed, whereby a rate at which an operator can accelerate the train is limited by the first and second speed profiles.
  • 7. The system of claim 1, wherein the braking curves are based at least in part on a grade of the track to which the speed profile pertains and a weight of the train.
  • 8. The system of claim 4, wherein at least one axle sensor is an axle generator.
  • 9. The system of claim 4, wherein the at least one axle sensor is an optical sensor.
  • 10. The system of claim 1, further comprising: a pair of speed comparators, each speed comparator being connected to at least one of the vital circuits, each speed comparator having an output connected to an input of a power supply;a power supply connected to the output of each of the comparators; anda valve connected to the power supply and in fluid communication with an air brake pipe, the valve being configured such that it remains closed when power from the power supply is supplied to the valve and causes an application of the train's brakes when power from the power supply is not supplied to the valve;wherein each of the speed comparators is configured to control its respective output such that the power supply does not supply power to the valve when a speed of the train exceeds a maximum allowable speed as indicated in a corresponding portion of the speed profile.
  • 11. The system of claim 10, further comprising at least one global positioning system (GPS) receiver connected to supply data to at least one of the speed comparators.
  • 12. The system of claim 11, wherein the at least one GPS receiver supplies data to both of the speed comparators.
  • 13. The system of claim 10, further comprising: a first GPS receiver;a second GPS receiver; anda GPS vitality circuit connected to the first GPS receiver and the second GPS receiver and at least one of the speed comparators, the GPS vitality circuit being configured to correlate information from the first GPS receiver and the second GPS receiver and supply the correlated information to the at least one of the speed comparators.
  • 14. The system of claim 10, further comprising: a pair of timers, each of the timers being connected between a respective speed comparator and the power supply, wherein each timer is configured to control the power supply to stop providing power to the valve if a signal is not received from its respective speed comparator within a predetermined time period.
  • 15. The system of claim 14, wherein at least one vital circuit is configured to pass an alternating current signal from an oscillator through a stator of the at least one axle drive generator to which it is connected.
  • 16. The system of claim 10, wherein the power supplied to the valve by the power supply is different in at least one parameter than power supplied to any other component on the train.
CROSS-REFERENCE TO RELATED APPLICATIONS

This application is a divisional of U.S. patent application Ser. No. 12/495,378 filed Jun. 30, 2009, which is incorporated by reference in its entirety.

US Referenced Citations (142)
Number Name Date Kind
3527986 Darrow Sep 1970 A
3553488 Darrow Jan 1971 A
4017044 Anderson et al. Apr 1977 A
4181943 Mercer, Sr. et al. Jan 1980 A
4209828 Anderson et al. Jun 1980 A
4217643 Anderson et al. Aug 1980 A
