Surface mount package for long lead devices

Information

  • Patent Grant
  • 6423906
  • Patent Number
    6,423,906
  • Date Filed
    Monday, September 10, 2001
    23 years ago
  • Date Issued
    Tuesday, July 23, 2002
    22 years ago
Abstract
Via holes are plated through the substrate of a surface mount package. The leads of an electronic device is inserted in the plated-through via holes. The bottom of the plated through metal is enlarged as pads to provide reliable soldering surfaces to a motherboard. Upon heating the leads are soldered to the walls of the plated through via holes. Alternatively, the leads can be folded before inserting into the plated-through via holes.
Description




BACKGROUND OF THE INVENTION




(1) Field of the Invention




This invention relates to package for electronic devices, in particular to a surface mount package.




(2) Background of the Invention




Many kinds of electronic devices such as capacitors, resistors have long leads. With the advent of printed circuits, it is desirable to use surface mount packages for the devices for easy connection to the printed circuit board.





FIG. 1A

shows top view of a conventional package for a typical long lead device. A substrate


20


has two via holes


24


through which the leads of a device (not shown) can extend.

FIG. 1B

shows the side view of section A—A′ of FIG.


1


A. The substrate


20


has two grooves


22


outside the via holes


24


. When the leads of a device is inserted through the via holes, the leads are bent outward against the grooves


22


and recessed in the grooves


22


as shown in FIG.


1


C.

FIG. 1D

shows the side view of the package with a device


10


inserted through the package. The two leads


12


of the device


10


are inserted through the substrate


20


and bent outward. Because of the recessed grooves


22


, the bottom ends of the bent leads


12


are flush with the bottom of the substrate


20


. Thus the bottom surface of the package is flat for surface mounting to a printed circuit board.




However the rounded ends of the leads do not provide a big contact area for soldering to the printed circuit board, the soldering reliability. Although the ends of the leads


12


may be crimped flat to increase the contact area, the increase in soldering area is limited.




SUMMARY OF THE INVENTION




An object of this invention is provide a package for surface mounting of long-lead electronic devices. Another object of this invention is to provide a big-area bonding pad for improving the soldering reliability of a surface mount package.




These objects are achieved by using plated through via holes in the substrate of the surface-mount package. The leads of the device are inserted into the plated through via holes. The bottom of the plated through metal is enlarged as a pad to provide a large reliable surface mounting surface. Upon heating the leads are soldered to the walls of the plated through holes. Alternatively, the leads of leads can be folded before inserting into the plated through holes.











BRIEF DESCRIPTION OF SEVERAL VIEWS OF THE DRAWING





FIG. 1A

shows a top view of a prior art surface mount package;

FIG. 1B

shows a section view of the package shown in

FIG. 1A

;

FIG. 1C

shows the bottom view of the package shown in

FIG. 1A

;

FIG. 1D

shows the side view of the package when a long-lead device is mounted.





FIG. 2A

shows the top view of the package of the present invention;

FIG. 2B

shows the section view of the package shown in

FIG. 2A

;

FIG. 2C

shown the bottom view of the package shown in

FIG. 2A

;

FIG. 2D

shows the side view of the package with a long-lead device mounted.











DETAILED DESCRIPTION OF THE INVENTION




The top view of package of the present invention is shown in FIG.


2


A. The insulating substrate


30


of the package has two via holes


34


. The via holes are plated through with soldering material


36


as shown in the section view of the package FIG.


2


B. The bottom of the plated-through metal


36


adheres to the bottom of the substrate


30


and is enlarged into flat pads as shown in FIG.


2


C. These enlarged bottom pads provide reliable soldering contacts for surface mounting to a mother-board.





FIG. 2D

shows the side view of the package with the leads


12


of a long-lead device


10


inserted into the plated-through via holes of the substrate


30


. Upon heating, the soldering material of plated-through holes forms an intimate soldered contact with the long leads


12


. Meanwhile, the enlarged bottom pads


36


of the plated-through via holes can form intimate soldered contacts with a motherboard (not shown).




The soldering material


36


for the via hole can be a tin-lead alloy, which melts upon heating. If the long leads of the device


10


is very thin, the leads


22


of the device


10


can be folded inside the plated-through via hole


36


as shown in FIG.


2


E. Folding provides more contact area of the leads


22


with the plated-through


36


.




While the preferred embodiment of the invention has been described, it will be apparent to those skilled in the art that various modifications may be made in the embodiment for the surface mount package without departing from the spirit of the present invention. Such modifications are all within the scope of this invention.



Claims
  • 1. A surface-mounted package for an electronic device with at least one long lead wire, comprising:an electronic device with at least one long lead wire; an insulated substrate; at least one bottom contact for surface-mounting said substrate on and making connection to a motherboard; at least one via hole through said substrate for said lead wire to be inserted to a depth no deeper than the thickness of the substrate; soldering material plating along the wall of said via hole for soldering to said lead wire; and an extension from said soldering material for connection to said bottom contact.
  • 2. A surface mount package as described in claim 1, wherein said lead wire is folded back inside said via hole.
Parent Case Info

This application is a continuation of Ser. No. 09/399039, filed Sep. 21, 1999.

US Referenced Citations (12)
Number Name Date Kind
2754486 Hathorn Jul 1956 A
3991347 Hollyday Nov 1976 A
4303798 Paunovic Dec 1981 A
5160270 Reymond Nov 1992 A
5180440 Siegel et al. Jan 1993 A
5203077 Reddy Apr 1993 A
5319159 Watanabe et al. Jun 1994 A
5398165 Niinou Mar 1995 A
5699613 Chong et al. Dec 1997 A
5726862 Huynh et al. Mar 1998 A
5953214 Dranchak et al. Sep 1999 A
6071756 Sines et al. Jun 2000 A
Continuations (1)
Number Date Country
Parent 09/399039 Sep 1999 US
Child 09/949558 US