The recent trend in miniaturizing integrated circuits (ICs) has resulted in smaller devices which consume less power yet provide more functionality at higher speeds. The miniaturization process has also resulted in more strict restriction on the layout design of the IC circuits. During the layout design of the IC circuits, functional or physical cells are often placed in a circuit layout and routed to form functional circuits. In addition to normally connected cells for forming functional circuits, the layout design of the IC circuits often include engineering change order (ECO) cells distributed in the layout plan. The ECO cells are not functionally connected to the normally functioning electronic components according to the original circuit design of the IC. Some ECO cells may have implemented functions that can be used later in design modifications when the ECO cells are connected to the normally functioning electronic components. Some ECO cells may have unconnected transistors that are connected later to perform circuit functions in design modifications. Even if ECO cells are not participating in the normal functions of the IC, the ECO cells are still subjected to design rule restrictions and design validation check.
Aspects of the present disclosure are best understood from the following detailed description when read with the accompanying figures. It is noted that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.
The following disclosure provides many different embodiments, or examples, for implementing different features of the provided subject matter. Specific examples of components, materials, values, steps, operations, materials, arrangements, or the like, are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. Other components, values, operations, materials, arrangements, or the like, are contemplated. For example, the formation of a first feature over or on a second feature in the description that follows may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features may be formed between the first and second features, such that the first and second features may not be in direct contact. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
Further, spatially relative terms, such as “beneath,” “below,” “lower,” “above,” “upper” and the like, may be used herein for ease of description to describe one element or feature's relationship to another element(s) or feature(s) as illustrated in the figures. The spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. The apparatus may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein may likewise be interpreted accordingly.
An engineering change order (ECO) cell structure generally includes a p-type active zone and an n-type active zone forming two parallel active zones extending in a horizontal direction. The ECO cell structure generally includes multiple p-type transistors in the p-type active zone and n-type transistors in n-type active zone. During initial design, the p-type transistors and the n-type transistors in an ECO cell structure are not sufficiently connected to become part of a normal functional circuit. For example, in some embodiments, the connections between the p-type transistors and the n-type transistors in the ECO cell are not sufficient to form a functional gate cell or a physical cell. In some embodiments, there are insufficient connections between an ECO cell and other normal functional circuit so that the ECO cell is not a functional part of other normal functional circuit. During design modifications, the connections between the p-type transistors and the n-type transistors in some of the ECO cells are modified, and some ECO cells become functional parts of other normal functional circuit.
An integrated circuit generally include multiple horizontal routing lines in a first metal layer overlies an interlayer dielectric layer covering the p-type transistors and the n-type transistors in an ECO cell. Some of the multiple horizontal routing lines over an ECO cell are unusable for inter-cell routings. It is generally desirable to minimize the number of the unusable horizontal routing lines over an ECO cell. Additionally, an integrated circuit generally also include multiple vertical routing lines in a second metal layer above the first metal layer. In some embodiments, when a predetermined number of the vertical routing lines passing over an ECO cell within two vertical boundaries of the ECO cell are reserved for the power grid lines, it is generally desirable to minimize the cell width of the ECO cell.
In
In
In
In
In
In some embodiments, the active zone 50p and the active zone 50n include isolation regions underneath the dummy gate-strips (e.g., 41, 49, and 45 in
In some embodiments, the active zones (e.g., 50p and 50n) are fabricated in the form of a continuous oxide diffusion (CNOD) zone which does not break at the boundary between two abutting cells for constructing a functional circuit. In some embodiments, the portion of the p-type active zone 50p within the semiconductor cell structure 100 is conductively isolated in the active zone from other portions of the p-type active zone outside the semiconductor cell structure 100, by the isolation regions (e.g., 51 and 57) at the vertical boundaries and the dummy gate-strips (e.g., 41 and 49) above the isolation regions. Similarly, the portion of the n-type active zone 50n within the semiconductor cell structure 100 is conductively isolated in the active zone from other portions of the n-type active zone outside the semiconductor cell structure 100, by the isolation regions (e.g., 53 and 59) at the vertical boundaries and the dummy gate-strips (e.g., 41 and 49) above the isolation regions. In some embodiments, the active region 63p of transistor T1p under the conductive segment 63 is conductively isolated in the active zone from the active region 65p of transistor T3p under the conductive segment 65, by the isolation region 54 and the dummy gate-strip 45 above the isolation region 54. The active region 64n of transistor T2n under the conductive segment 64 is conductively isolated in the active zone from the active region 66n of transistor T4n under the conductive segment 66, by the isolation region 56 and the dummy gate-strip 45 above the isolation region 56.