4234922 Wilde et al. Nov 1980 A
4368440 Darrow Jan 1983 A
4384250 Darrow May 1983 A
4459668 Inoue et al. Jul 1984 A
4495578 Sibley et al. Jan 1985 A
4558415 Zuber et al. Dec 1985 A
4561057 Haley, Jr. et al. Dec 1985 A
4710880 Zuber Dec 1987 A
4711418 Aver, Jr. et al. Dec 1987 A
4740972 Rutherford Apr 1988 A
4956779 Rutherford Sep 1990 A
5072900 Malon Dec 1991 A
5129605 Burns et al. Jul 1992 A
5177685 Davis et al. Jan 1993 A
5267473 Bezos et al. Dec 1993 A
5309140 Everett et al. May 1994 A
5332180 Peterson et al. Jul 1994 A
5340062 Heggestad Aug 1994 A
5361212 Class et al. Nov 1994 A
5364047 Petit et al. Nov 1994 A
5377938 Bezos et al. Jan 1995 A
5383717 Fernandez et al. Jan 1995 A
5394333 Kao Feb 1995 A
5398894 Pascoe Mar 1995 A
5452870 Heggestad Sep 1995 A
5453942 Wood Sep 1995 A
5507457 Kull Apr 1996 A
5533695 Heggestad et al. Jul 1996 A
5590966 Cherny et al. Jan 1997 A
5610616 Vallot et al. Mar 1997 A
5620155 Michalek Apr 1997 A
5621646 Enge et al. Apr 1997 A
5699986 Welk Dec 1997 A
5736923 Saab Apr 1998 A
5740547 Kull et al. Apr 1998 A
5747685 Skantar May 1998 A
5751569 Metel et al. May 1998 A
5757291 Kull May 1998 A
5785283 Ehrenberger et al. Jul 1998 A
5803411 Ackerman et al. Sep 1998 A
5817934 Skantar Oct 1998 A
5828979 Polivka et al. Oct 1998 A
5836529 Gibbs Nov 1998 A
5866811 Skantar Feb 1999 A
5867122 Zahm et al. Feb 1999 A
5898102 Skantar Apr 1999 A
5944768 Ito et al. Aug 1999 A
5956664 Bryan Sep 1999 A
5978718 Kull Nov 1999 A
5995881 Kull Nov 1999 A
6008731 Capan Dec 1999 A
6049745 Douglas et al. Apr 2000 A
6067484 Rowson et al. May 2000 A
6081769 Curtis Jun 2000 A
6087950 Capan Jul 2000 A
6095618 Heneka et al. Aug 2000 A
6102340 Peek et al. Aug 2000 A
6112142 Shockley et al. Aug 2000 A
6128501 Ffoulkes-Jones Oct 2000 A
6135396 Whitfield et al. Oct 2000 A
6144901 Nickels et al. Nov 2000 A
6179252 Roop et al. Jan 2001 B1
6195600 Kettle, Jr. Feb 2001 B1
6218961 Gross et al. Apr 2001 B1
6227625 Gaughan May 2001 B1
6236185 Hines et al. May 2001 B1
6311109 Hawthorne et al. Oct 2001 B1
6322025 Colbert et al. Nov 2001 B1
6345233 Erick Feb 2002 B1
6353780 Hart Mar 2002 B1
6371416 Hawthorne Apr 2002 B1
6373403 Korver et al. Apr 2002 B1
6374184 Zahm et al. Apr 2002 B1
6377877 Doner Apr 2002 B1
6385532 Dance et al. May 2002 B1
6397147 Whitehead May 2002 B1
6421587 Diana et al. Jul 2002 B2
6456937 Doner et al. Sep 2002 B1
6459964 Vu et al. Oct 2002 B1
6459965 Polivka et al. Oct 2002 B1
6470245 Proulx Oct 2002 B1
6480766 Hawthorne et al. Nov 2002 B2
6487478 Azzaro et al. Nov 2002 B1
6505104 Collins Jan 2003 B2
6600979 Kumar Jul 2003 B1
6609049 Kane et al. Aug 2003 B1
6622067 Lovelace, II et al. Sep 2003 B1
6641090 Meyer Nov 2003 B2
6668216 Mays Dec 2003 B2
6704228 Jang et al. Mar 2004 B2
6721657 Ford et al. Apr 2004 B2
6824110 Kane et al. Nov 2004 B2
6845953 Kane et al. Jan 2005 B2
6853888 Kane et al. Feb 2005 B2
6862502 Peltz et al. Mar 2005 B2
6863246 Kane et al. Mar 2005 B2
6865454 Kane et al. Mar 2005 B2
6903658 Kane et al. Jun 2005 B2
6915191 Kane et al. Jul 2005 B2
6957131 Kane et al. Oct 2005 B2
6996461 Kane et al. Feb 2006 B2
7073753 Root et al. Jul 2006 B2
7096096 Kane et al. Aug 2006 B2
7222003 Stull et al. May 2007 B2
7467032 Kane et al. Dec 2008 B2
7557748 Zahm et al. Jul 2009 B1
7650207 Metzger Jan 2010 B2
