Information
-
Patent Application
-
20020005296
-
Publication Number
20020005296
-
Date Filed
September 10, 200125 years ago
-
Date Published
January 17, 200224 years ago
-
CPC
-
US Classifications
-
International Classifications
Abstract
Via holes are plated through the substrate of a surface mount package. The leads of an electronic device is inserted in the plated-through via holes. The bottom of the plated through metal is enlarged as pads to provide reliable soldering surfaces to a motherboard. Upon heating the leads are soldered to the walls of the plated through via holes. Alternatively, the leads can be folded before inserting into the plated-through via holes.
Description
BACKGROUND OF THE INVENTION
[0001] (1) Field of the Invention
[0002] This invention relates to package for electronic devices, in particular to a surface mount package.
[0003] (2) Background of the Invention
[0004] Many kinds of electronic devices such as capacitors, resistors have long leads. With the advent of printed circuits, it is desirable to use surface mount packages for the devices for easy connection to the printed circuit board.
[0005]
FIG. 1A shows top view of a conventional package for a typical long lead device. A substrate 20 has two via holes 24 through which the leads of a device (not shown) can extend. FIG. 1B shows the side view of section A-A′ of FIG. 1A. The substrate 20 has two grooves 22 outside the via holes 24. When the leads of a device is inserted through the via holes, the leads are bent outward against the grooves 22 and recessed in the grooves 22 as shown in FIG. 1C. FIG. 1D shows the side view of the package with a device 10 inserted through the package. The two leads 12 of the device 10 are inserted through the substrate 20 and bent outward. Because of the recessed grooves 22, the bottom ends of the bent leads 12 are flush with the bottom of the substrate 20. Thus the bottom surface of the package is flat for surface mounting to a printed circuit board.
[0006] However the rounded ends of the leads do not provide a big contact area for soldering to the printed circuit board, the soldering reliability. Although the ends of the leads 12 may be crimped flat to increase the contact area, the increase in soldering, area is limited.
SUMMARY OF THE INVENTION
[0007] An object of this invention is provide a package for surface mounting of long-lead electronic devices. Another object of this invention is to provide a big-area bonding pad for improving the soldering reliability of a surface mount package.
[0008] These objects are achieved by using plated through via holes in the substrate of the surface-mount package. The leads of the device are inserted into the plated through via holes. The bottom of the plated through metal is enlarged as a pad to provide a large reliable surface mounting surface. Upon heating, the leads are soldered to the walls of the plated through holes. Alternatively, the leads of leads can be folded before inserting into the plated through holes.
BRIEF DESCRIPTION OF SEVERAL VIEWS OF THE DRAWING
[0009]
FIG. 1A shows a top view of a prior art surface mount package, FIG. 1B shows a section view of the package shown in FIG. 1A; FIG. 1C shows the bottom view of the package shown in FIG. 1A; FIG. 1D shows the side view of the package when a long-lead device is mounted.
[0010]
FIG. 2A shows the top view of the package of the present invention, FIG. 2B shows the section view of the package shown in FIG. 2A; FIG. 2C shown the bottom view of the package shown in FIG. 2A; FIG. 2D shows the side view of the package with a long-lead device mounted.
DETAILED DESCRIPTION OF THE INVENTION
[0011] The top view of package of the present invention is shown in FIG. 2A. The insulating substrate 30 of the package has two via holes 34. The via holes are plated through with soldering material 36 as shown in the section view of the package FIG. 2B. The bottom of the plated-through metal 36 adheres to the bottom of the substrate 30 and is enlarged into flat pads as shown in FIG. 2C. These enlarged bottom pads provide reliable soldering contacts for surface mounting to a mother-board.
[0012]
FIG. 2D shows the side view of the package with the leads 12 of a long-lead device 10 inserted into the plated-through via holes of the substrate 30. Upon heating, the soldering material of plated-through holes forms an intimate soldered contact with the long leads 12. Meanwhile, the enlarged bottom pads 36 of the plated-through via holes can form intimate soldered contacts with a motherboard (not shown).
[0013] The soldering material 36 for the via hole can be a tin-lead alloy, which melts upon heating.
[0014] If the long leads of the device 10 is very thin, the leads 22 of the device 10 can be folded inside the plated-through via hole 36 as shown in FIG. 2E. Folding provides more contact area of the leads 22 with the plated-through 36.
[0015] While the preferred embodiment of the invention has been described, it will be apparent to those skilled in the art that various modifications may be made in the embodiment for the surface mount package without departing from the spirit of the present invention. Such modifications are all within the scope of this invention.
Claims
- 1. A surface-mount package for an electronic device with at least one long lead wire comprising:
an insulating substrate; at least one via hole through said substrate for said lead wire to be inserted, and soldering material plating along the wall of said via hole for soldering to said lead wire and extending into a flat soldering pad along the bottom of said substrate for surface mounting to a motherboard.
- 2. A surface mount package for an electronic device as described in claim 1, wherein there are two via holes.
- 3. A surface mount package as described in claim 1, wherein said lead wire is inserted to a depth no deeper than the thickness of the substrate.
- 4. A surface mount package as described in claim 1, wherein said lead wire is folded inside said via hole.
- 5. A surface mount package as described in claim 1, wherein said soldering material is a tin-lead alloy.
Continuations (1)
|
Number |
Date |
Country |
| Parent |
09399039 |
Sep 1999 |
US |
| Child |
09949558 |
Sep 2001 |
US |