In some embodiments, the gate-strip 44 in
In some embodiments, one or more of the dummy gate-strips (e.g., 41, 45, and 49) in
In some embodiments, as shown in
In some embodiments, as shown in
In some embodiments, the supply voltages are conducted to the power rails (e.g., 31 and 32) in
In some embodiments, each of the vertical conducting lines 80A and 80B in the second metal layer M1 are conductively connected to one of the power rails 31 and 32 in the first metal layer M0 through one of the vias VIA0 between the second metal layer M1 and the first metal layer M0. In one example, the vertical conducting lines 80A conducts the upper supply voltage VDD to the power rail 31, and the vertical conducting lines 80B conducts the lower supply voltage VSS to the power rail 32. In another example, the vertical conducting lines 80A conducts the lower supply voltage VSS to the power rail 32, and the vertical conducting lines 80B conducts the upper supply voltage VDD to the power rail 31. In still another example, both the vertical conducting lines 80A and the vertical conducting lines 80B conduct the upper supply voltage VDD to the power rail 31, and additional vertical conducting lines crossing over other cells (not shown in the figure) are used as the vertical power conducting lines for conducting the lower supply voltage VSS to the power rail 32.
In
In
During the initial design of an integrated circuit, in some embodiments, the ECO cells such as the ECO cell structures 100A and 100B in
In some embodiments, each of the four transistors in the ECO cell structure 100B of
At block 720, channel regions of four transistors are formed in the two active zones. In some embodiments, as shown in
At block 730, two gate-strips each extending in the Y-direction is formed, and each of the two gate-strips intersects the two active zones over the channel regions. In some embodiments, as shown in
At block 740, eight conductive segments extending in the Y-direction are formed and each conductive segment is in conductive contact with an active region of one of the transistors. In some embodiments, as shown in
At block 750, a conducting element is formed to conductively join the first gate-strip with a conductive segment connected to a power rail. In some embodiments, as shown in
At block 760, a part of the conducting element between the first gate-strip and the second conductive segment is removed. In some embodiments, the mask pattern in a mask of the early generation is modified to form a mask of a later generation, specifying a disconnection of the conducting element between the first gate-strip and the second conductive segment. In the example as shown in
At block 770, horizontal routing lines extending in the X-direction are formed and direct conductive connections between selected horizontal routing lines and underneath conductive segments are formed through via connections. In some embodiments, the ECO cell structure 100 in
In some embodiments, EDA system 900 includes an APR system. Methods described herein of designing layout diagrams represent wire routing arrangements, in accordance with one or more embodiments, are implementable, for example, using EDA system 900, in accordance with some embodiments.
In some embodiments, EDA system 900 is a general purpose computing device including a hardware processor 902 and a non-transitory, computer-readable storage medium 904. Storage medium 904, amongst other things, is encoded with, i.e., stores, computer program code 906, i.e., a set of executable instructions. Execution of instructions 906 by hardware processor 902 represents (at least in part) an EDA tool which implements a portion or all of the methods described herein in accordance with one or more embodiments (hereinafter, the noted processes and/or methods).
Processor 902 is electrically coupled to computer-readable storage medium 904 via a bus 908. Processor 902 is also electrically coupled to an I/O interface 910 by bus 908. A network interface 912 is also electrically connected to processor 902 via bus 908. Network interface 912 is connected to a network 914, so that processor 902 and computer-readable storage medium 904 are capable of connecting to external elements via network 914. Processor 902 is configured to execute computer program code 906 encoded in computer-readable storage medium 904 in order to cause system 900 to be usable for performing a portion or all of the noted processes and/or methods. In one or more embodiments, processor 902 is a central processing unit (CPU), a multi-processor, a distributed processing system, an application specific integrated circuit (ASIC), and/or a suitable processing unit.