7679298 Kumar Mar 2010 B2
7722134 Kane May 2010 B2
7769544 Blesener et al. Aug 2010 B2
8229607 Hrdlicka Jul 2012 B2
8234023 Kumar Jul 2012 B2
8271153 Kumar Sep 2012 B2
8296065 Haynie Oct 2012 B2
20010056544 Walker Dec 2001 A1
20020004693 Collins Jan 2002 A1
20020049520 Mays Apr 2002 A1
20020070879 Gazit et al. Jun 2002 A1
20030144772 Proulx Jul 2003 A1
20030183729 Root et al. Oct 2003 A1
20030222981 Kisak et al. Dec 2003 A1
20030225490 Kane et al. Dec 2003 A1
20030236598 Vilarreal Antelo et al. Dec 2003 A1
20040120305 Aiken, II et al. Jun 2004 A1
20050004722 Kane et al. Jan 2005 A1
20050065726 Meyer et al. Mar 2005 A1
20050107954 Nahla May 2005 A1
20060017611 Hatch et al. Jan 2006 A1
20060271291 Meyer Nov 2006 A1
20060286965 Lauridsen et al. Dec 2006 A1
20070095988 Kane May 2007 A1
20070141988 Kuehnel et al. Jun 2007 A1
20070170314 Kane et al. Jul 2007 A1
20090115633 Lawry May 2009 A1
20100241296 Rhea Sep 2010 A1
20100312461 Haynie Dec 2010 A1
Foreign Referenced Citations (4)
Number Date Country
2185084 Apr 2000 CA
196 36 108 Mar 1998 DE
197 01 800 Jul 1998 DE
WO 0186317 Nov 2001 WO
Non-Patent Literature Citations (78)
Entry
“HCRQ System Safety, Software Safety Experts,” Retrieved: Oct. 29, 2004, http://www.hcrq.com/Rail.html.
“IEEE Standard for Verification of Vital Functions in Processor-Based Systems Used in Rail Transit Control,” Rail Transit Vehicle Interface Committee of the IEEE Vehicular Technology Society, Approved Mar. 30, 2000, IEEE-SA Standards Board, The Institute of Electrical and Electronics Engineers, Inc., New York, New York, 2000.
“NovAtel FAQs,” Retrieved: Nov. 19, 2004, http://www.novatel.com/Customer—Support/faq14.html.
Tom Sullivan, “A Revolution in Serial Trainline Communications,” LonMark: Solutions, Retrieved: Oct. 29, 2004, http://www.lonmark.org/solution.trans/arevolut.htm, 2002.
William C. Vantuono, “CBTC: A Maturing Technology,” RailwayAge, Third Internaitonal Conference on Communicatons-Based Train Control, Retrieved: Oct. 29, 2004, http://www.railwayage.com/jun99/cbtc.html, Jun. 1999.
International Search Report issued in PCT/US2008/071125, mailed Dec. 19, 2008.
Written Opinion issued in PCT/US2008/071125, mailed Dec. 19, 2008.
“Trainlink® ATX (Air Turbine) End of Train Telementry Device,” www.elpasohub.org/ATH.htm as printed Sep. 10, 2004 (3 pages).
www.elpasohuborg/images/images10.gif as printed Sep. 10, 2004 (1 page).
“Testimony of Jolene M. Molitoris, Federal Railroad Aministrator, US Dept. of Transportation before the House Committee on Transportation and Infrastructure Subcommittee on Railroads,” Federal Railroad Aministration, US Dept. of Transportation, Apr. 1, 1998 (23 pages).
“System Architecture, ATCS Specification 100,” May 1995 (27 pages).
“A New World for Communications & Signaling,” Progressive Railroading, pp. 29-35, May 1986.
“Advanced Train Control Gains Momentum,” Progressive Railroading, pp. 56-58, Mar. 1986.
“Railroads Take High Tech in Stride,” Progressive Railroading, pp. 43-45, May 1985.
Lyle, Denise, “Positive Train Control on CSXT,” Railway Fuel and Operation Officiers Association, Annual Proceedings, pp. 127-135, 2000.
Lindsey, Ron A., “C B T M, Communications Based Train Management,” Railway Fuel and Operating Officers Association, Annual Proceedings, pp. 36-47, 1999.
