Membership
Tour
Register
Log in
Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track Devices therefor Packing sleepers
Follow
Industry
CPC
E01B27/00
This industry / category may be too specific. Please go to a parent level for more data
Parent Industries
E
FIXED CONSTRUCTIONS
E01
Road, railway construction
E01B
PERMANENT WAY PERMANENT-WAY TOOLS MACHINES FOR MAKING RAILWAYS OF ALL KINDS
Current Industry
E01B27/00
Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track Devices therefor Packing sleepers
Sub Industries
E01B27/02
Placing the ballast Making ballastway Redistributing ballasting material Machines or devices therefor Levelling means
E01B27/021
by devices moving underneath the track
E01B27/022
by devices moving on the track with or without spreading or levelling
E01B27/023
Spreading, levelling or redistributing ballast already placed
E01B27/025
by means of non-driven tools
E01B27/026
by means of driven tools
E01B27/027
Loosening ballasting material
E01B27/028
Compacting ballasting material; Performing ballast cores or seats for sleepers
E01B27/04
Removing the ballast Machines therefor, whether or not additionally adapted for taking-up ballast
E01B27/06
Renewing or cleaning the ballast in situ, wih or without concurrent work on the track
E01B27/08
the track having been taken-up
E01B27/10
without taking-up track
E01B27/102
Removing unwanted material without removing the ballast
E01B27/105
the track having been lifted
E01B27/107
along between the tracks only
E01B27/11
combined with concurrent renewal of track components
E01B27/12
Packing sleepers, with or without concurrent work on the track Compacting track-carrying ballast
E01B27/13
Packing sleepers, with or without concurrent work on the track
E01B27/14
Manual tools or hand-held power tools therefor
E01B27/16
Sleeper-tamping machines
E01B27/17
combined with means for lifting, levlling or slewing the track
E01B27/18
by introducing additional fresh material under the sleepers
E01B27/20
Compacting the material of the track-carrying ballastway
Industries
Overview
Organizations
People
Information
Impact
Please log in for detailed analytics