In one or more embodiments, computer-readable storage medium 904 is an electronic, magnetic, optical, electromagnetic, infrared, and/or a semiconductor system (or apparatus or device). For example, computer-readable storage medium 904 includes a semiconductor or solid-state memory, a magnetic tape, a removable computer diskette, a random access memory (RAM), a read-only memory (ROM), a rigid magnetic disk, and/or an optical disk. In one or more embodiments using optical disks, computer-readable storage medium 904 includes a compact disk-read only memory (CD-ROM), a compact disk-read/write (CD-R/W), and/or a digital video disc (DVD).
In one or more embodiments, storage medium 904 stores computer program code 906 configured to cause system 900 (where such execution represents (at least in part) the EDA tool) to be usable for performing a portion or all of the noted processes and/or methods. In one or more embodiments, storage medium 904 also stores information which facilitates performing a portion or all of the noted processes and/or methods. In one or more embodiments, storage medium 904 stores library 907 of standard cells including such standard cells as disclosed herein.
EDA system 900 includes I/O interface 910. I/O interface 910 is coupled to external circuitry. In one or more embodiments, I/O interface 910 includes a keyboard, keypad, mouse, trackball, trackpad, touchscreen, and/or cursor direction keys for communicating information and commands to processor 902.
EDA system 900 also includes network interface 912 coupled to processor 902. Network interface 912 allows system 900 to communicate with network 914, to which one or more other computer systems are connected. Network interface 912 includes wireless network interfaces such as BLUETOOTH, WIFI, WIMAX, GPRS, or WCDMA; or wired network interfaces such as ETHERNET, USB, or IEEE-1364. In one or more embodiments, a portion or all of noted processes and/or methods, is implemented in two or more systems 900.
System 900 is configured to receive information through I/O interface 910. The information received through I/O interface 910 includes one or more of instructions, data, design rules, libraries of standard cells, and/or other parameters for processing by processor 902. The information is transferred to processor 902 via bus 908. EDA system 900 is configured to receive information related to a UI through I/O interface 910. The information is stored in computer-readable medium 904 as user interface (UI) 942.
In some embodiments, a portion or all of the noted processes and/or methods is implemented as a standalone software application for execution by a processor. In some embodiments, a portion or all of the noted processes and/or methods is implemented as a software application that is a part of an additional software application. In some embodiments, a portion or all of the noted processes and/or methods is implemented as a plug-in to a software application. In some embodiments, at least one of the noted processes and/or methods is implemented as a software application that is a portion of an EDA tool. In some embodiments, a portion or all of the noted processes and/or methods is implemented as a software application that is used by EDA system 900. In some embodiments, a layout diagram which includes standard cells is generated using a tool such as VIRTUOSO® available from CADENCE DESIGN SYSTEMS, Inc., or another suitable layout generating tool.
In some embodiments, the processes are realized as functions of a program stored in a non-transitory computer readable recording medium. Examples of a non-transitory computer readable recording medium include, but are not limited to, external/removable and/or internal/built-in storage or memory unit, e.g., one or more of an optical disk, such as a DVD, a magnetic disk, such as a hard disk, a semiconductor memory, such as a ROM, a RAM, a memory card, and the like.
In
Design house (or design team) 1020 generates an IC design layout diagram 1022. IC design layout diagram 1022 includes various geometrical patterns designed for an IC device 1060. The geometrical patterns correspond to patterns of metal, oxide, or semiconductor layers that make up the various components of IC device 1060 to be fabricated. The various layers combine to form various IC features. For example, a portion of IC design layout diagram 1022 includes various IC features, such as an active region, gate electrode, source and drain, metal lines or vias of an interlayer interconnection, and openings for bonding pads, to be formed in a semiconductor substrate (such as a silicon wafer) and various material layers disposed on the semiconductor substrate. Design house 1020 implements a proper design procedure to form IC design layout diagram 1022. The design procedure includes one or more of logic design, physical design or place and route. IC design layout diagram 1022 is presented in one or more data files having information of the geometrical patterns. For example, IC design layout diagram 1022 can be expressed in a GDSII file format or DFII file format.