Moody, Howard G., Advanced Train Control Systems A System to manage Railroad Operation, Railway Fuel and Operation Officers Association, Annual Proceedings, pp. 155-164, 1993.
Ruegg, G.A., “Advanced Train Control Systems ATCS,” Railway Fuel and Operation Officers Association, Annual Proceedings, pp. 189-195, 1986.
Malone, Frank, “The Gaps Start to Close,” Progressive Railroading, pp. 36-40, May 1987.
“On the Threshold of ATCS,” Progressive Railroading, pp. 33-34, Dec. 1987.
“CP Advances in Train Control,” Prgressive Railroading, pp. 72-73, Sep. 1987.
“Communications/Signaling: Vital for Dramatic Railroad Advances,” Progressive Railroading, pp. 27-32, May 1988.
“ATCS's System Engineer,” Progressive Railroading, pp. 43-46, Jul. 1988.
“The Electronic Railroad Emerges,” Progressive Railroading, pp. 23-30, May 1989.
“C3 Comes to the Railroads,” Progressive Railroading, pp. 43-48, Sep. 1989.
“ATCS on Verge of Implementation,” Progressive Railroading, pp. 33-40, Dec. 1989.
“ATCS Evolving on Railroads,” Progressive Railroading, pp. 24-32, Dec. 1992.
“High Tech Advances keep Railroads Rolling,” Progressive Railroading, pp. 41-50, May 1994.
“FRA Promotes Technology to Avoid Train-To-Train Collisions,” Progressive Railroading, Aug. 1994.
“ATCS Moving Slowly But Steadily From Lab for Field”, Progressive Railroading, pp. 30-38, Dec. 1994.
Judge, T., “Electronic Advances Keeping Railroads Rolling,” Progressive Railroading, pp. 35-47, Jun. 1995.
Judge, T., “Electronic Advances Improve How Railroads Manage,” Progressive Railroading, pp. 35-45, Dec. 1995.
Judge, T., “BNSF/UP PTS Pilot Advances in Northwest,” Progressive Railroading, pp. 49-53, May 1996.
Foran, P., “Train Control Quandary, Is CBTC Viable? Railroads, Suppliers Hope Pilot Projects Provide Clues,” Progressive Railroading, pp. 32-40, Jun. 1997.
“PTS Would've Prevented Silver Spring Crash: NTSB,” Progressive Railroading, pp. 18-21, Jul. 1997.
Foran, P., “A ‘Positive’ Answer to the Interoperability Call,” Progressive Railroading, pp. 52-56, Sep. 1997.
Foran, P., “How Safe is Safe Enough?,” Progressive Railroading, pp. 24-27, Oct. 1997.
Foran, P., “A Controlling Interest in Inoperability,” Progressive Railroading, pp. 51-56, Apr. 1998.
Derocher, Robert J., “Transit Projects Setting Pace for Train Control,” Progressive Railroading, pp. 79-81, Jun. 1998.
Kube, K., “Variations on a Theme,” Progressive Railroading, pp. 39-43, Dec. 2001.
Kube, K., “Innovation in Inches,” Progressive Railroading, pp. 38-42, Feb. 2002.
Vantuono, W., “New York Leads a Revolution,” Railway Age, pp. 89-92, Sep. 1996.
Vantuono, W., “Do You Know Where Your Train Is?,” Railway Age, pp. 41-42, Feb. 1996.
Gallamore, R., “The Curtain Rises on the Next Generation,” Railway Age, pp. 40-42, Jul. 1998.
Burke, J., “How R&D is Shaping the 21st Century Railroad,” Railway Age, pp. 55-60 and 83, Aug. 1998.
Vantuono, W., “CBTC: A Maturing Technology,” Third International Conference on Communications Based Train Control, Railway Age, pp. 37-43, Jun. 1999.
Sullivan, T., “PTC—Is FRA Pushing Too Hard?,” Railway Age, Aug. 1999 (5 pages).