Mask house 1030 includes data preparation 1032 and mask fabrication 1044. Mask house 1030 uses IC design layout diagram 1022 to manufacture one or more masks 1045 to be used for fabricating the various layers of IC device 1060 according to IC design layout diagram 1022. Mask house 1030 performs mask data preparation 1032, where IC design layout diagram 1022 is translated into a representative data file (“RDF”). Mask data preparation 1032 provides the RDF to mask fabrication 1044. Mask fabrication 1044 includes a mask writer. A mask writer converts the RDF to an image on a substrate, such as a mask (reticle) 1045 or a semiconductor wafer 1053. The design layout diagram 1022 is manipulated by mask data preparation 1032 to comply with particular characteristics of the mask writer and/or requirements of IC fab 1050. In
In some embodiments, mask data preparation 1032 includes optical proximity correction (OPC) which uses lithography enhancement techniques to compensate for image errors, such as those that can arise from diffraction, interference, other process effects and the like. OPC adjusts IC design layout diagram 1022. In some embodiments, mask data preparation 1032 includes further resolution enhancement techniques (RET), such as off-axis illumination, sub-resolution assist features, phase-shifting masks, other suitable techniques, and the like or combinations thereof. In some embodiments, inverse lithography technology (ILT) is also used, which treats OPC as an inverse imaging problem.
In some embodiments, mask data preparation 1032 includes a mask rule checker (MRC) that checks the IC design layout diagram 1022 that has undergone processes in OPC with a set of mask creation rules which contain certain geometric and/or connectivity restrictions to ensure sufficient margins, to account for variability in semiconductor manufacturing processes, and the like. In some embodiments, the MRC modifies the IC design layout diagram 1022 to compensate for limitations during mask fabrication 1044, which may undo part of the modifications performed by OPC in order to meet mask creation rules.
In some embodiments, mask data preparation 1032 includes lithography process checking (LPC) that simulates processing that will be implemented by IC fab 1050 to fabricate IC device 1060. LPC simulates this processing based on IC design layout diagram 1022 to create a simulated manufactured device, such as IC device 1060. The processing parameters in LPC simulation can include parameters associated with various processes of the IC manufacturing cycle, parameters associated with tools used for manufacturing the IC, and/or other aspects of the manufacturing process. LPC takes into account various factors, such as aerial image contrast, depth of focus (“DOF”), mask error enhancement factor (“MEEF”), other suitable factors, and the like or combinations thereof. In some embodiments, after a simulated manufactured device has been created by LPC, if the simulated device is not close enough in shape to satisfy design rules, OPC and/or MRC are be repeated to further refine IC design layout diagram 1022.
It should be understood that the above description of mask data preparation 1032 has been simplified for the purposes of clarity. In some embodiments, data preparation 1032 includes additional features such as a logic operation (LOP) to modify the IC design layout diagram 1022 according to manufacturing rules. Additionally, the processes applied to IC design layout diagram 1022 during data preparation 1032 may be executed in a variety of different orders.
After mask data preparation 1032 and during mask fabrication 1044, a mask 1045 or a group of masks 1045 are fabricated based on the modified IC design layout diagram 1022. In some embodiments, mask fabrication 1044 includes performing one or more lithographic exposures based on IC design layout diagram 1022. In some embodiments, an electron-beam (e-beam) or a mechanism of multiple e-beams is used to form a pattern on a mask (photomask or reticle) 1045 based on the modified IC design layout diagram 1022. Mask 1045 can be formed in various technologies. In some embodiments, mask 1045 is formed using binary technology. In some embodiments, a mask pattern includes opaque regions and transparent regions. A radiation beam, such as an ultraviolet (UV) beam, used to expose the image sensitive material layer (e.g., photoresist) which has been coated on a wafer, is blocked by the opaque region and transmits through the transparent regions. In one example, a binary mask version of mask 1045 includes a transparent substrate (e.g., fused quartz) and an opaque material (e.g., chromium) coated in the opaque regions of the binary mask. In another example, mask 1045 is formed using a phase shift technology. In a phase shift mask (PSM) version of mask 1045, various features in the pattern formed on the phase shift mask are configured to have proper phase difference to enhance the resolution and imaging quality. In various examples, the phase shift mask can be attenuated PSM or alternating PSM. The mask(s) generated by mask fabrication 1044 is used in a variety of processes. For example, such a mask(s) is used in an ion implantation process to form various doped regions in semiconductor wafer 1053, in an etching process to form various etching regions in semiconductor wafer 1053, and/or in other suitable processes.
IC fab 1050 includes wafer fabrication 1052. IC fab 1050 is an IC fabrication business that includes one or more manufacturing facilities for the fabrication of a variety of different IC products. In some embodiments, IC Fab 1050 is a semiconductor foundry. For example, there may be a manufacturing facility for the front end fabrication of a plurality of IC products (front-end-of-line (FEOL) fabrication), while a second manufacturing facility may provide the back end fabrication for the interconnection and packaging of the IC products (back-end-of-line (BEOL) fabrication), and a third manufacturing facility may provide other services for the foundry business.
IC fab 1050 uses mask(s) 1045 fabricated by mask house 1030 to fabricate IC device 1060. Thus, IC fab 1050 at least indirectly uses IC design layout diagram 1022 to fabricate IC device 1060. In some embodiments, semiconductor wafer 1053 is fabricated by IC fab 1050 using mask(s) 1045 to form IC device 1060. In some embodiments, the IC fabrication includes performing one or more lithographic exposures based at least indirectly on IC design layout diagram 1022. Semiconductor wafer 1053 includes a silicon substrate or other proper substrate having material layers formed thereon. Semiconductor wafer 1053 further includes one or more of various doped regions, dielectric features, multilevel interconnects, and the like (formed at subsequent manufacturing steps).
Details regarding an integrated circuit (IC) manufacturing system (e.g., system 1000 of
One aspect of this description relates to a semiconductor cell structure. The semiconductor cell structure includes a first-type active zone and a second-type active zone each extending in a first direction that is perpendicular to a second direction. The semiconductor cell structure also includes a first pair of conductive segments intersecting the first-type active zone over active regions of a first transistor, a second pair of conductive segments intersecting the second-type active zone over active regions of a second transistor, a third pair of conductive segments each intersecting the first-type active zone over active regions of a third transistor, and a fourth pair of conductive segments each intersecting the second-type active zone over active regions of a fourth transistor. The first conductive segment in the first pair is configured to have a first supply voltage, and the second conductive segment in the second pair is configured to have a second supply voltage. The semiconductor cell structure further includes a first gate-strip and a second gate-strip, extending in the second direction. The first gate-strip intersects the first-type active zone over a first channel region of the first transistor and intersects the second-type active zone over a second channel region of the second transistor. The first gate-strip is conductively connected to the second conductive segment. The second gate-strip intersects the first-type active zone over a third channel region of the third transistor and intersects the second-type active zone over a fourth channel region of the fourth transistor. The semiconductor cell structure still includes a first dummy gate-strip and a second dummy gate-strip, extending in the second direction. The first dummy gate-strip separates from the first gate-strip by one Contact Poly Pitch (CPP) along the first direction. The second dummy gate-strip separates from the second gate-strip by one CPP along the first direction. The first gate-strip and the second gate-strip are separated from each other by two CPPs along the first direction, and wherein the first dummy gate-strip and the second dummy gate-strip are separated from each other by four CPPs along the first direction.
Another aspect of this description relates to an integrated circuit. The integrated circuit includes a first-type active zone and a second-type active zone each extending in a first direction that is perpendicular to a second direction, and two engineering change order (ECO) cell structures abutting each other each other at a middle dummy gate-strip. Each of the two ECO cell structures includes a first gate-strip and a second gate-strip each extending in the second direction. The first gate-strip conductively connects a gate of a first transistor with a gate of a second transistor, and the second gate-strip conductively connects a gate of a third transistor with a gate of a fourth transistor. The first gate-strip and the second gate-strip are separated from each other by two CPPs along the first direction. Each of the two ECO cell structures also includes a side dummy gate-strip extending in the second direction and a plurality of conductive segments each extending in the second direction. The side dummy gate-strip separates from the middle dummy gate-strip by four CPPs along the first direction. The first gate-strip and the second gate-strip are between the side dummy gate-strip and the middle dummy gate-strip. Among the plurality of conductive segments, a first conductive segment is in conductive contact with an active region of the first transistor, and a second conductive segment is in conductive contact with an active region of the second transistor. The first conductive segment is configured to have a first supply voltage and the second conductive segment is configured to have a second supply voltage. The integrated circuit further includes a conducting element conductively joining the first gate-strip with the second conductive segment in one of the of the two ECO cell structures.