Sullivan, T., “PTC: A Maturing Technology,” Railway Age, pp. 55-57, Apr. 2000.
Moore, W., “How CBTC Can Increase Capacity,” Railway Age, Apr. 2001 (3 pages).
Vantuono, W., “CBTC: The Jury is Still Out,” Railway Age, Jun. 2001 (3 pages).
Vantuono, W., “New-Tech Train Control Takes Off,” Railway Age, pp. 41-46, May 2002.
Union Switch & Signal Intermittent Cab Signal, Bulletin 533, 1998 (4 pages).
GE Harris Product Sheet: “Advanced Systems for Optimizing Rail Performance” and “Advanced Products for Optimizing Train Performance,” undated (2 pages).
GE Harris Product Sheet: “Advanced, Satellite-Based Warning System Enchances Operating Safety,” undated (2 pages).
Furman, E., et al., “Keeping Track of RF,” GPS World, Feb. 2001 (6 pages).
Dept. of Transportation Federal Railroad Adminstration, Federal Register, vol. 66, No. 155, pp. 42352-42396, Aug. 10, 2001.
R.C. Kull, “End of Train Monitor System for Caboose Elimination,” Vehicular Technology Conference, 1985, 35th IEEE, vol. 35, May 21-23, 1985, pp. 299-303.
GE Harris Product Sheet: “TrainTalk,” undated (1 pages).
GE Harris Product Sheet: “IHub,” undated (4 pages).
GE Harris Product Sheet: “Powerful, Flexible Train Control in A Single User-Friendly Platform,” undated (4 pages).
GE Harris Product Sheet: “Enhancing Current Scheduling, Adds Planning Capabilities and Builds the Foundation for Future Train Control,” undated (2 pages).
GE Harris Product Sheet: “Advanced, Expandable Platform for All Your Railroad Cab Electronics,” undated (2 pages).
GE Harris Product Sheet: “Capture the Advantages of Total Rail Control and Management,” undated (4 pages).
GE Harris Product Sheet: “Universal Brake Control Valve Offers Flexibility and Performance,” undated (2 pages).
GE Harris Product Sheet: “Integrated Distributed Power and Electronic Brake System Sets a New Standarad for Safety and Reliability,” undated (2 pages).
“Test Confirm PTC Viability,” Railway Gazette International, Jul. 1998 (2 pages).
Dept. of Transportation Federal Railroad Adminstration, Code of Fedearl Regulations, Title 49, vol. 4, Revised Oct. 1, 2005, pp. 551-553.
OPS Systems, “Operations, laboratory and Maintenance Software,” Ftp://Ftp.Opssys.Com/OPSSupportPolicy.Com, Jan. 1, 2008 (3 pages).
“Motorola's 68HC11x Family of 8-Bit Micro-Controllers,” printed Oct. 7, 2008 (6 pages).
AAR Manual of Standards and Recommended Practices: Electronically Controlled Brake Systems: Electronically Controled Pneumatic (ECP) Cable-Based Brake Systems—Performance Requirements: Standard S-4200, pp. E-II 1-E-II 58, Implemented Feb. 2008.
AAR Maunal of Standards and Recommended Practices: Railway Electronics: End-of-Train Communications: Standard S-5701; pp. K-51-K-84, Revised 2005.
Analog Devices, “± g to ± 5g Single Chip Accelerometer with Signal Conditiong: ADXL05,” pp. 1-20, 1996.
Supplementary European Search Report issued in EP 08 79 6598, dated Mar. 15, 2011.
Office Action issued in EP 08 79 6598, mailed Dec. 20, 2011.
Office Action issued in MX/a/2010/001453, mailed Oct. 21, 2011.
English language abstract of DE 197 01 800, published Jul. 9, 1998.
U.S. Appl. No. 11/835,050.
U.S. Appl. No. 12/495,378.
Related Publications (1)
Number Date Country
20130325225 A1 Dec 2013 US
Divisions (1)
Number Date Country
Parent 12495378 Jun 2009 US
Child 13964915 US