Still another aspect of this description relates to a method of generating a set of masks for fabricating a semiconductor cell structure. The method includes forming a first channel region between two active regions of a first transistor in a first-type active zone extending in a first direction, a second channel region between two active regions of a second transistor in a second-type active zone, a third channel region between two active regions of a third transistor in the first-type active zone, and a fourth channel region between two active regions of a fourth transistor in the second-type active zone. The method also includes forming a first gate-strip, a second gate-strip, a first dummy gate-strip and a second dummy gate-strip. The first gate-strip intersects the first-type active zone over the first channel region and intersects the second-type active zone over the second channel region. The second gate-strip intersects the first-type active zone over the third channel region and intersects the second-type active zone over the fourth channel region. The first gate-strip and the second gate-strip are separated from each other by two CPPs along the first direction. The first dummy gate-strip and the second dummy gate-strip are separated from each other by four CPPs along the first direction. The method further includes forming four pairs of conductive segments each extending in a second direction. Each of the four pairs of conductive segments is associated with a corresponding transistor and includes two conductive segments each conductively contacting one of the two active regions of the corresponding transistor. Among the conductive segments, a first conductive segment in a first pair is configured to have a first supply voltage and a second conductive segment in a second pair is configured to have a second supply voltage. The method still includes forming a mask pattern, in a mask of an early generation, specifying a conducting element conductively joining the first gate-strip with the second conductive segment, and modifying the mask pattern in the mask of the early generation, to form a mask of a later generation, which specifies a disconnection of the conducting element between the first gate-strip and the second conductive segment.
It will be readily seen by one of ordinary skill in the art that one or more of the disclosed embodiments fulfill one or more of the advantages set forth above. After reading the foregoing specification, one of ordinary skill will be able to affect various changes, substitutions of equivalents and various other embodiments as broadly disclosed herein. It is therefore intended that the protection granted hereon be limited only by the definition contained in the appended claims and equivalents thereof.
The present application is a continuation of U.S. application Ser. No. 17/081,438, filed Oct. 27, 2020, which is a continuation of U.S. application Ser. No. 16/546,973, filed Aug. 21, 2019, now U.S. Pat. No. 10,846,458, issued Nov. 24, 2020, which claims the priority of U.S. Provisional Application No. 62/724,855, filed Aug. 30, 2018, which is incorporated herein by reference in its entirety.
| Number | Name | Date | Kind |
|---|---|---|---|
| 4935790 | Cappelletti et al. | Jun 1990 | A |
| 5656967 | Casper et al. | Aug 1997 | A |
| 6236258 | Hoenigschmid et al. | May 2001 | B1 |
| RE37308 | Cappelletti et al. | Aug 2001 | E |
| 6642555 | Ishida | Nov 2003 | B1 |
| 7260442 | Hwang et al. | Aug 2007 | B2 |
| 7528455 | Ahn | May 2009 | B2 |
| 9256709 | Yu et al. | Feb 2016 | B2 |
| 9412800 | Kim | Aug 2016 | B2 |
| 10846458 | Chen et al. | Nov 2020 | B2 |
| 11164863 | Do | Nov 2021 | B2 |
| 11239355 | Naito | Feb 2022 | B2 |
| 11275885 | Chen | Mar 2022 | B2 |
| 20070152244 | Ahn | Jul 2007 | A1 |
| 20070152281 | Ahn | Jul 2007 | A1 |
| 20090315079 | Tien et al. | Dec 2009 | A1 |
| 20140040838 | Liu et al. | Feb 2014 | A1 |
| 20150214260 | Inui | Jul 2015 | A1 |
| 20150278429 | Chang | Oct 2015 | A1 |
| 20160284705 | Chung | Sep 2016 | A1 |
| 20180182766 | Huang et al. | Jun 2018 | A1 |
| 20200019672 | Peng et al. | Jan 2020 | A1 |
| 20200035819 | Naito | Jan 2020 | A1 |
| 20200074041 | Chen | Mar 2020 | A1 |
| 20200126901 | Chen et al. | Apr 2020 | A1 |
| 20210036041 | Miyamoto et al. | Feb 2021 | A1 |
| 20210089700 | Lu et al. | Mar 2021 | A1 |
| 20220246602 | Yang | Aug 2022 | A1 |
| Number | Date | Country | |
|---|---|---|---|
| 20220164518 A1 | May 2022 | US |
| Number | Date | Country | |
|---|---|---|---|
| 62724855 | Aug 2018 | US |
| Number | Date | Country | |
|---|---|---|---|
| Parent | 17081438 | Oct 2020 | US |
| Child | 17670370 | US | |
| Parent | 16546973 | Aug 2019 | US |
| Child | 17081438 | US |